  • Site conducted

  • This document will be used to close down site(s) whereas leaving safe and secure.

    E.on Schemes.JPG
  • Site Operators

  • Location
  • Conducted on

  • Closedown performed by?

Selection of Close down required to complete

  • Would you like to close down an External Wall Insulation (EWI) job?

Access Solutions and Security

  • Is access denied with no risk caused to passers-by or to adjoining occupied properties, this includes trap-doors and gates being closed, Warning Signs in place?

  • Provide photo of the scaffold

  • Ladders removed or secured to prevent climbing?

  • SECURE or REMOVE LADDER BEFORE LEAVING

  • Take Photo of access denied

  • Take photo of locked / removed ladder

  • Is the Construction area secured with HERAS anti climb fencing, permanent fencing or Chapter8 barriers - Double clipped?

Site Presentation

  • Has the site been left in a presentable, clean, tidy and safe condition?

  • Photo of issues found

  • Have all access footpaths and roads been cleaned thoroughly?

  • Photos of issues found

Hot works and Lone Working

  • Are all team members accounted for? Nobody left on the construction area and ensure all works have ceased on departure?

  • Team Members must be located or Contacted to ensure their safety before leaving site

  • Have all hot works ceased at least 1 hour prior to leaving site?

  • Observations must stay in place to ensure fire does not start from Hot works

Compound, Waste and Security

  • Has all waste been removed from site and correctly disposed of?

  • Please Ensure waste is fully segregated and secured, confirm with Photo.

  • Have all Skips been taken away, locked or Net Installed and surrounding area is clean and free from over spill or debris?

  • Ensure issues are remedied before leaving

  • Evidential Photo

  • Are all storage areas secured with materials stored internally where possible?

  • Secure area before leaving

  • Evidential Photo

  • Is the compound fully secured and Lit where necessary with all services switched off?

  • Steps must be taken to switch off and secure the compound before leaving

Plant and Machinery

  • Is all Plant and machinery secured and immobilised?

  • Ensure the plant is secured and Immobilised before leaving

  • Are all fuel storage locations or tanks secured

  • Ensure fuel storage is secured before leaving

Selection of Close down required to complete

  • Would you Like to close down a First Time Central Heating (FTCH) Job?

Internal Checks

Site Presentation & Safety

  • Have any tools been left on site?

  • Photo to be taken

  • Ensure the tools are removed and area cleared

  • Have floor boards been reinstated and carpets rolled back?

  • Photo to be taken

  • Action needs to be taken to get floorboards reinstated and carpets back down

  • Have all dust sheets been removed or rolled up preventing trip hazards

  • Take a photo of the area affected

  • Action needs to be taken to remove or roll up dust sheets to prevent trip hazard!

  • Has the working areas been cleared and tidied to the customers standards?

  • Take a photo of the area affected

  • Action must be taken to get the area cleared and tidied to the customers standard!

  • Are all walkways clear of tools/Materials/debris and excess furniture

  • Take a photo of the area affected

  • Action must be taken to clear the walkway

Supplies

  • Has water supply been re-established and customer has running water with Flushing toilet?

  • Action must be taken to have the water connection re-established

  • Is the customer aware they may be without Direct Hot Water (DHW)

  • Explanations must be given to the customer

  • Are all electrical connections made safe and Flex's removed?

  • Photo to be taken

  • Connections must be made safe and Flex removed

  • Has Electrical supply been re-established and Power-On?

  • Action required to re-establish connection and powered on!

  • Has the Loft light been switched off and Loft ladder been retracted (whereas applicable) ?

  • Action required to Switch off the Light and retract the ladder where applicable!

External Checks

  • Have waste Materials been segregated and stored in one place ready for removal?

  • Photo to be taken

  • Materials must be removed and/or segregated and stored securely

  • Have materials not yet used, been stored securely, preventing theft?

  • Photo to be taken

  • Action required to store materials in a safe secure location or remove from site!

  • Have all walkways and public access and egress been cleared of obstructions?

  • Photo to be taken

  • Action required to clear all access and egress of the property!

Summary and Sign off

  • Comments / Issues or actions

  • Person Completing the Closedown procedure

  • Sign

  • Does the Customer have any issues at Closedown?

  • Sign

  • Highlight any issues the customer may have

  • Customer to sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.