Title Page

  • Site conducted

  • Project Name

  • Scaffold Location / Number

  • Conducted on

  • Prepared by

  • Location

Report

Mobile Scaffold Tower

  • Are the manufacturers erection guidelines displayed on the scaffold?

  • Guardrails in place 1m above all decks (including intermediate decks)

  • Mid-rails in place on all decks (including intermediate decks)

  • Toe-boards in place on all working decks

  • Platforms in place at correct height for work to be undertaken

  • Hinged cover in place for walk through platforms

  • Horizontal braces as per manufacturers guidelines

  • Diagonal braces as per manufacturers guidelines

  • Plan brace in place

  • Castor wheel locks all operational

  • Adjustable legs operational and at correct height for location

  • Access ladder secured in place to top rung of scaffold

  • Outriggers in place (if required) and foot seated on ground

Work Location

  • Is the fall risk over 4 metres?

  • Over 4m fall risk scaffold: Erected and checked by licensed scaffolder?

  • Is the work to be carried out covered by SWMS and signed by scaffold users?

  • Pre commencement JSA carried out?

  • Are you free of other risks that need to be controlled (ground slope, wind loading, electrical hazards etc)?

4 Metre fall risk

  • Screenshot 2024-03-25 141525.jpg
  • Are the people using the mobile scaffold trained in the safe erection use and dismantling of the scaffold?

Completion

  • Comments and Actions:

  • Inspection by (Print Name) | Position | Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.