High risk activities?
-
Identified?
-
Mitigation plan established?
-
Plan conveyed to all affected employees?
General Safety and Health Provisions - Subpart C - 1926.20
-
Jobsite address posted in trailer and main entrance to site?
-
Jobsite signage (OSHA, Emergency Numbers, etc...)?
-
Jobsite properly fenced, signed, and secured?
-
OSHA 300 posted (February - April)?
-
Emergency action plan is on site?
-
Adequate dumpsters for trash and recyclables?
-
Housekeeping was in good condition. The jobsite was clean and safe?
-
Exits were clear and unobstructed?
-
Pre-task/Daily Safety Brief and/or Plans are being done regularly?
-
Subcontractors on site conducting weekly tool box talks?
-
Site safety inspections being conducted routinely by client.
-
Other?
Occupational Health and Environmental Controls - Subpart D - 1926.50
-
First aid kits available and stocked?
-
Adequate supply of water and drinking containers?<br>
-
Adequate Toilets available for employees on site?<br># of employees|# of toilets<br>< 20.................| 1<br>> 20.................| 1 toilet seat and 1 urinal/40 workers<br>> 200...............| 1 toilet seat and 1 urinal/50 workers<br>
-
Hazard Communication Plan available on site?
-
Safety Data Sheets readily available on site?
-
Asbestos and lead assessment has been completed?
-
Other?
Personal Protective Equipment - Subpart E - 1926.95
-
Standard PPE - Safety Boots worn by everyone where required? 1926.96
-
Standard PPE - Hardhats worn by everyone where required? 1926.100
-
Standard PPE - Safety Glasses worn by everyone where required? 1926.102
-
Standard PPE - Safety Vests worn by everyone where required?
-
PPE in good working condition? Compliant with appropriate ANSI Standard (Z89/Z87)?
-
Additional PPE is being utilized as necessary (Hearing Protection, gloves, welding hoods, cutting goggles, face shields)?
-
Respirators are being worn correctly, where required? All users have current Fit Test(s)?
-
Respirators are being stored properly?
-
Proper clothing being worn by all employees (shirts w/ sleeves, work books, pants)?
-
Other?
Fire Safety - Subpart F - 1926.150
-
Fire Extinguishers on site (1 for every 3000 SF), 1 per floor in multistory locations?
-
Fire Extinguisher has up to date annual inspection completed?
-
Fire Extinguisher has up to date monthly inspection completed?
-
Metal gas cans with flame arrestor? (Plastic cans are not allowed)
-
Smoking in authorized area's only?
-
Flammable liquids are being stored properly (Less than 25 gallons of flammable liquids stored outside of metal cabinet)?
-
Fire extinguisher located 25'-75' from fuel storage?
-
LPG is stored outside?
-
Other?
Material Handling & Storage - Subpart H - 1926.250
-
All materials are stacked so as to prevent sliding, falling, or collapse?
-
Nails have been removed from all stored lumber?
-
No employees are under suspended loads?
-
Tag lines being used?
-
All rigging equipment is being inspected daily? Tags/labels present and legible?
-
Materials staged a safe distance from leading edge?
-
Other?
Tools (Hand and Power) - Subpart I - 1926.300
-
All tools being inspected prior to use and are in good working condition?
-
Power tools are grounded or double insulated and cord is in good condition?
-
Tools are properly guarded per manufacturer's requirements?
-
Fuel powered tools are shut off prior to refueling?
-
Fuel powered tools used indoors have proper ventilation?
-
Other?
Electrical - Subpart K - 1926.400
-
Assured grounding program in place, or GFCI's used and checked?
-
Permanent power is GFCI protected?
-
Cords, plugs in good condition? Protected from traffic and damage?
-
All live wiring properly guarded or protected from employee exposure?
-
Lock out/tag out being used where required?
-
Other?
Scaffold - Subpart L -1926.450
-
Aerial lifts are working within their limits?
-
Gates are closed or chains are in place on all aerial lifts?
-
Proper PPE being used on aerial/scissor lifts?
-
Employees in aerial lifts have their feel firmly on the ground?
-
Other?
Fall Protection - Subpart M - 1926.500
-
Employee properly trained in fall protection?
-
All floor and/or roof openings protected or covered and marked accordingly?
-
Overhead protection provided where necessary?
-
Employees exposed to falls are properly trained in fall protection and rescue?
-
Perimeter cable installed and flagged every 6'?
-
Perimeter Posts are installed correctly?
-
Perimeter cable has proper connection (Never saddle a dead horse)?
-
Guardrails in place and able to withstand 200# of outward downward force?
-
Guardrails consist of a top rail, mid rail, and a toe board, installed at proper height?
-
Guardrails are smooth and there is no potential of snags, cuts, or punctures?
-
Horizontal lifeline is inspected by a competent person and designed by a qualified person?
-
All employees are using 100% fall protection above 6'?
-
Proper anchor points are being utilized? Overhead? Rated for 5000#?
-
Fall protection equipment is being inspected daily by the end user?
-
Other?
Motor vehicles, Mechanized equipment - Subpart O - 1926.600
-
Daily Inspection is complete and on the equipment?
-
Operator's all have their certification cards on them (fork, aerial/scissor lifts)?
-
All equipment - Level/stable work pad, proper distance from excavations/trenches?
-
Is there a working fire extinguisher on all pieces of equipment, as required?
-
Equipment back-up alarms functional and audible?
-
All equipment is equipped with an audible warning device (Horn)?
-
Work zone protection - Traffic Control Plan (Proper Reflective Vest/Materials/Signs/Cones & Barricades)?
-
Equipment turned off and parking brake set while unattended.
-
All raise able implements lowered to the ground prior to operator leaving it unattended.
-
Equipment is equipped with seat belt(s) and operator is using?
Stairways - Ladders - Subpart X - 1926.1050
-
Ladders extend 3' above landing?
-
Ladders secured from movement?
-
Ropes or other means provided for material/tool retrieval?
-
Ladders are being inspected prior to each use?
-
Ladders properly set up?
-
All required labels/tags are on the ladders?
-
Other?
Miscellaneous Items
-
Positive Items noted?
-
Training or other recommendations for this client?
-
Site Contact: Name and Signature