Title Page
-
Site conducted
-
Project Name
-
Scaffold Location / Number
-
Conducted on
-
Prepared by
-
Location
Report
Mobile Scaffold Tower
-
Are the manufacturers erection guidelines displayed on the scaffold?
-
Guardrails in place 1m above all decks (including intermediate decks)
-
Mid-rails in place on all decks (including intermediate decks)
-
Toe-boards in place on all working decks
-
Platforms in place at correct height for work to be undertaken
-
Hinged cover in place for walk through platforms
-
Horizontal braces as per manufacturers guidelines
-
Diagonal braces as per manufacturers guidelines
-
Plan brace in place
-
Castor wheel locks all operational
-
Adjustable legs operational and at correct height for location
-
Access ladder secured in place to top rung of scaffold
-
Outriggers in place (if required) and foot seated on ground
Work Location
-
Is the fall risk over 4 metres?
-
Over 4m fall risk scaffold: Erected and checked by licensed scaffolder?
-
Is the work to be carried out covered by SWMS and signed by scaffold users?
-
Pre commencement JSA carried out?
-
Are you free of other risks that need to be controlled (ground slope, wind loading, electrical hazards etc)?
4 Metre fall risk
-
Are the people using the mobile scaffold trained in the safe erection use and dismantling of the scaffold?
Completion
-
Comments and Actions:
-
Inspection by (Print Name) | Position | Signature