Title Page
-
Conducted on
-
Prepared by
-
Location
-
Has there been any deviation from the development scheme or tipping rules?
-
Any changes in general appearance or shape since the last inspection?
Haul Roads
-
Is there inadequate stand-off to the site boundary, face or water body?
-
Are there any potholes, deterioration of surface or obstructions?
-
Are cracks or washouts present, is any water entering them?
-
Is there a full safety bund along side edges and water body? (except in restored areas where this is not applicable)
-
Are any haul roads of insufficient width?
-
Are there any obstructions to drainage blankets, drains or culverts?
Edge Protection
-
Are there any edges without adequate 1.5m edge protection?
-
Are there any bunds lower than the 2m Tarmac Standard height?
-
Details of recommended remedial works / actions:
-
At dredger working area is there enough material behind the safety bund to last until next inspection?
-
Details of recommended remedial works / actions:
-
At the dredger working area where access is not restricted, is there a 5m stand-off?
-
Details of recommended remedial works / actions:
-
If soil movements are/have been carried out is the temporary edge protection adequate?
-
Have you missed any new working areas that need edge protection?
General
-
Did you note any other points of interest or concern (if yes please give details)?
-
List of Interests or Concerns
-
Any defects requiring Geotechnical Department / Specialist Notification?
-
Details of recommended remedial works / actions
Completion
-
Sign Off