Title Page
-
Document No.
-
Audit Title: MRC Operations/Contract Manager's Inspection
-
Conducted on:
-
MRC Job Number:
-
Location
-
Prepared by
-
Personnel on site:
Administration
-
Is there evidence that the MRC Quality System is being followed and Snagging is up to date?
-
Is there evidence that the Site File is being updated as required?
-
Is there evidence of all necessary PAT Testing for electrical equipment?
-
Is there evidence of regular Tool Box Talks being delivered?
Operational
-
Is there evidence that all operatives have, and are wearing the necessary PPE?
-
Is there evidence that all operatives are aware of MRC Work Procedures?
-
Is there evidence that all items of Work Equipment are inspected regularly?
Health, Safety and Wellbeing
-
Is there evidence that all operatives have received a briefing on the RAMS? This includes for all variations and Day Work.
-
Is there evidence of Hand Checks being carried out?
-
Have any Hearing Problems been reported?
-
Have any General Health conditions been reported?
-
Is there evidence of reporting all adverse events?
Summary of actions resulting from the inspection:
-
Summary:
-
Signature of Inspector: