Title Page

  • Conducted on

  • Prepared by

  • Location

Lagoon Locations: T16 Active BWD Silt, T25 Active Plant Silt, T1 Dormant Silt

  • Has there been any deviation from the development scheme or tipping rules?

  • Any changes in general appearance or shape since the last inspection?

  • Is there any evidence of movement at the top of the lagoon walls since the last inspection?

  • Is there any evidence of bulging on the wall side slopes?

  • If cracks are present is any water entering them?

  • Can any movement of the foundation adjacent to the toe of the lagoon wall be seen?

  • Is water seeping through the lagoon wall?

  • Is there any major wave erosion on the inner slopes?

  • Is there evidence of surface water discharge and scouring of the slopes?

  • Has the water level risen above the minimum 1 metre freeboard?

  • Is there any ponding of water on the top surfaces of the lagoon walls?

  • Is there any uneven build up of silt?

  • Have any of the pipes or overflows become obstructed?

  • Have any of the lifebelts, signs or fences been damaged or been removed?

  • Any changes in general appearance or shape since the last inspection?

General

  • Did you note any other points of interest or concern (if yes please give details)?

  • List of Interests or Concerns

  • Any defects requiring Geotechnical Department / Specialist Notification?

  • Details of recommended remedial works / actions

Completion

  • Sign Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.