Information
-
Engineers on site
-
Visit date and time
-
Job number
-
Customers Address
-
Patch
-
Customer ok for pictures to be taken in property to conduct this audit customer print and sign
Arrival
-
Is van locked, parked and left in safe position
-
Are any tools or equipment left out side front of property
-
Relevant safety signs visible up on approach to property or just inside
-
Photos
Customer safety and protection of property
-
Are there any potential trip hazards around that could be avoided.
-
Has the customer been advised of work zones and potential hazards
-
Is the customers property adequately protected
-
Are safety door barrier in use if floor cover and/or floors lifted
-
Has safe electrical isolation been followed
-
Have all electric cables that have been disconnected have a junction box on the end
-
Photos
Gas Engineer
-
Is work area as clean and tidy as possible <br>ie tools not scattered around, excess of rubbish,
-
Is PPE bag in property and in use
-
Any comments on PPE
-
Photos
Electrician
-
Electrician
-
Has Electrician been on site.
-
Have all electrics been disconnected that have to be
-
Have fuses been left out and safety signs been refitted to fuse spur to boiler/appliance.
-
Are there any IP breaches
-
Has Electrician left paperwork on site
Gas Safety
-
Dose engineer have all items available to them that can be ordered from the NDC at there disposal, and spares where necessary
-
Has the Engineer carried out a full visual inspection of the existing gas installation prior to commencing work.
-
Minimum required kit list. Tool caddy T00208 15mm fittings brush T01631 22mm fittings brush T01647 28mm fittings brush T01652 Mirror T03749 Leak detector bottle C00123 Temporary bonds x2 T00198 Leak detected fluid x 2 C00136 Abrasive pad C00011 Mesh strips C31778 Meter labels D00545 On/Off tape C00045 Meter washers F37024 Meter caps and discs F01377 and F05586 Flux (small with built in brush) C03164 Heat mat T01081 Cool Gel C35018 Non setting putty C02642 PTFE (yellow) C02820 U gauge T00381 U gauge hose C02616 Items to be ordered by engineer :-
-
Has the gas meter been fully checked that it complies with TOPS, and any necessary faults deat with or rectified
-
Has the initial tightness test been carried out and recorded in Sales Force or I Depot and faults recorded
-
Has the gas works caried out on this instillation in accordance with TOPS procedures and to a quality standard.
-
How would you categorise gas installation
-
How has the engineer categorise gas installation
-
Photo's of job
Engineer Compliance
-
Sales force / IDepot documents been completed at all points necessary
-
Have job documents been completed correctly
-
Is the new system been fitted to MI's
Completion
-
Manager / Lead engineer sign off