Title Page
Details
-
Conducted on
-
Prepared by
-
Name of Competent Person
-
Client and Tenure
- Hafod
- Live West
- Sanctuary
- Owner Occupier
- Privately Rented
- Other
-
Who?
-
Survey Type
-
First Line of Address
-
Front Elevation Photo
-
GPS
-
Project
Mid & Post Install PV Survey
Mid Install
-
Mid Install Photo Showing Mounting System
-
Mid Install Photo Showing PV Panels
-
Mid Install Photo Showing Cable Runs/Entry
-
Has Import Meter Been Replaced Since The Pre Installation Building Inspection Was Completed
-
Type of Meter Fitted
-
Make and Model of Meter
-
Meter Serial Number
-
See PIBI for Import Meter Data
-
Does Meter require changing?
-
Why
Post Install
-
Was a Smoke Detector fitted in the Loft
-
Is one already in place
-
Why has one not been fitted
-
What is the Make and Model
-
Photo Evidence
-
Was an Additional Garage DB fitted
-
Garage DB Make and Model
- Crabtree Starbreaker
- Hager
- MK
- Lewden
- Wylex
- Schneider
- Other
- Unable to Access
-
What Brand?
-
What Model?
-
Was Earthing to Gas Meter Fitted
-
Was Earthing to Water Main Fitted
-
Generation Meter Fitted
-
Generation Meter Make
-
Generation Meter Model No.
-
Generation Meter Serial No.
-
Generation Meter Reading (kWh)
-
Where is it located?
- Under Stairs
- Front Hallway
- Cupboard
- External
- Other
- Under Sink
- Unknown
-
Where?
-
Fitted Inverter Location
-
Where is it located?
-
Was a PV Diverter Fitted? (Eddi)
-
Is Battery Storage Fitted
-
Where is it Fitted?
-
Has Bird Mesh been Fitted?
-
Fitted System Declared Net Capacity (kw)
-
What brand/model mounting system were fitted
-
What brand/model Photovoltaic panels were fitted
-
Photo of fitted PV panels
-
Photo showing DC cable runs
-
Photo showing AC cable runs
Shading
-
Is there any shading applicable to the system
-
Has a shading analysis been undertaken
-
Why?
-
Notes
Battery Storage
Battery Storage
-
Is a battery storage system being fitted
Mid Install
-
Mid Install Photo Showing EESS
-
Mid Install Photo Showing Cable Runs/Entry
Post Install
-
Post Install photo of fitted EESS
System Design/Equipment Selection and connection
-
Equipment complies with relevant standards
-
System installed in accordance with design
-
Equipment correctly selected and erected - according to standards and manufacturers instructions
-
Equipment undamaged
-
Conductors correctly connected, identified and routed
-
Conductors selected are suitable for voltage and current requirements
-
Switchgear and ancillary devices suitable for voltage and current requirements
-
Switchgear and ancillary devices correctly installed and connected
-
Components selected and installed to suit the locations and any external influences
Protection against electric shock
-
Basic Protection (prevention of contact with live parts)
-
Protection by insulation of live parts (e.g. conductors - correctly applied and suitable
-
Protection by the use of barriers or enclosures - suitable and appropriate IP rating
-
Additional Protection (additional protection measures)
-
Protection by the use of an RCD not exceeding 30ma
-
Supplementary bonding
-
Other methods of protection
-
SELV
-
PELV
-
Automatic disconnection of supply
-
Suitable main earth provided
-
Earth connections suitably installed
-
RCDs provided for fault protection
General
-
Equipment and circuits deployed to prevent mutual detrimental influence
-
Equipment location to allow suitable access arrangements
-
Labels and signs displayed and durable
Back up or island mode power supply
-
Does this system provide backup or island mode
-
Isolation of grid supply current carrying conductors (see 9.4 of code of practice)
-
Provision of consumer's earth electrode (see 9.4.10 of code of practice)
-
Additional protection by RCD's to supplement overcurrent protective devices to ensure adequate disconnection times are met (see 9.4.11 of code of practice)
-
Provision of surge protection devices (see 9.7 of code of practice)
-
Staggered start and/or load-shedding on change-over (see 9.8 & 9.9 of code of practice)
EESS Location
-
Location/room has ventilation arrangements suitable for EESS and ancillary equipment
-
Location selected is suitable for IP rating of EESS components
-
Fire prevention and detection measures implemented as necessary to meet EESS technology
-
Site safety signs displayed and durable as necessary to meet EESS technology
EESS Equipment
-
Equipment installed to manufacturer's requirements
-
Clearance from adjacent objects meets manufacturer's specs
-
Ventilation of equipment meets manufacturer's requirements and remains unobstructed
-
Clearance from any external heat sources acceptable (as relevant)
-
EESS equipment is suitably accessible for maintenance and operation
-
EESS labelling displayed and durable (e.g. 'dual supply' signs)
Circuit Test Requirements
Continuity of earthing and/or equipment bonding
-
Test to ensure the continuity of earthing and/or equipotential bonding conductors (if fitted)
-
Connection to main terminal verified
Insulation Resistance Test
-
Test to determine the insulation resistance between live conductors and between live conductors to protect protective conductor connected to the means of earthing
-
Test to be undertaken on all site installed circuits (AC & DC)
Polarity Test
-
Test to ensure that all circuits are correctly marked and connected
Earth Electrode Resistance
-
Note: some installations may have more than one earthing system each with earth electrodes (see fig 9.11, G.6 and G.7 of the code of practice. In these cases, the Earth electrode systems should be certified separately).
-
Test to determine the electrode resistance (s) to earth (where fitted)
RCD Test
-
Note: where the RCD is tested from the downstream line (s) to their associated protective conductor, the test should be carried out in connected mode and island mode to ensure that the Earth fault return path is operational in both modes
-
Test to ensure proper function of any RCDs
Functional Tests
-
(a) Tests to ensure switchgear and other circuit devices operate correctly
-
(b) Tests to ensure correct functioning of island mode isolator is switching between all supported modes
-
You may proceed to the next page
Sign Off
Assessment Sign off
-
Signature and Full Name of Competent Person