Title Page

  • Client Details

  • Conducted on

  • Prepared by

  • Location
  • Heat pump Model

  • Heat pump Serial number

  • FTC Model/serial number

  • Cylinder Model/Serial Number

Inspection/Commissioning Checklist

  • PRE NOTES

  • Time & Temperature Control Central Heating

  • Time & Temperature Control To Hot Water

  • Combined with heat pump main controls

  • Cylinder Thermostat & Programme Timer installed

  • Heating Zone Valves

  • Hot Water Zone Valves or 3 way valve

  • Bypass Valve Required

  • Thermostatic Radiator Valves Installed

  • Heat Pump Safety Interlock provided

  • Flow Return & Cylinder temperature sensors correctly positioned?

  • Weather Compensation Settings if applicable

  • Third Party Controls installed

  • Are the third party controls correctly interlocked?

Central Heating system check list

  • Has the heating system has been filled and pressure tested.

  • Expansion vessel for heating system is sized, fitted & charged in accordance with manufacturers instructions

  • The system has been flushed and cleaned in accordance with BS7598 and heat pump manufacturerS instructions

  • What system cleaner was used?

  • Outdoor fuse rating

  • Cylinder coil surface area or Plate heat exchanger

  • What antifreeze was used

  • What is the concentration level?

  • Legionella protection

  • Circulating pump(s) speed settings?

  • Flow Temperature when commissioning system

  • Measured steady state delta T (Flow and Return)

  • Return Temperature when commissioning system

OUTDOOR UNIT

  • The heat pump is fitted on a solid/stable surface capable of taking its weight

  • Is all external pipework insulated?

  • Is the fan free from obstacles and operational? Adequate airlow?

  • Has suitable consideration been made for condensate discharge?

  • Flow and return isolation valves fitted?

  • AntiVibration mounting pads fitted?

Hot Water Cylinder/Thermal Store

  • Is the heat pump connected to a hot water cylinder?

  • Cylinder heat up time

  • Domestic hot water target temperature

  • Hot water has been checked at all outlets

  • Have Thermostatic blending valves been fitted?

  • Electric Heater installed

  • Oil Boiler back up installed

  • Gas Boiler

  • Solar Thermal

  • Remove & clean line strainer if present

  • The operation of the heat pump and system controls have been demonstrated to the end-user

  • This Commissioning Checklist is to be completed in full by the AE' who commissioned the Ecodan and associated equipment as a means of demonstrating compliance with the approprate Building Regulations and then handed to the customer to keep for future reference. For further information, please refer to Mitsubishi Electric training literature and installation manual. Failure to install and commission this equipment to the manufacturer's instructions may invalidate the warranty but does not affect statutory rights

  • Commissioning Checklist Complete

Tick the appropriate boxes if applicable

Hot Water System-G3

  • What is the incoming static cold water pressure at the inlet to the system?

  • Where is the pressure reducing valve situated (if fitted)?

  • What is the pressure reducing valve setting?

  • Has the strainer been cleaned

  • Is the installation in a hard water area (above 200ppm)

  • If Yes, has a water scale reducer or scale trap been fitted?

  • What type of scale reducer has been fitted?

  • What is the hot water thermostat set temperature?

  • What is the hot water temperature at the nearest outlet?

  • What is the maximum hot water flow rate at set thermostat temperature (measured at highest flow outlet)?

  • Time and temperature controls have been fitted in compliance with Part L of the Building Regulations?

  • Type of control system (if applicable)

  • Is the cylinder solar (or other renewable) compatible?

  • Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?

  • The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations

  • Are all energy sources fitted with a cut out device?

  • Has the expansion vessel or internal air space been checked?

  • The manufacturer's literature, including Benchmark Checklist and Service Record, has been explained and left with the customer

  • All installations in England and Wales must be notified to Local Authority Building Control (I-ABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will the be issued to the customer

  • This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturers instructions may invalidate the warranty but does not affect statutory rights

Photos

  • Site/property photos

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.