Information

URS information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Project Overview & Location

Project overview

  • Project Name

  • Federal Agency providing funds, license, or permit

  • Applicant

  • Contact Person

  • Applicant & Contact Person phone numbers

  • Address for Response

Location of Project

  • County

  • Street address

  • Location Description (if no street address)

  • ZIP Code

  • City

  • GPS Coordinates and/or Address

Legal Description of Project Area

  • USGS Topographic Map Quadrangle Name & Year

  • Township | Range | Section

Project Description

Project Description in detail.

  • Project details. Indicate excavation size, whether building demolition is involved, details of proposed rehabilitation, etc.

Archaeology ( Earthmoving activities)

  • Describe any ground disturbances, attach photos.

  • Ground disturbance photo

  • Ground disturbance photo

  • Ground disturbance photo

  • Will the project require fill material?

  • If Yes, indicate proposed borrow areas (source of fill material) on topographic map.

  • Borrow site coordinates
  • Are you aware of archaeological sites on or adjacent to project area?

  • If Yes, identify them on the topographic map..

  • Archaeology site coordinates
  • Archaeology site coordinates

Affected Structures (Rehabilitation, demolition, additions to, or construction near existing structures)

  • To the best of your knowledge, is the structure(s) located in any of the following:

  • An area previously surveyed for historic properties?

  • If Yes, provide the name of the survey or District.

  • A National Historic District?

  • If Yes, provide the name of the District.

  • A Local Historic District?

  • If Yes, provide the name of the District.

  • Use Mo DNR Section 106 Structures Form to supply the following:
    - Photographs of all structures ( see photography requirements)
    - Map and key indicating location of each photo; photos must be labeled to correspond with map key
    - Brief history of the building(s), including construction dates and building uses.

Additional Requirements & Checklist

Additional Requirements

  • MAP REQUIREMENTS:
    - Attach a copy of the relevant portion of the current USGS 7.5 minute topo quad (on 8.5 x 11 sheet)
    - Attach a large scale project map (if necessary).

  • PHOTOGRAPHY REQUIREMENTS:
    - Clear black & white or color photographs are acceptable.
    - minimum size of 3" x 5"
    - Photos of neighboring or nearby buildings are helpful.
    - Polaroids, photocopies, photos sent by email or fax are not acceptable.
    - Photos must be labeled and keyed to one map of the area.
    Good quality photographs are important for expeditious project review.

Checklist

  • Did you provide the following information?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.