Information
-
Client / Site / Customer
-
Conducted on
-
Prepared / Completed by:
-
Personnel on-site:
Water Blast Checklist
-
Is the water blasting area properly barricaded and posted with caution / warning signs?
-
Is the work area a confined space?
-
Has a MPW Confined Space Permit been completed?
-
Has all moving equipment and other sources of hazardous energy been locked out LO/TO? (electrical, pneumatic, chemical, steam)
-
What Safety Guards are required for this job? (check all that apply)
-
Lance Stopper (hand guard)
-
Anti-Withdraw Device
-
Starter Rod 18 inches long (stinger)
-
Double-dump shotgun
-
Other
-
Hands Free
-
Have all fittings, guns,lances, nozzles, dump valves and other equipment been inspected prior to use?
-
Do high pressure hoses meet inspection criteria?
-
Are hoses color coded?<br>Jan - Mar = YELLOW<br>Apr - Jun = ORANGE<br>Jul - Sep = BLUE<br>Oct - Dec = GREEN
-
What Personal Protective Equipment (PPE) will be used for the water blasting work? (check all that apply)
-
Hard Hat
-
Safety Glasses with side shields
-
Goggles
-
Face Shield
-
Hearing Protection
-
Rubber Gloves
-
Rain / Blast Suit (yellow)
-
Acid / Chemical Suit (green)
-
Full Body Coveralls
-
Full Metatarsal Blast Boots
-
Chemical Overboots
-
Respirator
-
Other (specify)
-
Have Emergency Showers and Eyewash Stations been identified and checked for operability?
-
Are water blast "Medical Alert" cards available on site?
-
Have on-site first aid, ambulance and off-site emergency medical facilities been identified?
-
Have emergency procedures, exits, evacuation routes and assembly points been identified?
-
Have emergency notification procedures been established / documented?
-
Have the crew members been informed of the emergency procedures?
-
Are equipment guards in place? (trigger guards, rotational guards)
-
Is there as hose safety shroud on each gun?
-
Are whip-checks in place and properly positioned? (hose - hose, hose -pump, hose - foot pedal)
-
Are all water blast operators properly trained? (MPW or other acceptable source)
-
Is lighting in the work and support areas adequate?
-
Are GFCI's in place and tested?
-
Are footing conditions firm?
-
Is the lance operator in control of the foot pedal?
-
Are proper sized rupture discs in place?
-
Are stainless steel fittings, NOT black iron fittings used in locations where failure could impact personnel?
-
Have the MSDS's or SDS's for hazardous materials in the work area been reviewed with the crew?
-
Has a Job safety Analysis (JSA) or Work Task Safety Requirement (WTSR) been prepared for this work?
-
Has the JSA or WTSR been reviewed with the crew?
-
Have the contents of this checklist been reviewed with the crew?
-
If critical safety requirements CANNOT be met has a variance been documented and approved? (which defines an alternate procedure that provides an equivalent level of safety)
-
Other Comments
-
Date: Time:
-
Supervisor's Signature: