Title Page
-
Site conducted Balgrayhill/Viewpoint
-
Conducted on
-
Prepared by Gavin Gavin Friels
-
Location
Re Instatement Works
-
Bath Installation Complete Disconnect/Reconnect
-
WHB Installation Complete Disconnect/Reconnect
-
WC Installation Complete Disconnect/Reconnect
-
Bath/WHB/WC connection to new SVP Hot/Cold Water Operational
-
Medical Adaption
-
2m2 Boxing In Moisture Gyproc Finish with Wetwall
-
Remove and Refit Medically Adapted Shower Doors and/or Pump as per CVi
Wetwall/Wetboards
-
Wetwall complete and sealed to customer’s satisfaction inc boxing in
-
New Stud Partition
-
Mixer Taps / Air Vents / Internal Joints
Additional Works
-
New Shower Rail and Curtain
-
New Bath Panel
-
New Toilet Seat
-
Supply and Fit Doughnut Washer Kit
Other Trade Works
-
Cut back Floor 1m2 (Viewpoint Only)
-
Renew Flooring 4m2 as per CVi
Decoration
-
Finished Decor to Customers Satisfaction
Snags / Other Works Instructed at Sign Off
-