Title Page
-
Project Name
-
Project Number
-
Conducted on
-
Prepared by
-
Audit number
PPE
-
Required PPE is worn
-
Eye & sun protection is available
-
Hearing protection is available
-
Gloves and dust masks are available
Permits
-
Relevant permits are current
-
Permit conditions are adhered to
Machine Operations
-
Daily plant check has been recorded
-
Seat belt is worn
-
Plant door is closed
-
Plant covers have been removed
-
If not in use, plant is secure
-
Subcontractors' plant records are up to date
Lifting Operations
-
Lifting gear has current test tag
-
Lifting gear is appropriate for the task
-
Personnel is clear of suspended load
Shafts & Trenching
-
Existing services have been located
-
Excavation is secured from traffic
-
Excavation is secured from pedestrians
-
Personnel are within ground supports
-
Barricades are in place
-
Spoil is well away from edge of trench
-
Excavation is adequately supported
-
Means of entry/exit are provided
-
Ladders are secured
-
Fall protection gear is in place
-
Fall protection gear has current test tag
-
CSE gear is available
-
Shafts are covered
Incident Reporting
-
Known incidents are recorded
-
Incidents are reported
General Site Conditions
-
Site is safe and secure
-
Return to work poster is displayed
-
Emergency numbers are displayed
-
Project information sign is displayed
-
Toilet is clean
-
First aid kit is available
-
Spill kit is available
-
Housekeeping is adequate
-
Site traffic is controlled
-
TMP is in place and complied with
-
Site run-off is controlled
-
Sediment controls are as per EMP
-
Erosion controls are as per EMP
-
Flora & fauna management is as per EMP
-
Lighting is available for night work
-
Electrical gear has current test tags
-
Extinguishers have current test tags
-
Parked vehicles have minimal impact on road users, pedestrians and cyclists
Project Documents
-
Site folder is available
-
Latest constructions plans are on site
-
Inductions are up to date
-
Personnel are inducted to SWMS
-
Personnel are inducted to EMP
-
Personnel are inducted to CHMP
-
Daily risk monitoring record is current
-
Chain & Sling register is complete
-
TBM records are complete
-
Subcontractors’ docs are up to date
Pipe Laying
-
Approved materials only are in use
-
Materials are stored correctly
-
Defective materials are isolated
-
Works are as per design
Safety 1st Fundamentals
-
Safety 1st fundamentals are complied with