Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
“In the areas I was able to observe at the time of my inspection, the following safety items needed corrective action and/or were corrected during the inspection:”.
High risk activities?
-
Identified?
-
Mitigation plan established?
-
Plan conveyed to all affected employees?
Preliminary Supervisor Meeting
-
Have there been any accidents, near misses, or damage since our last visit?
-
If yes, how were they corrected?
-
Are you conducting site specific orientations with all new site workers?
-
Do you utilize a daily site visitor sign in sheet?
-
Do you have a safety checklist for visitors to your site?
General Safety and Health Provisions - Subpart C - 1926.20
-
Jobsite address posted in trailer and main entrance to site?
-
Jobsite signage (OSHA, Emergency Numbers, etc...)?
-
Jobsite properly fenced, signed, and secured?
-
OSHA 300 posted (February - April)?
-
Emergency action plan is on site?
-
Adequate dumpsters for trash and recyclables?
-
Housekeeping was in good condition. The jobsite was clean and safe?
-
Exits were clear and unobstructed?
-
Pre-task/Daily Safety Brief and/or Plans are being done regularly?
-
Subcontractors on site conducting weekly tool box talks?
-
Site safety inspections being conducted routinely by client.
-
Other?
Occupational Health and Environmental Controls - Subpart D - 1926.50
-
First aid kits available and stocked?
-
All work areas adequately illuminated?
-
Adequate supply of water and individual drinking containers provided?<br>
-
Adequate Toilets available for employees on site?<br># of employees|# of toilets<br>< 20.................| 1<br>> 20.................| 1 toilet seat and 1 urinal/40 workers<br>> 200...............| 1 toilet seat and 1 urinal/50 workers<br>
-
Hazard Communication Plan available on site?
-
Safety Data Sheets readily available on site?
-
Asbestos and lead assessment has been completed?
-
Abatement certificate is on hand and available for review?
-
Other?
Personal Protective Equipment - Subpart E - 1926.95
-
Standard PPE - Safety Boots worn by everyone where required? 1926.96
-
Standard PPE - Hardhats worn by everyone where required? 1926.100
-
Standard PPE - Safety Glasses worn by everyone where required? 1926.102
-
Standard PPE - Safety Vests worn by everyone where required?
-
PPE in good working condition? Compliant with appropriate ANSI Standard (Z89/Z87)?
-
Additional PPE is being utilized as necessary (Hearing Protection, gloves, welding hoods, cutting goggles, face shields)?
-
Respirators are being worn correctly, where required? All users have current Fit Test(s)?
-
Respirators are being stored properly?
-
Proper clothing being worn by all employees (shirts w/ sleeves, work boots, pants)?
-
Other?
Fire Safety - Subpart F - 1926.150
-
Fire Extinguishers on site (1 for every 3000 SF), 1 per floor in multistory locations?
-
Fire Extinguisher has up to date annual inspection completed?
-
Fire Extinguisher has up to date monthly inspection completed?
-
Metal gas cans properly labeled with flame arrestor? (Plastic cans are not allowed)
-
Smoking in authorized area's only?
-
Flammable liquids are being stored properly (Less than 25 gallons of flammable liquids stored outside of metal cabinet)?
-
Fire extinguisher located 25'-75' from fuel storage?
-
LPG is stored outside?
-
Other?
Material Handling & Storage - Subpart H - 1926.250
-
All materials are stacked so as to prevent sliding, falling, or collapse?
-
Bricks are not stacked higher than 7' and masonry block does not exceed 6'?
-
Nails,screws, and staples have all been removed from all stored lumber or bent over?
-
No employees are under suspended loads?
-
Tag lines being used?
-
All rigging equipment is being inspected daily? Tags/labels present and legible?
-
All rigging equipment being stored properly?
-
Materials staged a safe distance from leading edge?
-
Other?
Tools (Hand and Power) - Subpart I - 1926.300
-
All tools being inspected prior to use and are in good working condition?
-
Power tools are grounded or double insulated and cord is in good condition?
-
Tools are properly guarded per manufacturer's requirements?
-
Fuel powered tools are shut off prior to refueling?
-
Fuel powered equipment used indoors have adequate ventilation?
-
Powder actuated tools are being used by properly trained employees?
-
Powder actuated tools are attended at all times?
-
Lasers & powder actuated signs posted and users trained?
-
Do tools have a magnetic switch?
-
Other?
Cutting and Welding - Subpart J - 1926.350
-
Hot works permit complete?
-
Back flow preventers in place?
-
Valves closed and capped when not in use?
-
Gas cylinders stored properly? (20' apart, 1/2 hour fire wall, and secured)
-
Fire extinguisher present during hot works operation? Up to date inspection? Immediately available?
-
Properly trained fire watch being used where required?
-
Welding is being done on substances with known toxic properties?
-
Air quality has been evaluated as needed?
-
Adequate ventilation is being used?
-
Other?
Electrical - Subpart K - 1926.400
-
Assured grounding program in place, or GFCI's used and checked?
-
Permanent power is GFCI protected?
-
Cords, plugs in good condition? Protected from traffic and damage?
-
Temporary lighting - Properly set up, in good condition, protected from damage?
-
Task lighting properly set up?
-
Panels marked and/or labeled, secured, and weather resistant?
-
All live wiring properly guarded or protected from employee exposure?
-
Lock out/tag out being used where required?
-
Other?
Scaffold - Subpart L -1926.450
-
Employees properly trained on scaffolding?
-
Scaffolding being inspected each day by a Competent Person and documented?
-
Planking meets OSHA requirements and is in good condition?
-
Working level is fully planked?
-
Planking properly installed? (Overlap or cleats)
-
Guardrails and toe boards (as necessary) in place?
-
Tie-ins, pins, braces installed as required?
-
Footing (cribbing, mudsills, screw-jacks, and baseplates/wheels) properly installed?
-
Proper access provided?
-
Height exceeds a 4:1 ratio without proper restraint to prevent tipping, 2:1 if using wheels?
-
All wheels locked?
-
Proper tie backs on suspended scaffolding?
-
Are the appropriate amount of counterweights being used with suspended scaffolding?
-
Each employee is using independent anchor point for fall protection?
-
Aerial lifts are working within their limits?
-
Gates are closed or chains are in place on all aerial lifts?
-
Proper PPE being used on aerial/scissor lifts?
-
Employees in aerial lifts have their feet firmly on the ground?
-
Other?
Fall Protection - Subpart M - 1926.500
-
Employee properly trained in fall protection?
-
All floor and/or roof openings adequately protected or covered and marked accordingly?
-
Overhead protection provided where necessary?
-
Employees exposed to falls are properly trained in fall protection and rescue?
-
Perimeter cable installed and flagged every 6'?
-
Perimeter Posts are installed correctly?
-
Perimeter cable has proper connection (Never saddle a dead horse)?
-
Guardrails in place and able to withstand 200# of outward downward force?
-
Guardrails consist of a top rail, mid rail, and a toe board, installed at proper height?
-
Guardrails are smooth and there is no potential of snags, cuts, or punctures?
-
Horizontal lifeline is inspected by a competent person and designed by a qualified person?
-
All employees are using 100% fall protection above 6'?
-
Proper anchor points are being utilized? Overhead? Rated for 5000#?
-
Fall protection equipment is being inspected daily by the end user?
-
Other?
Hoists, elevators, and conveyors - Subpart N - 1926.550
-
Rated load capacity is posted?
-
Personnel hoist has doors in good working order and will not operate while open?
-
Emergency stop button is on the hoist and clearly marked "STOP"?
-
Weekly inspection and maintenance is being conducted?
-
Operator properly trained and certified to operate the hoist/elevator?
-
Overhead Protection?
-
Other?
Motor vehicles, Mechanized equipment - Subpart O - 1926.600
-
Daily Inspection is complete and on the equipment?
-
Operator's all have their certification cards on them (fork, aerial/scissor lifts)?
-
All equipment - Level/stable work pad, proper distance from excavations/trenches?
-
Is there a working fire extinguisher on all pieces of equipment, as required?
-
Equipment back-up alarms functional and audible?
-
All equipment is equipped with an audible warning device (Horn)?
-
Work zone protection - Traffic Control Plan (Proper Reflective Vest/Materials/Signs/Cones & Barricades)?
-
Reflective devices are clean and working?
-
Barriers set up to avoid blunt impacts?
-
Flaggers are trained and certified?
-
Equipment turned off and parking brake set while unattended.
-
All raise able implements lowered to the ground prior to operator leaving it unattended.
-
Equipment is equipped with seat belt(s) and operator is using?
Excavations - Subpart P - 1926.650
-
Daily excavations and trenching inspection completed by Competent Person prior to each shift and after any weather event?
-
Utilities located (current and documented)?
-
Trench box safety procedures in place (tabulated data available)?
-
Ramps/Ladders every 50' (25' either direction) when 4' or deeper?
-
Existing utilities shored/supported properly?
-
Trenches 20' or deeper have engineering and certificate?
-
Trenches/excavation deeper than 5', cave in protection provided (trench box, shoring, sloping, benching).
-
Open excavations, road drop offs, trenches, manholes, uneven surfaces - barricaded and have proper notification?
-
Spoil piles at least 2' away from edge of excavation?
-
Other?
Concrete and Masonry Construction - Subpart Q - 1926.700
-
Concrete is able to support all loads placed upon it?
-
Rebar protection (e.g. caps) used?
-
Post tension/pre stress cables are present?
-
Rebar stakes are not impalement hazard?
-
Shoring/bracing properly installed?
-
Batching stations have proper access?
Steel Erection - Subpart R 1926.750
-
Site Layout: Adequate access roads, firm properly graded, and barricaded?
-
Site specific erection plan on site?
-
Approval to begin steel erection has been obtained and is in writing?
-
Controlled access to erection work area in place?
-
Proper bracing/guying?
-
Adequate bridging in place?
-
Anchor rod/bolt repair has been approved in writing by engineer of record?
-
Loose decking has been secured from displacement?
-
All employees properly trained in Subpart R?
-
Concrete has achieved 75% cure strength prior to setting posts or columns?
-
Other?
Underground Construction - Subpart S 1926.800
Demolition - Subpart T 1926.850
-
Prior to start, engineering survey (demolition plan) conducted by a competent person?
-
All utilities, controlled or disconnected?
-
Material not dropped greater than 20' without an enclosed chute?
-
Employees and the general public, are protected from falling objects and other hazards?
-
Are dust control methods in place?
-
Truck routes have been established and marked?
-
Other?
Stairways - Ladders - Subpart X - 1926.1050
-
Stairrails on stairs and exposed edges?
-
Stairwells clear and unobstructed?
-
Stairs with >4 risers or >30" high, equipped with stairrails?
-
All elevation changes of 19" or more have a ladder, ramp, or stair?
-
Ladders extend 3' above landing?
-
Ladders secured from movement?
-
Ropes or other means provided for material/tool retrieval?
-
Ladders are being inspected prior to each use?
-
Ladders properly set up?
-
All required labels/tags are on the ladders?
-
Other?
Toxic and Hazardous Substances - Subpart Z
-
Employees have the proper level of asbestos training?
-
Employees have the proper level of lead training?
-
Have necessary medical evaluations been completed for all exposed employees?
-
Employees have the proper level of silica awareness training?
-
Air monitoring conducted when necessary?
-
Is the silica policy up to date?
-
Do subs on site have updated silica policy?
-
Are exposure control plans reviewed and current?
-
Has air monitoring data been collected if not using Table 1?
-
Are tools in good condition and connected to a HEPA filter when working on silica containing products?
-
Other?
Confined Space - Subpart AA
-
Confined spaces - Identified, evaluated, and classified (permitted/non-permitted)?
-
Are all required warning signs posted?
-
Communication between host, controlling, and exposing employers has been conducted?
-
Has a permit required confined space policy been established?
-
Employees properly trained (entry, attendant, rescue)?
-
Air monitoring conducted, documented, and results available for review?
-
Has an early warning system been established?
-
Have welding requirements been reviewed and established? 1926.353(b)
-
Emergency services and rescue are in place?
-
Are all required LOTO steps being followed?
-
Has public protection been established and in place?
-
Other?
Cranes & Derricks - Subpart CC - 1926.1400
-
Controlling entity has provided all known ground condition information (utilities, site drawings, and soil analysis if available)?
-
All underground hazards have been identified (voids, tanks, utilities) and operator has been informed?
-
Operator properly trained and certified (NCCCO, NCCER, Union)?
-
DOT Physical up to date?
-
Required post assembly inspection has been completed?
-
Cranes flagged, swing radius protected?
-
Outriggers are fully extended?
-
Outriggers are on adequate pads?
-
Crane annual certification/inspection up to date on the crane?
-
Daily inspection are completed each shift?
-
All rigging operations conducted by a qualified rigger?
-
Crane and hoisting operations are sufficient distance from energized power lines (20' or more)?
-
The operator remains in the cab while load is suspended?
-
Proper distance maintained from all power lines?
-
All signaling operations conducted by qualified signalman (Hand signals, voice, audible, new)?
-
Hand signal charts are on the equipment or conspicuously posted in the vicinity of the hoisting operations?
-
Hooks have appropriate latches and are in good working order?
-
Is there a lift plan in place?
-
Wind meter is in use?
-
Other?
Miscellaneous Items
-
Positive Items noted?
-
Training or other recommendations for this client?
-
Site Contact: Name and Signature