Title Page

  • Site conducted Balgrayhill/Viewpoint

  • Conducted on

  • Prepared by Gavin Gavin Friels

  • Location

Re Instatement Works

  • Bath Installation Complete Disconnect/Reconnect

  • WHB Installation Complete Disconnect/Reconnect

  • WC Installation Complete Disconnect/Reconnect

  • Bath/WHB/WC connection to new SVP Hot/Cold Water Operational

  • Medical Adaption

  • 2m2 Boxing In Moisture Gyproc Finish with Wetwall

  • Remove and Refit Medically Adapted Shower Doors and/or Pump as per CVi

Wetwall/Wetboards

  • Wetwall complete and sealed to customer’s satisfaction inc boxing in

  • New Stud Partition

  • Mixer Taps / Air Vents / Internal Joints

Additional Works

  • New Shower Rail and Curtain

  • New Bath Panel

  • New Toilet Seat

  • Supply and Fit Doughnut Washer Kit

Other Trade Works

  • Cut back Floor 1m2 (Viewpoint Only)

  • Renew Flooring 4m2 as per CVi

Decoration

  • Finished Decor to Customers Satisfaction

Snags / Other Works Instructed at Sign Off

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.