Title Page
-
Conducted on
-
Prepared by
-
Location
-
-
Table 1
-
(1) ELECTRIC METER SET
-
(2) GAS METER SET
-
(3) WATER METER SET
-
(4) Community standards are installed
-
(5) Final cleaning complete (anything more than minor touch up cleaning =0 )
-
(6) Smoke Detectors are operable
-
(7) Extra flooring stacked neatly in the attic
-
(8) No noticeable temperature variations between rooms
-
(9) Stash center painted, damage free, door adjusted and closes flush
Exterior
-
(1) FRONT ELEVATION IS CORRECT
-
(2) Mailbox in good condition
-
(3) Driveway
-
3(a) proper finish
-
3(b) control joints
-
3(c) clean with no stains, footprints or tool marks
-
3(d) no unfilled cracks >1/8"
-
(4) Exterior clean & pressure washed with no concrete splatter on siding
-
(5) Paint meets Builder standards (more than 5 touch ups = 0)
-
5(a) No paint overspray on siding, windows or trim
-
(6) Siding straight & free of damage
-
(7) Exterior vents installed square to siding and in alignment
-
(8) House numbers installed in correct location
-
(9) Shutters clean, secure & straight
-
(10) Coach lights
-
10(a) straight & operable with CFLs
-
10(b) mounting blocks larger than base & caulked
-
(11) Light fixtures installed per plan (any bulb missing or not working = 0)
-
(12) Exterior outlets & covers installed correctly
-
(13) Front porch is clean & free of excessive cracks (crack > 1/8" = 0)
-
(14) Roof flashing is painted black, installed properly with kick out
-
(15) Shingles free of damage, secure & clean with proper overhang
-
(16) Plumbing vent stacks painted black
-
(17) Gutters
-
17(a) rain diverter installed over doors without gutters
-
17(b) gutters installed in good condition
-
(18) Stickers removed from attic window(s) / No framing visible
-
(19) Window screens installed (except sliding glass door)
-
(20) Hose bibs secure with backflow prevention
-
(21) Dryer vented outside with backflow flapper
-
(22) Penetrations sealed with clear silicone (any penetrations missing silicone = 0 )
-
(23) Bath fans vented with screens installed
-
(24) AC unit level and at proper grade
-
(25) Porch columns plumb & secure
-
(26) Front porch rails secured & stairs in good condition
-
(27) Window boxes installed, with weep holes
-
(28) Fences w/ Gates straight
Exterior (continued)
-
29(a) anchored properly
-
29(b) gate swings freely
-
29(c) lumber tags removed
Yard/Landscaping
-
(1) All valve & irrigation boxes covered, clean, & accessible
-
(2) Sod/Shrubs/trees
-
2(a) in good condition & watered
-
2(b) sod extends to property lines
-
(3) Landscaping tags removed
-
(4) Yard free of trash & construction debris
-
(5) Grass cut, yard & beds free of weeds
-
(6) Yard graded away from house
-
(7) Sewer clean out flush with ground, no damage, brass cap if in driveway
-
(8) Finished grade 6" from plate at siding and 4" at brick
Crawl Space
-
(1) Graded smooth
-
(2) Poly is down & crawl space is clean
-
(3) No visible discoloration / mildew on framing members
-
(4) Water can exit
-
(5) Insulation installed with enough tiger teeth
-
(6) Foundation vents operate with proper ventilation
Slab
-
(1) Foundation parged, all nails removed, good condition
-
(2) Slab edge insulation installed properly with Stucco finish (Raleigh NC)
Brick Siding
-
(1) Brick lintels painted w/rust resistant paint
-
(2) Brick row lock properly sloped
-
(3) Brick weep holes installed per code (every 33")
-
(4) Brick returns sealed to foundation (mortar/caulk)
-
(5) Flashing installed properly
-
(6) Windows and doors caulked with clear silicone
Stone Veneer Siding
-
(1) Flashing installed properly
-
(2) Stone Veneer installed properly with Weep Screen
-
(3) Stone Veneer grout lines clean
Patio
-
(1) Patio is the correct size and is in the correct location
-
(2) Clean & free of stains & excessive cracks (crack > 1/8" = 0)
Screened Porch
-
(1) Screens tight and free of damage
-
(2) Screen end piece against house flush to trim piece, not installed over siding
-
(3) Screened door is operable
-
(4) Screening installed under deck boards
2nd Floor Porch
-
(1) Flashed properly w/ metal (not rubber)
-
(2) Porch rails are secured and spindles in good condition
-
(3) Porch columns are plumb and secure
2nd Floor Porch (continued)
-
(4) Porch door
-
4(a) lock operable, deadbolt throws
-
4(b) threshold in good condition, clean and adjusted
-
4(c) adjusted, weather stripping installed, no daylight visible
-
4(d) painted (six sides), free of damage & door bump installed
Deck
-
(1) Flashed properly w/ metal (not rubber)
-
(2) Lumber tags removed from boards
-
(3) No nails or screws between deck boards
-
(4) All boards secured & nailed properly
Front & Rear Entry
-
(1) Front door
-
1(a) lock operable, deadbolt throws
-
1(b) threshold in good condition, clean and adjusted
-
1(c) adjusted, weather stripping installed, no daylight visible
-
1(d) painted (six sides) & door bump installed
-
(2) Doorbell operable
-
(3) Light fixtures located per plan
-
3(a) complete & operable (any bulb missing or not working = 0 )
-
(4) Light switches located & installed per plan
-
(5) Electrical plates straight & clean
-
(6) Drywall meets Builder Standard
-
6(a) returns at windows level/square/consistent reveal (more than 3 minor areas)
-
(7) Paint meets Builder Standard (more than 3 touch up spots = 0 )
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Back Door
-
10(a) threshold in good condition, clean and adjusted
-
10(b) door adjusted, weather stripping installed, no daylight visible
-
10(c) painted (six sides), free of damage & door bump installed
-
10(d) Back door/sliding door lock operable, deadbolt throws
-
(11) Windows
-
11(a) Windows operable
-
11(b) Free of defects/damage
-
11(c) Caulked & cleaned with no pencil marks
-
(12) Blinds level & free of defects/damage
Living Room
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) No surface marks or scuffs
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
-
(8) Windows
-
8(a) windows operable
-
8(b) free of defects/damage
-
8(c) caulked & cleaned with no pencil marks
-
(9) Blinds level & free of defects/damage
Dining Room
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) No surface marks or scuffs
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
Dining Room (continued)
-
(8) Windows
-
8(a) windows operable
-
8(b) free of defects/damage
-
8(c) caulked & cleaned with no pencil marks
-
(9) Blinds level & free of defects/damage
Kitchen / EatIn / Breakfast
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) No surface marks or scuffs
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
-
(8) Paint kit, including all paint types, is under kitchen sink
-
(9) Cabinet touch up kit provided for EACH kitchen cabinet color
-
(10) Counters clean, free of scratches, caulked
-
(11) GFCI’s installed
-
(12) Manuals nicely organized in single drawer
-
(13) Pantry
-
13(a) Door painted & adjusted w/door bump
-
13(b) Shelves straight & secure
-
(14) Windows
-
14(a) windows operable
-
14(b) free of defects/damage
-
14(c) caulked & cleaned with no pencil marks
-
(15) Blinds level & free of defects/damage
Cabinets
-
(1) free of damage (more than 3 t/u = 0)
-
(2) doors/drawers aligned/adjusted
-
(3) doors operable w/door bumps
-
(4) All shelf supports in place
-
(5) cabinet 1/4 round installed
(6) ALL nail holes filled
-
(7) ends are returned
-
(8) joints are caulked
Appliances
-
(1) All appliances are unpacked, stickers, plastic & cardboard removed
-
(2) Dishwasher properly secured, level, & operable w/ no leaks
-
(3) Microwave/Hood
-
3(a) lights & fan are operable
-
3(b) clock is set
-
3(c) free of dents & scratches
-
(4) Range
-
4(a) (oven and cooktop=single unit) level
-
4(b) free of damage
-
4(c) antitip installed
-
4(d) flush with countertop
-
4(e) clock set
-
(5) Cooking Surface is clean & operable (separate cooktop as with a wall oven)
-
(6) Refrigerator clean, free of dents/scratches, ice & water operable
-
(7) Wall oven free of damage, level, secure, clock set
Plumbing
-
(1) Sink filled, drained, caulked, free of leaks & damage
-
(2) Kitchen faucet
-
2(a) hot water is on the left
-
2(b) spray is operable
-
2(c) soap dispenser installed
-
(3) Disposal runs clean & wire is secure
-
(4) Seal penetrations under sinks, escutcheons completely cover holes
-
(5) Fittings are tight, no leaks
Family Room
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) No surface marks or scuffs
Family Room (continued)
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
-
(8) Windows
-
8(a) windows operable
-
8(b) free of defects/damage
-
8(c) caulked & cleaned with no pencil marks
-
(9) Blinds level & free of defects/damage
Fireplace(s)
-
(1) Mantel & hearth
-
1(a) surround installed properly
-
1(b) clean & free of defects
-
(2) Gas logs operable, rocks & embers in place
Sunroom
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) no surface marks or scuffs
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
-
(8) Windows
-
8(a) Windows operable
-
8(b) Free of defects/damage
-
8(c) Caulked & cleaned with no pencil marks
-
(9) Blinds level & free of defects/damage
Organizational Space
-
(1) Doors
-
1(a) painted (six sides)
-
1(b) free of damage
-
1(c) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Drywall (more than 3 minor areas)
-
5(a) meets Builder Standard
-
5(b) returns at windows level/square/consistent reveal
-
(6) Paint meets Builder Standard (more than 3 touch up spots = 0 )
-
(7) Trim
-
7(a) trim work level
-
7(b) free of damage with no tool marks
-
7(c) joints caulked
-
(8) Floors (more than 3 touch ups = 0 )
-
8(a) are level
-
8(b) clean with no blemishes/damage
-
8(c) no squeaks
-
(9) Windows
-
9(a) windows operable
-
9(b) free of defects/damage
-
9(c) caulked & cleaned with no pencil marks
-
(10) Blinds level & free of defects/damage
-
(11) Cabinets (more than 3 t/u = 0)
-
11(a) free of damage
-
11(b) doors/drawers aligned/adjusted
-
11(c) operable w/door bumps
-
11(d) all shelf supports in place
-
11(e) cabinet 1/4 round installed
11(f) ALL nail holes filled
-
11(g) ends are returned
-
11(h) joints are caulked
-
(12) Counters clean, free of scratches, caulked
Powder Room
-
(1) Bathroom Doors
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
Powder Room (continued)
-
(5) Lights, mirrors, and faucets are aligned
-
(6) Drywall (more than 3 minor areas)
-
6(a) meets Builder Standard
-
6(b) returns at windows level/square/consistent reveal
-
(7) Paint meets Builder Standard (more than 3 touch up spots = 0 )
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Sink
-
10(a) filled & drained
-
10(b) caulked
-
10(c) free of leaks & damage
-
(11) Faucets
-
11(a) lift rods free of leaks & damage
-
11(b) hot water on left
-
(12) Tissue holder, towel bar & rings straight & secure
-
(13) Mirrors installed, free of defects, & scratches
-
(14) Toilet level, caulked, operable, fill stopper working properly
-
(15) Exhaust fans function
-
(16) Fittings
-
16(a) are tight with no leaks
-
16(b) penetrations under sinks are sealed
-
16(c) escutcheons completely cover holes
-
(17) Tile
-
17(a) tile work has no voids
-
17(b) excessive grout removed
-
(18) Cabinets (more than 3 t/u = 0)
-
18(a) free of damage
-
18(b) doors/drawers aligned/adjusted
-
18(c) operable w/door bumps
-
18(d) All shelf supports in place
-
18(e) Cabinet 1/4 round installed
18(f) ALL nail holes filled
-
18(g) ends are returned
-
18(h) joints are caulked
-
(19) Windows
-
19(a) Windows operable
-
19(b) Free of defects/damage
-
19(c) Caulked & cleaned with no pencil marks
-
(20) Blinds level & free of defects/damage
Garage Entry/ Mudroom
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint meets Builder Standard (more than 3 touch up spots = 0 )
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
-
(8) Windows
-
8(a) Windows operable
-
8(b) Free of defects/damage
-
8(c) Caulked & cleaned with no pencil marks
-
(9) Blinds level & free of defects/damage
Garage
-
(1) Garage Door
-
1(a) lock operable, deadbolt throws
-
1(b) adjusted, weather stripping installed, no daylight visible
-
1(c) painted (six sides)
-
1(d) free of damage
-
1(e) door bump installed
-
1(f) threshold in good condition, clean & adjusted
-
(2) Overhead door
-
2(a) door operable & free of damage
-
2(b) prewires in proper locations
-
2(c) opener installed if option chosen
-
2(d) door jam covered with fiber cement
-
2(e) door jam weather stripping installed (nailed at 12” max)
-
(3) Service door
-
3(a) adjusted, lock operable
-
3(b) painted (six sides)
-
3(c) free of damage
-
3(d) door bump installed
Water Heater & Electrical
-
(1) Electrical Panel labeled, SOS sticker on door
-
(2) Electric Main labeled
-
(3) Water heater
-
3(a) operating
-
3(b) level
-
3(c) clean
Water Heater & Electrical (continued)
-
3(d) set between 110 and 120
-
3(e) vent block installed
-
3(f) sealed to block
-
(4) PRV Drain line piped outdoors (except NC & Myrtle Beach)
Hallways
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Electrical plates straight & clean
-
(4) Drywall (more than 3 minor areas)
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) No surface marks or scuffs
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
-
(8) Windows
-
8(a) windows operable
-
8(b) free of defects/damage
-
8(c) caulked & cleaned with no pencil marks
-
(9) Thermostat has been mounted properly & has power
-
(10) Blinds level & free of defects/damage
Coat & Linen Closets
-
(1) Door
-
1(a) painted (six sides)
-
1(b) free of damage
-
1(c) door bump installed
-
(2) Drywall (more than 3 minor areas)
-
2(a) meets Builder Standard
-
2(b) returns at windows level/square/consistent reveal
-
(3) Paint meets Builder Standard (more than 3 touch up spots = 0 )
-
(4) Shelves straight & secure
Stairwell
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) located per plan
-
1(b) complete & operable
-
(2) Light switches located & installed per plan
-
(3) Drywall (more than 3 minor areas)
-
3(a) meets Builder Standard
-
3(b) returns at windows level/square/consistent reveal
-
(4) Paint
-
4(a) overall coverage, surface smooth, or thin
-
4(b) clean lines at cut in, trim caulked, trim finish
-
4(c) No surface marks or scuffs
-
(5) Trim
-
5(a) trim work level
-
5(b) free of damage with no tool marks
-
5(c) joints caulked
-
(6) Stairs
-
6(a) stairs are level
-
6(b) clean with no blemishes/damage
-
6(c) no squeaks
-
(7) Hardwoods on landing sanded smooth (more than 3 touch ups = 0 )
-
(8) Handrail secure, brackets installed with proper screws
-
(9) Post/pickets secure
-
(10) Nails aren't visible on sides of stair stringers
Laundry Room
-
(1) Door
-
1(a) painted (six sides)
-
1(b) free of damage
-
1(c) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
(4) Drywall (more than 3 minor areas) +
-
4(a) meets Builder Standard
-
4(b) returns at windows level/square/consistent reveal
-
(5) Paint
-
5(a) overall coverage, surface smooth, or thin
-
5(b) clean lines at cut in, trim caulked, trim finish
-
5(c) No surface marks or scuffs
-
(6) Trim
-
6(a) trim work level
-
6(b) free of damage with no tool marks
-
6(c) joints caulked
-
(7) Floors (more than 3 touch ups = 0 )
-
7(a) are level
-
7(b) clean with no blemishes/damage
-
7(c) no squeaks
Laundry Room (continued)
-
(8) Cabinets/shelves
-
8(a) are secure, straight
-
8(b) free of damage (more than 3 t/u=0)
-
(9) Windows
-
9(a) Windows operable
-
9(b) Free of defects/damage
-
9(c) Caulked & cleaned with no pencil marks
-
(10) Blinds level & free of defects/damage
Master Bedroom
-
(1) Door
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Lights, mirrors, and faucets are aligned
-
(5) Electrical plates straight & clean
(6) Drywall (more than 3 minor areas) +
-
6(a) meets Builder Standard
-
6(b) returns at windows level/square/consistent reveal
-
(7) Paint
-
7(a) overall coverage, surface smooth, or thin
-
7(b) clean lines at cut in, trim caulked, trim finish
-
7(c) No surface marks or scuffs
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Windows
-
10(a) windows operable
-
10(b) free of defects/damage
-
10(c) caulked & cleaned with no pencil marks
-
(11) Blinds level & free of defects/damage
Master Bath & WIC
-
(1) Bath Door(s)
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump(s) installed
Master Bath & WIC (continued)
-
(2) Closet Door(s)
-
2(a) painted (six sides)
-
2(b) adjusted
-
2(c) free of damage
-
2(d) door bump(s) installed
-
(3) Light fixtures (any bulb missing or not working = 0 )
-
3(a) located per plan
-
3(b) complete & operable
-
(4) Light switches located & installed per plan
-
(5) Lights, mirrors, and faucets are aligned
-
(6) Electrical plates straight & clean
-
(7) Drywall (more than 3 minor areas)
-
7(a) meets Builder Standard
-
7(b) returns at windows level/square/consistent reveal
-
(8) Paint
-
8(a) overall coverage, surface smooth, or thin
-
8(b) clean lines at cut in, trim caulked, trim finish
-
8(c) No surface marks or scuffs
-
(9) Trim
-
9(a) trim work level
-
9(b) free of damage with no tool marks
-
9(c) joints caulked
-
(10) Floors (more than 3 touch ups = 0 )
-
10(a) are level
-
10(b) clean
-
10(c) no blemishes/damage
-
10(d) no squeaks
-
(11) Windows
-
11(a) windows operable
-
11(b) free of defects/damage
-
11(c) caulked & cleaned with no pencil marks
-
(12) Blinds level & free of defects/damage
-
(13) Shelves
-
13(a) are secure, straight
-
13(b) free of damage (more than 3 t/u=0)
-
13(c) Proper shelving / rod brackets installed
-
13(d) all end caps installed on shelving / rods
-
(14) Closet is clean and void of extra flooring, tile, etc
-
(15) Sink filled, drained, caulked, free of leaks & damage
-
(16) Faucets & lift rods free of leaks & damage, hot water on left
-
(17) Tub (if any mark needs more than buffing=0)
-
17(a) tub caulked
-
17(b) free of damage
-
17(c) filled & drained
-
17(d) hot water on the left
-
(18) Shower (if any mark needs more than buffing=0)
-
18(a) caulked per manufacturer's recommendations
-
18(b) free of damage
Master Bath & WIC (continued)
-
18(c) hot water on the left
-
18(d) no leaks at caulk joints
-
18(e) Tile work has no voids, excessive grout removed
-
(19) Glass shower
-
19(a) enclosure functional
-
19(b) door sweep installed
-
19(c) bottom frame installed with weep holes (no debris)
-
(20) Tissue holder, towel bars & rings straight & secure
-
(21) Cabinets (more than 3 t/u = 0)
-
21(a) free of damage
-
21(b) doors/drawers aligned/adjusted
-
21(c) operable w/door bumps
-
21(d) All shelf supports in place
-
21(e) Cabinet 1/4 round installed
21(f) ALL nail holes filled
-
21(g) ends are returned
-
21(h) joints are caulked
-
(22) Mirrors installed, free of defects, & scratches
-
(23) Toilet level, caulked, operable, fill stopper working properly
-
(24) Exhaust fans function
-
(25) Minimal flexing of tub & shower floors
-
(26) Fittings
-
26(a) fittings are tight with no leaks
-
26(b) penetrations under sinks are sealed
-
26(c) escutcheons completely cover holes
-
(27) Blinds level & free of defects/damage
Bedroom 2
-
(1) Bedroom Door
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
(5) Drywall (more than 3 minor areas) +
-
5(a) meets Builder Standard
-
5(b) returns at windows level/square/consistent reveal
-
(6) Paint
-
6(a) overall coverage, surface smooth, or thin
-
6(b) clean lines at cut in, trim caulked, trim finish
-
6(c) No surface marks or scuffs
-
(7) Trim
-
7(a) trim work level
-
7(b) free of damage with no tool marks
-
7(c) joints caulked
Bedroom 2 (continued)
-
(8) Floors (more than 3 touch ups = 0 )
-
8(a) are level
-
8(b) clean with no blemishes/damage
-
8(c) no squeaks
-
(9) Windows
-
9(a) windows operable
-
9(b) free of defects/damage
-
9(c) caulked & cleaned with no pencil marks
-
(10) Closet Door
-
10(a) painted (six sides)
-
10(b) adjusted
-
10(c) free of damage
-
10(d) door bumps installed
-
(11) Shelves are secure, straight, and free of damage
-
(12) Closet is clean and void of extra flooring, tile, etc
-
(13) Blinds level & free of defects/damage
Bedroom 3
-
(1) Bedroom Door
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Drywall (more than 3 minor areas)
-
5(a) meets Builder Standard
-
5(b) returns at windows level/square/consistent reveal
-
(6) Paint
-
6(a) overall coverage, surface smooth, or thin
-
6(b) clean lines at cut in, trim caulked, trim finish
-
6(c) No surface marks or scuffs
-
(7) Trim
-
7(a) trim work level
-
7(b) free of damage with no tool marks
-
7(c) joints caulked
-
(8) Floors (more than 3 touch ups = 0 )
-
8(a) are level
-
8(b) clean with no blemishes/damage
-
8(c) no squeaks
-
(9) Windows
-
9(a) windows operable
-
9(b) free of defects/damage
-
9(c) caulked & cleaned with no pencil marks
Bedroom 3 (continued)
-
(10) Closet Door
-
10(a) painted (six sides)
-
10(b) adjusted
-
10(c) free of damage
-
10(d) door bump installed
-
(11) Shelves are secure, straight, and free of damage
-
(12) Closet is clean and void of extra flooring, tile, etc
-
(13) Blinds level & free of defects/damage
Bedroom 4
-
(1) Bedroom Door
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Drywall (more than 3 minor areas)
-
5(a) meets Builder Standard
-
5(b) returns at windows level/square/consistent reveal
-
(6) Paint
-
6(a) overall coverage, surface smooth, or thin
-
6(b) clean lines at cut in, trim caulked, trim finish
-
6(c) No surface marks or scuffs
-
(7) Trim
-
7(a) trim work level
-
7(b) free of damage with no tool marks
-
7(c) joints caulked
-
(8) Floors (more than 3 touch ups = 0 )
-
8(a) are level
-
8(b) clean with no blemishes/damage
-
8(c) no squeaks
-
(9) Windows
-
9(a) windows operable
-
9(b) free of defects/damage
-
9(c) caulked & cleaned with no pencil marks
-
(10) Closet Door
-
10(a) painted (six sides)
-
10(b) adjusted
-
10(c) free of damage
-
10(d) door bump installed
-
(11) Shelves are secure, straight, and free of damage
-
(12) Closet is clean and void of extra flooring, tile, etc
-
(13) Blinds level & free of defects/damage
Bedroom 5
-
(1) Bedroom Door
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Drywall (more than 3 minor areas)
-
5(a) meets Builder Standard
-
5(b) returns at windows level/square/consistent reveal
-
(6) Paint
-
6(a) overall coverage, surface smooth, or thin
-
6(b) clean lines at cut in, trim caulked, trim finish
-
6(c) No surface marks or scuffs
-
(7) Trim
-
7(a) trim work level
-
7(b) free of damage with no tool marks
-
7(c) joints caulked
-
(8) Floors (more than 3 touch ups = 0 )
-
8(a) are level
-
8(b) clean with no blemishes/damage
-
8(c) no squeaks
-
(9) Windows
-
9(a) windows operable
-
9(b) free of defects/damage
-
9(c) caulked & cleaned with no pencil marks
-
(10) Closet Door
-
10(a) painted (six sides)
-
10(b) adjusted
-
10(c) free of damage
-
10(d) door bump installed
-
(11) Shelves are secure, straight, and free of damage
-
(12) Closet is clean and void of extra flooring, tile, etc
-
(13) Blinds level & free of defects/damage
Bathroom 2
-
(1) Bathroom Doors
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
Bathroom 2 (continued)
-
(5) Lights, mirrors, and faucets are aligned
-
(6) Drywall (more than 3 minor areas)
-
6(a) meets Builder Standard
-
6(b) returns at windows level/square/consistent reveal
-
(7) Paint
-
7(a) overall coverage, surface smooth, or thin
-
7(b) clean lines at cut in, trim caulked, trim finish
-
7(c) No surface marks or scuffs
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Sink
-
10(a) filled & drained
-
10(b) caulked
-
10(c) free of leaks & damage
-
(11) Faucets
-
11(a) lift rods free of leaks & damage
-
11(b) hot water on left
-
(12) Tub (if any mark needs more than buffing=0)
-
12(a) tub caulked
-
12(b) free of damage
-
12(c) filled & drained
-
12(d) hot water on the left
-
(13) Tissue holder, towel bar & rings straight & secure
-
(14) Mirrors installed, free of defects, & scratches
-
(15) Toilet level, caulked, operable, fill stopper working properly
-
(16) Exhaust fans function
-
(17) Fittings
-
17(a) are tight with no leaks
-
17(b) penetrations under sinks are sealed
-
17(c) escutcheons completely cover holes
-
(18) Tile
-
18(a) tile work has no voids
-
18(b) excessive grout removed
-
(19) Cabinets (more than 3 t/u = 0)
-
19(a) free of damage
-
19(b) doors/drawers aligned/adjusted
-
19(c) operable w/door bumps
-
19(d) All shelf supports in place
-
19(e) Cabinet 1/4 round installed
19(f) ALL nail holes filled
-
19(g) ends are returned
-
19(h) joints are caulked
Bathroom 2 (continued)
-
(20) Windows
-
20(a) windows operable
-
20(b) free of defects/damage
-
20(c) caulked & cleaned with no pencil marks
-
(21) Blinds level & free of defects/damage
Bathroom 3
-
(1) Bathroom Doors
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Lights, mirrors, and faucets are aligned
-
(6) Drywall (more than 3 minor areas)
-
6(a) meets Builder Standard
-
6(b) returns at windows level/square/consistent reveal
-
(7) Paint
-
7(a) overall coverage, surface smooth, or thin
-
7(b) clean lines at cut in, trim caulked, trim finish
-
7(c) No surface marks or scuffs
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Sink
-
10(a) filled & drained
-
10(b) caulked
-
10(c) free of leaks & damage
-
(11) Faucets
-
11(a) lift rods free of leaks & damage
-
11(b) hot water on left
-
(12) Tub (if any mark needs more than buffing=0)
-
12(a) tub caulked
-
12(b) free of damage
-
12(c) filled & drained
-
12(d) hot water on the left
-
(13) Tissue holder, towel bar & rings straight & secure
-
(14) Mirrors installed, free of defects, & scratches
-
(15) Toilet level, caulked, operable, fill stopper working properly
Bathroom 3 (continued)
-
(16) Exhaust fans function
-
(17) Fittings
-
17(a) are tight with no leaks
-
17(b) penetrations under sinks are sealed
-
17(c) escutcheons completely cover holes
-
(18) Tile
-
18(a) tile work has no voids
-
18(b) excessive grout removed
-
(19) Cabinets (more than 3 t/u = 0)
-
19(a) free of damage
-
19(b) doors/drawers aligned/adjusted
-
19(c) operable w/door bumps
-
19(d) All shelf supports in place
-
19(e) Cabinet 1/4 round installed
19(f) ALL nail holes filled
-
19(g) ends are returned
-
19(h) joints are caulked
-
(20) Windows
-
20(a) Windows operable
-
20(b) Free of defects/damage
-
20(c) Caulked & cleaned with no pencil marks
-
(21) Blinds level & free of defects/damage
Bathroom 4
-
(1) Bathroom Doors
-
1(a) painted (six sides)
-
1(b) adjusted
-
1(c) free of damage
-
1(d) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Lights, mirrors, and faucets are aligned
-
(6) Drywall (more than 3 minor areas)
-
6(a) meets Builder Standard
-
6(b) returns at windows level/square/consistent reveal
-
(7) Paint
-
7(a) overall coverage, surface smooth, or thin
-
7(b) clean lines at cut in, trim caulked, trim finish
-
7(c) No surface marks or scuffs
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
Bathroom 4 (continued)
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Sink
-
10(a) filled & drained
-
10(b) caulked
-
10(c) free of leaks & damage
-
(11) Faucets
-
11(a) lift rods free of leaks & damage
-
11(b) hot water on left
-
(12) Tub (if any mark needs more than buffing=0)
-
12(a) tub caulked
-
12(b) free of damage
-
12(c) filled & drained
-
12(d) hot water on the left
-
(13) Tissue holder, towel bar & rings straight & secure
-
(14) Mirrors installed, free of defects, & scratches
-
(15) Toilet level, caulked, operable, fill stopper working properly
-
(16) Exhaust fans function
-
(17) Fittings
-
17(a) are tight with no leaks
-
17(b) penetrations under sinks are sealed
-
17(c) escutcheons completely cover holes
-
(18) Tile
-
18(a) tile work has no voids
-
18(b) excessive grout removed
-
(19) Cabinets (more than 3 t/u = 0)
-
19(a) free of damage
-
19(b) doors/drawers aligned/adjusted
-
19(c) operable w/door bumps
-
19(d) all shelf supports in place
-
19(e) cabinet 1/4 round installed
19(f) ALL nail holes filled
-
19(g) ends are returned
-
19(h) joints are caulked
-
(20) Windows
-
20(a) windows operable
-
20(b) free of defects/damage
-
20(c) caulked & cleaned with no pencil marks
-
(21) Blinds level & free of defects/damage
Loft/Bonus Room
-
(1) Door
-
1(a) painted (six sides)
-
1(b) adjusted & free of damage
-
1(c) door bump installed
-
(2) Light fixtures (any bulb missing or not working = 0 )
-
2(a) located per plan
Loft/Bonus Room (continued)
-
2(b) complete & operable
-
(3) Light switches located & installed per plan
-
(4) Electrical plates straight & clean
-
(5) Lights, mirrors, and faucets are aligned
-
(6) Drywall (more than 3 minor areas)
-
6(a) meets Builder Standard
-
6(b) returns at windows level/square/consistent reveal
-
(7) Paint
-
7(a) overall coverage, surface smooth, or thin
-
7(b) clean lines at cut in, trim caulked, trim finish
-
7(c) No surface marks or scuffs
-
(8) Trim
-
8(a) trim work level
-
8(b) free of damage with no tool marks
-
8(c) joints caulked
-
(9) Floors (more than 3 touch ups = 0 )
-
9(a) are level
-
9(b) clean with no blemishes/damage
-
9(c) no squeaks
-
(10) Windows
-
10(a) windows operable
-
10(b) free of defects/damage
-
10(c) caulked & cleaned with no pencil marks
-
(11) Closet Door
-
11(a) painted (six sides)
-
11(b) adjusted & free of damage
-
11(c) door bump installed
-
(12) Shelves are secure, straight, and free of damage
-
(13) Closet is clean and void of extra flooring, tile, etc
-
(14) Blinds level & free of defects/damage
Attic
-
(1) Light fixtures (any bulb missing or not working = 0 )
-
1(a) operable & accessible from attic entrance
-
(2) Pull down steps
-
2(a) proper length, nailed properly
-
2(b) free of defects
-
2(c) insulated & weather stripped
-
(3) Air handler drain pan
-
3(a) clean & free of debris
-
3(b) shut off switch is installed
-
3(c) overflow piped properly
-
(4) Blown insulation in place with no voids, depth gauge installed
-
(5) Ridge vent/soffit free of obstruction
-
(6) Wall access door insulated, weather stripped, and latches tightly
-
(7) No visible discoloration / mildew on framing members
-
(8) Attic clean & swept