Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

CAR PARK

  • POTHOLES<br>- pedestrian walkways

  • PEDESTRIAN - painted and well lit

  • PAVEMENT/PAVING - no trip hazards

  • BUS BAYS - painted and well lit

  • CAR STOPS - in correct position

  • TRAFFIC SIGNALS - operating

  • LIGHTING LEVELS - not more than 1% failure

EXTERNAL

  • EXTERNAL SIGNAGE - not visually loose or damaged

  • LIGHT POLES - not rust in footings and secure

  • PALLET/RUBBISH - remove rubbish and refuse against walls

MALL

  • EXPANSION JOINTS - secure

  • CRACKED TILES - no trip hazards

  • SLIP TESTS - up to date testing recorded

  • CORRIDORS CLEAR - no obstructions

PLUMBING

  • NON RETURN VALVES - are they maintained

  • SEWER EJECTOR - fully operational

  • GREASE TRAP - labelled

GAS

  • ANNUAL SURVEY - site audit to check system

  • SHUT OFF VALVES - clearly identified

  • SIGNAGE - displayed denoting SOV

  • AUTO SHUT DOWN - ensure procedures in place for reset

  • ACCESS - clear access to valves

FIRE SYSTEMS

  • HOSE REELS - tagged and maintained

  • SPRINKLER & PUMP ROOMS - clear of rubbish and fuel on site for pumps

  • SPRINKLERS - all isolation valves locked

  • HYDRANTS - no leaks

  • PORTABLE FIRE EQUIPMENT - tagged and maintained

  • FIRE SHUTTERS/DOORS - test key operation

  • FIRE PLANT SHUTDOWN - review fire test reports

  • WATER SUPPLY - isolation valves open

  • FIP ISOLATIONS/ALARMS/FAULTS - no alarms, faults or isolations are present

DANGEROUS GOODS

  • ASBESTOS: visual. Non friable leave. Friable utilize procedures

  • SYNTHETIC FIBRE: sealed, none visible. If visible seal.

  • LEAD PAINT: all to be removed

ELECTRICAL

  • COMMUNICATION - PA & 2way systems

  • GENERAL LiGHTING LEVELS - not more then 1% failure

  • SWITCHBOARDS - clear of rubbish, isolations are correctly tagged etc

  • LIFTS - emergency lighting & call system operating

  • ESCALATORS - no sharp objects, combs

  • POWER OUTLETS - visual check of GPOs for signs of damage (ESP. CML mall)

COOLING TOWERS

  • CW TOWER - Review testing documents

  • COOLING TOWER DOSING EQUIPMENT - check equipment is operational

EQUIPMENT

  • SCISSOR LIFTS - Maintenance levels

  • PPE FOR STAFF - hearing, breathing, gloves, mask

  • COMPACTORS - check all safety switches are operational, signage, oil recycling, lighting, leakage to stormwater

  • GAS / FUEL STORAGE - correctly stored, SDS available

BABY CHANGE ROOM

  • Check tempered water mixing valves, microwave instructions, RCD protection on all exposed power outlets

SECURITY

  • STANDING ORDERS - up to date procedures and contact lists

  • CCTV - fully operational

  • ELECTRONIC SYSTEM - Fully operationsl

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.