Title Page

  • Conducted on

  • Prepared by

  • Location
  • Table 1

  • (1) ELECTRIC METER SET

  • (2) GAS METER SET

  • (3) WATER METER SET

  • (4) Community standards are installed

  • (5) Final cleaning complete (anything more than minor touch up cleaning =0 )

  • (6) Smoke Detectors are operable

  • (7) Extra flooring stacked neatly in the attic

  • (8) No noticeable temperature variations between rooms

  • (9) Stash center painted, damage free, door adjusted and closes flush

Exterior

  • (1) FRONT ELEVATION IS CORRECT

  • (2) Mailbox in good condition

  • (3) Driveway

  • 3(a) proper finish

  • 3(b) control joints

  • 3(c) clean with no stains, footprints or tool marks

  • 3(d) no unfilled cracks >1/8"

  • (4) Exterior clean & pressure washed with no concrete splatter on siding

  • (5) Paint meets Builder standards (more than 5 touch ups = 0)

  • 5(a) No paint overspray on siding, windows or trim

  • (6) Siding straight & free of damage

  • (7) Exterior vents installed square to siding and in alignment

  • (8) House numbers installed in correct location

  • (9) Shutters clean, secure & straight

  • (10) Coach lights

  • 10(a) straight & operable with CFLs

  • 10(b) mounting blocks larger than base & caulked

  • (11) Light fixtures installed per plan (any bulb missing or not working = 0)

  • (12) Exterior outlets & covers installed correctly

  • (13) Front porch is clean & free of excessive cracks (crack > 1/8" = 0)

  • (14) Roof flashing is painted black, installed properly with kick out

  • (15) Shingles free of damage, secure & clean with proper overhang

  • (16) Plumbing vent stacks painted black

  • (17) Gutters

  • 17(a) rain diverter installed over doors without gutters

  • 17(b) gutters installed in good condition

  • (18) Stickers removed from attic window(s) / No framing visible

  • (19) Window screens installed (except sliding glass door)

  • (20) Hose bibs secure with backflow prevention

  • (21) Dryer vented outside with backflow flapper

  • (22) Penetrations sealed with clear silicone (any penetrations missing silicone = 0 )

  • (23) Bath fans vented with screens installed

  • (24) AC unit level and at proper grade

  • (25) Porch columns plumb & secure

  • (26) Front porch rails secured & stairs in good condition

  • (27) Window boxes installed, with weep holes

  • (28) Fences w/ Gates straight

Exterior (continued)

  • 29(a) anchored properly

  • 29(b) gate swings freely

  • 29(c) lumber tags removed

Yard/Landscaping

  • (1) All valve & irrigation boxes covered, clean, & accessible

  • (2) Sod/Shrubs/trees

  • 2(a) in good condition & watered

  • 2(b) sod extends to property lines

  • (3) Landscaping tags removed

  • (4) Yard free of trash & construction debris

  • (5) Grass cut, yard & beds free of weeds

  • (6) Yard graded away from house

  • (7) Sewer clean out flush with ground, no damage, brass cap if in driveway

  • (8) Finished grade 6" from plate at siding and 4" at brick

Crawl Space

  • (1) Graded smooth

  • (2) Poly is down & crawl space is clean

  • (3) No visible discoloration / mildew on framing members

  • (4) Water can exit

  • (5) Insulation installed with enough tiger teeth

  • (6) Foundation vents operate with proper ventilation

Slab

  • (1) Foundation parged, all nails removed, good condition

  • (2) Slab edge insulation installed properly with Stucco finish (Raleigh NC)

Brick Siding

  • (1) Brick lintels painted w/rust resistant paint

  • (2) Brick row lock properly sloped

  • (3) Brick weep holes installed per code (every 33")

  • (4) Brick returns sealed to foundation (mortar/caulk)

  • (5) Flashing installed properly

  • (6) Windows and doors caulked with clear silicone

Stone Veneer Siding

  • (1) Flashing installed properly

  • (2) Stone Veneer installed properly with Weep Screen

  • (3) Stone Veneer grout lines clean

Patio

  • (1) Patio is the correct size and is in the correct location

  • (2) Clean & free of stains & excessive cracks (crack > 1/8" = 0)

Screened Porch

  • (1) Screens tight and free of damage

  • (2) Screen end piece against house flush to trim piece, not installed over siding

  • (3) Screened door is operable

  • (4) Screening installed under deck boards

2nd Floor Porch

  • (1) Flashed properly w/ metal (not rubber)

  • (2) Porch rails are secured and spindles in good condition

  • (3) Porch columns are plumb and secure

2nd Floor Porch (continued)

  • (4) Porch door

  • 4(a) lock operable, deadbolt throws

  • 4(b) threshold in good condition, clean and adjusted

  • 4(c) adjusted, weather stripping installed, no daylight visible

  • 4(d) painted (six sides), free of damage & door bump installed

Deck

  • (1) Flashed properly w/ metal (not rubber)

  • (2) Lumber tags removed from boards

  • (3) No nails or screws between deck boards

  • (4) All boards secured & nailed properly

Front & Rear Entry

  • (1) Front door

  • 1(a) lock operable, deadbolt throws

  • 1(b) threshold in good condition, clean and adjusted

  • 1(c) adjusted, weather stripping installed, no daylight visible

  • 1(d) painted (six sides) & door bump installed

  • (2) Doorbell operable

  • (3) Light fixtures located per plan

  • 3(a) complete & operable (any bulb missing or not working = 0 )

  • (4) Light switches located & installed per plan

  • (5) Electrical plates straight & clean

  • (6) Drywall meets Builder Standard

  • 6(a) returns at windows level/square/consistent reveal (more than 3 minor areas)

  • (7) Paint meets Builder Standard (more than 3 touch up spots = 0 )

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Back Door

  • 10(a) threshold in good condition, clean and adjusted

  • 10(b) door adjusted, weather stripping installed, no daylight visible

  • 10(c) painted (six sides), free of damage & door bump installed

  • 10(d) Back door/sliding door lock operable, deadbolt throws

  • (11) Windows

  • 11(a) Windows operable

  • 11(b) Free of defects/damage

  • 11(c) Caulked & cleaned with no pencil marks

  • (12) Blinds level & free of defects/damage

Living Room

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) No surface marks or scuffs

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

  • (8) Windows

  • 8(a) windows operable

  • 8(b) free of defects/damage

  • 8(c) caulked & cleaned with no pencil marks

  • (9) Blinds level & free of defects/damage

Dining Room

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) No surface marks or scuffs

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

Dining Room (continued)

  • (8) Windows

  • 8(a) windows operable

  • 8(b) free of defects/damage

  • 8(c) caulked & cleaned with no pencil marks

  • (9) Blinds level & free of defects/damage

Kitchen / EatIn / Breakfast

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) No surface marks or scuffs

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

  • (8) Paint kit, including all paint types, is under kitchen sink

  • (9) Cabinet touch up kit provided for EACH kitchen cabinet color

  • (10) Counters clean, free of scratches, caulked

  • (11) GFCI’s installed

  • (12) Manuals nicely organized in single drawer

  • (13) Pantry

  • 13(a) Door painted & adjusted w/door bump

  • 13(b) Shelves straight & secure

  • (14) Windows

  • 14(a) windows operable

  • 14(b) free of defects/damage

  • 14(c) caulked & cleaned with no pencil marks

  • (15) Blinds level & free of defects/damage

Cabinets

  • (1) free of damage (more than 3 t/u = 0)

  • (2) doors/drawers aligned/adjusted

  • (3) doors operable w/door bumps

  • (4) All shelf supports in place

  • (5) cabinet 1/4 round installed

(6) ALL nail holes filled

  • (7) ends are returned

  • (8) joints are caulked

Appliances

  • (1) All appliances are unpacked, stickers, plastic & cardboard removed

  • (2) Dishwasher properly secured, level, & operable w/ no leaks

  • (3) Microwave/Hood

  • 3(a) lights & fan are operable

  • 3(b) clock is set

  • 3(c) free of dents & scratches

  • (4) Range

  • 4(a) (oven and cooktop=single unit) level

  • 4(b) free of damage

  • 4(c) antitip installed

  • 4(d) flush with countertop

  • 4(e) clock set

  • (5) Cooking Surface is clean & operable (separate cooktop as with a wall oven)

  • (6) Refrigerator clean, free of dents/scratches, ice & water operable

  • (7) Wall oven free of damage, level, secure, clock set

Plumbing

  • (1) Sink filled, drained, caulked, free of leaks & damage

  • (2) Kitchen faucet

  • 2(a) hot water is on the left

  • 2(b) spray is operable

  • 2(c) soap dispenser installed

  • (3) Disposal runs clean & wire is secure

  • (4) Seal penetrations under sinks, escutcheons completely cover holes

  • (5) Fittings are tight, no leaks

Family Room

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) No surface marks or scuffs

Family Room (continued)

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

  • (8) Windows

  • 8(a) windows operable

  • 8(b) free of defects/damage

  • 8(c) caulked & cleaned with no pencil marks

  • (9) Blinds level & free of defects/damage

Fireplace(s)

  • (1) Mantel & hearth

  • 1(a) surround installed properly

  • 1(b) clean & free of defects

  • (2) Gas logs operable, rocks & embers in place

Sunroom

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) no surface marks or scuffs

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

  • (8) Windows

  • 8(a) Windows operable

  • 8(b) Free of defects/damage

  • 8(c) Caulked & cleaned with no pencil marks

  • (9) Blinds level & free of defects/damage

Organizational Space

  • (1) Doors

  • 1(a) painted (six sides)

  • 1(b) free of damage

  • 1(c) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Drywall (more than 3 minor areas)

  • 5(a) meets Builder Standard

  • 5(b) returns at windows level/square/consistent reveal

  • (6) Paint meets Builder Standard (more than 3 touch up spots = 0 )

  • (7) Trim

  • 7(a) trim work level

  • 7(b) free of damage with no tool marks

  • 7(c) joints caulked

  • (8) Floors (more than 3 touch ups = 0 )

  • 8(a) are level

  • 8(b) clean with no blemishes/damage

  • 8(c) no squeaks

  • (9) Windows

  • 9(a) windows operable

  • 9(b) free of defects/damage

  • 9(c) caulked & cleaned with no pencil marks

  • (10) Blinds level & free of defects/damage

  • (11) Cabinets (more than 3 t/u = 0)

  • 11(a) free of damage

  • 11(b) doors/drawers aligned/adjusted

  • 11(c) operable w/door bumps

  • 11(d) all shelf supports in place

  • 11(e) cabinet 1/4 round installed

11(f) ALL nail holes filled

  • 11(g) ends are returned

  • 11(h) joints are caulked

  • (12) Counters clean, free of scratches, caulked

Powder Room

  • (1) Bathroom Doors

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

Powder Room (continued)

  • (5) Lights, mirrors, and faucets are aligned

  • (6) Drywall (more than 3 minor areas)

  • 6(a) meets Builder Standard

  • 6(b) returns at windows level/square/consistent reveal

  • (7) Paint meets Builder Standard (more than 3 touch up spots = 0 )

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Sink

  • 10(a) filled & drained

  • 10(b) caulked

  • 10(c) free of leaks & damage

  • (11) Faucets

  • 11(a) lift rods free of leaks & damage

  • 11(b) hot water on left

  • (12) Tissue holder, towel bar & rings straight & secure

  • (13) Mirrors installed, free of defects, & scratches

  • (14) Toilet level, caulked, operable, fill stopper working properly

  • (15) Exhaust fans function

  • (16) Fittings

  • 16(a) are tight with no leaks

  • 16(b) penetrations under sinks are sealed

  • 16(c) escutcheons completely cover holes

  • (17) Tile

  • 17(a) tile work has no voids

  • 17(b) excessive grout removed

  • (18) Cabinets (more than 3 t/u = 0)

  • 18(a) free of damage

  • 18(b) doors/drawers aligned/adjusted

  • 18(c) operable w/door bumps

  • 18(d) All shelf supports in place

  • 18(e) Cabinet 1/4 round installed

18(f) ALL nail holes filled

  • 18(g) ends are returned

  • 18(h) joints are caulked

  • (19) Windows

  • 19(a) Windows operable

  • 19(b) Free of defects/damage

  • 19(c) Caulked & cleaned with no pencil marks

  • (20) Blinds level & free of defects/damage

Garage Entry/ Mudroom

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint meets Builder Standard (more than 3 touch up spots = 0 )

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

  • (8) Windows

  • 8(a) Windows operable

  • 8(b) Free of defects/damage

  • 8(c) Caulked & cleaned with no pencil marks

  • (9) Blinds level & free of defects/damage

Garage

  • (1) Garage Door

  • 1(a) lock operable, deadbolt throws

  • 1(b) adjusted, weather stripping installed, no daylight visible

  • 1(c) painted (six sides)

  • 1(d) free of damage

  • 1(e) door bump installed

  • 1(f) threshold in good condition, clean & adjusted

  • (2) Overhead door

  • 2(a) door operable & free of damage

  • 2(b) prewires in proper locations

  • 2(c) opener installed if option chosen

  • 2(d) door jam covered with fiber cement

  • 2(e) door jam weather stripping installed (nailed at 12” max)

  • (3) Service door

  • 3(a) adjusted, lock operable

  • 3(b) painted (six sides)

  • 3(c) free of damage

  • 3(d) door bump installed

Water Heater & Electrical

  • (1) Electrical Panel labeled, SOS sticker on door

  • (2) Electric Main labeled

  • (3) Water heater

  • 3(a) operating

  • 3(b) level

  • 3(c) clean

Water Heater & Electrical (continued)

  • 3(d) set between 110 and 120

  • 3(e) vent block installed

  • 3(f) sealed to block

  • (4) PRV Drain line piped outdoors (except NC & Myrtle Beach)

Hallways

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Electrical plates straight & clean

  • (4) Drywall (more than 3 minor areas)

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) No surface marks or scuffs

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

  • (8) Windows

  • 8(a) windows operable

  • 8(b) free of defects/damage

  • 8(c) caulked & cleaned with no pencil marks

  • (9) Thermostat has been mounted properly & has power

  • (10) Blinds level & free of defects/damage

Coat & Linen Closets

  • (1) Door

  • 1(a) painted (six sides)

  • 1(b) free of damage

  • 1(c) door bump installed

  • (2) Drywall (more than 3 minor areas)

  • 2(a) meets Builder Standard

  • 2(b) returns at windows level/square/consistent reveal

  • (3) Paint meets Builder Standard (more than 3 touch up spots = 0 )

  • (4) Shelves straight & secure

Stairwell

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) located per plan

  • 1(b) complete & operable

  • (2) Light switches located & installed per plan

  • (3) Drywall (more than 3 minor areas)

  • 3(a) meets Builder Standard

  • 3(b) returns at windows level/square/consistent reveal

  • (4) Paint

  • 4(a) overall coverage, surface smooth, or thin

  • 4(b) clean lines at cut in, trim caulked, trim finish

  • 4(c) No surface marks or scuffs

  • (5) Trim

  • 5(a) trim work level

  • 5(b) free of damage with no tool marks

  • 5(c) joints caulked

  • (6) Stairs

  • 6(a) stairs are level

  • 6(b) clean with no blemishes/damage

  • 6(c) no squeaks

  • (7) Hardwoods on landing sanded smooth (more than 3 touch ups = 0 )

  • (8) Handrail secure, brackets installed with proper screws

  • (9) Post/pickets secure

  • (10) Nails aren't visible on sides of stair stringers

Laundry Room

  • (1) Door

  • 1(a) painted (six sides)

  • 1(b) free of damage

  • 1(c) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

(4) Drywall (more than 3 minor areas) +

  • 4(a) meets Builder Standard

  • 4(b) returns at windows level/square/consistent reveal

  • (5) Paint

  • 5(a) overall coverage, surface smooth, or thin

  • 5(b) clean lines at cut in, trim caulked, trim finish

  • 5(c) No surface marks or scuffs

  • (6) Trim

  • 6(a) trim work level

  • 6(b) free of damage with no tool marks

  • 6(c) joints caulked

  • (7) Floors (more than 3 touch ups = 0 )

  • 7(a) are level

  • 7(b) clean with no blemishes/damage

  • 7(c) no squeaks

Laundry Room (continued)

  • (8) Cabinets/shelves

  • 8(a) are secure, straight

  • 8(b) free of damage (more than 3 t/u=0)

  • (9) Windows

  • 9(a) Windows operable

  • 9(b) Free of defects/damage

  • 9(c) Caulked & cleaned with no pencil marks

  • (10) Blinds level & free of defects/damage

Master Bedroom

  • (1) Door

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Lights, mirrors, and faucets are aligned

  • (5) Electrical plates straight & clean

(6) Drywall (more than 3 minor areas) +

  • 6(a) meets Builder Standard

  • 6(b) returns at windows level/square/consistent reveal

  • (7) Paint

  • 7(a) overall coverage, surface smooth, or thin

  • 7(b) clean lines at cut in, trim caulked, trim finish

  • 7(c) No surface marks or scuffs

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Windows

  • 10(a) windows operable

  • 10(b) free of defects/damage

  • 10(c) caulked & cleaned with no pencil marks

  • (11) Blinds level & free of defects/damage

Master Bath & WIC

  • (1) Bath Door(s)

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump(s) installed

Master Bath & WIC (continued)

  • (2) Closet Door(s)

  • 2(a) painted (six sides)

  • 2(b) adjusted

  • 2(c) free of damage

  • 2(d) door bump(s) installed

  • (3) Light fixtures (any bulb missing or not working = 0 )

  • 3(a) located per plan

  • 3(b) complete & operable

  • (4) Light switches located & installed per plan

  • (5) Lights, mirrors, and faucets are aligned

  • (6) Electrical plates straight & clean

  • (7) Drywall (more than 3 minor areas)

  • 7(a) meets Builder Standard

  • 7(b) returns at windows level/square/consistent reveal

  • (8) Paint

  • 8(a) overall coverage, surface smooth, or thin

  • 8(b) clean lines at cut in, trim caulked, trim finish

  • 8(c) No surface marks or scuffs

  • (9) Trim

  • 9(a) trim work level

  • 9(b) free of damage with no tool marks

  • 9(c) joints caulked

  • (10) Floors (more than 3 touch ups = 0 )

  • 10(a) are level

  • 10(b) clean

  • 10(c) no blemishes/damage

  • 10(d) no squeaks

  • (11) Windows

  • 11(a) windows operable

  • 11(b) free of defects/damage

  • 11(c) caulked & cleaned with no pencil marks

  • (12) Blinds level & free of defects/damage

  • (13) Shelves

  • 13(a) are secure, straight

  • 13(b) free of damage (more than 3 t/u=0)

  • 13(c) Proper shelving / rod brackets installed

  • 13(d) all end caps installed on shelving / rods

  • (14) Closet is clean and void of extra flooring, tile, etc

  • (15) Sink filled, drained, caulked, free of leaks & damage

  • (16) Faucets & lift rods free of leaks & damage, hot water on left

  • (17) Tub (if any mark needs more than buffing=0)

  • 17(a) tub caulked

  • 17(b) free of damage

  • 17(c) filled & drained

  • 17(d) hot water on the left

  • (18) Shower (if any mark needs more than buffing=0)

  • 18(a) caulked per manufacturer's recommendations

  • 18(b) free of damage

Master Bath & WIC (continued)

  • 18(c) hot water on the left

  • 18(d) no leaks at caulk joints

  • 18(e) Tile work has no voids, excessive grout removed

  • (19) Glass shower

  • 19(a) enclosure functional

  • 19(b) door sweep installed

  • 19(c) bottom frame installed with weep holes (no debris)

  • (20) Tissue holder, towel bars & rings straight & secure

  • (21) Cabinets (more than 3 t/u = 0)

  • 21(a) free of damage

  • 21(b) doors/drawers aligned/adjusted

  • 21(c) operable w/door bumps

  • 21(d) All shelf supports in place

  • 21(e) Cabinet 1/4 round installed

21(f) ALL nail holes filled

  • 21(g) ends are returned

  • 21(h) joints are caulked

  • (22) Mirrors installed, free of defects, & scratches

  • (23) Toilet level, caulked, operable, fill stopper working properly

  • (24) Exhaust fans function

  • (25) Minimal flexing of tub & shower floors

  • (26) Fittings

  • 26(a) fittings are tight with no leaks

  • 26(b) penetrations under sinks are sealed

  • 26(c) escutcheons completely cover holes

  • (27) Blinds level & free of defects/damage

Bedroom 2

  • (1) Bedroom Door

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

(5) Drywall (more than 3 minor areas) +

  • 5(a) meets Builder Standard

  • 5(b) returns at windows level/square/consistent reveal

  • (6) Paint

  • 6(a) overall coverage, surface smooth, or thin

  • 6(b) clean lines at cut in, trim caulked, trim finish

  • 6(c) No surface marks or scuffs

  • (7) Trim

  • 7(a) trim work level

  • 7(b) free of damage with no tool marks

  • 7(c) joints caulked

Bedroom 2 (continued)

  • (8) Floors (more than 3 touch ups = 0 )

  • 8(a) are level

  • 8(b) clean with no blemishes/damage

  • 8(c) no squeaks

  • (9) Windows

  • 9(a) windows operable

  • 9(b) free of defects/damage

  • 9(c) caulked & cleaned with no pencil marks

  • (10) Closet Door

  • 10(a) painted (six sides)

  • 10(b) adjusted

  • 10(c) free of damage

  • 10(d) door bumps installed

  • (11) Shelves are secure, straight, and free of damage

  • (12) Closet is clean and void of extra flooring, tile, etc

  • (13) Blinds level & free of defects/damage

Bedroom 3

  • (1) Bedroom Door

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Drywall (more than 3 minor areas)

  • 5(a) meets Builder Standard

  • 5(b) returns at windows level/square/consistent reveal

  • (6) Paint

  • 6(a) overall coverage, surface smooth, or thin

  • 6(b) clean lines at cut in, trim caulked, trim finish

  • 6(c) No surface marks or scuffs

  • (7) Trim

  • 7(a) trim work level

  • 7(b) free of damage with no tool marks

  • 7(c) joints caulked

  • (8) Floors (more than 3 touch ups = 0 )

  • 8(a) are level

  • 8(b) clean with no blemishes/damage

  • 8(c) no squeaks

  • (9) Windows

  • 9(a) windows operable

  • 9(b) free of defects/damage

  • 9(c) caulked & cleaned with no pencil marks

Bedroom 3 (continued)

  • (10) Closet Door

  • 10(a) painted (six sides)

  • 10(b) adjusted

  • 10(c) free of damage

  • 10(d) door bump installed

  • (11) Shelves are secure, straight, and free of damage

  • (12) Closet is clean and void of extra flooring, tile, etc

  • (13) Blinds level & free of defects/damage

Bedroom 4

  • (1) Bedroom Door

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Drywall (more than 3 minor areas)

  • 5(a) meets Builder Standard

  • 5(b) returns at windows level/square/consistent reveal

  • (6) Paint

  • 6(a) overall coverage, surface smooth, or thin

  • 6(b) clean lines at cut in, trim caulked, trim finish

  • 6(c) No surface marks or scuffs

  • (7) Trim

  • 7(a) trim work level

  • 7(b) free of damage with no tool marks

  • 7(c) joints caulked

  • (8) Floors (more than 3 touch ups = 0 )

  • 8(a) are level

  • 8(b) clean with no blemishes/damage

  • 8(c) no squeaks

  • (9) Windows

  • 9(a) windows operable

  • 9(b) free of defects/damage

  • 9(c) caulked & cleaned with no pencil marks

  • (10) Closet Door

  • 10(a) painted (six sides)

  • 10(b) adjusted

  • 10(c) free of damage

  • 10(d) door bump installed

  • (11) Shelves are secure, straight, and free of damage

  • (12) Closet is clean and void of extra flooring, tile, etc

  • (13) Blinds level & free of defects/damage

Bedroom 5

  • (1) Bedroom Door

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Drywall (more than 3 minor areas)

  • 5(a) meets Builder Standard

  • 5(b) returns at windows level/square/consistent reveal

  • (6) Paint

  • 6(a) overall coverage, surface smooth, or thin

  • 6(b) clean lines at cut in, trim caulked, trim finish

  • 6(c) No surface marks or scuffs

  • (7) Trim

  • 7(a) trim work level

  • 7(b) free of damage with no tool marks

  • 7(c) joints caulked

  • (8) Floors (more than 3 touch ups = 0 )

  • 8(a) are level

  • 8(b) clean with no blemishes/damage

  • 8(c) no squeaks

  • (9) Windows

  • 9(a) windows operable

  • 9(b) free of defects/damage

  • 9(c) caulked & cleaned with no pencil marks

  • (10) Closet Door

  • 10(a) painted (six sides)

  • 10(b) adjusted

  • 10(c) free of damage

  • 10(d) door bump installed

  • (11) Shelves are secure, straight, and free of damage

  • (12) Closet is clean and void of extra flooring, tile, etc

  • (13) Blinds level & free of defects/damage

Bathroom 2

  • (1) Bathroom Doors

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

Bathroom 2 (continued)

  • (5) Lights, mirrors, and faucets are aligned

  • (6) Drywall (more than 3 minor areas)

  • 6(a) meets Builder Standard

  • 6(b) returns at windows level/square/consistent reveal

  • (7) Paint

  • 7(a) overall coverage, surface smooth, or thin

  • 7(b) clean lines at cut in, trim caulked, trim finish

  • 7(c) No surface marks or scuffs

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Sink

  • 10(a) filled & drained

  • 10(b) caulked

  • 10(c) free of leaks & damage

  • (11) Faucets

  • 11(a) lift rods free of leaks & damage

  • 11(b) hot water on left

  • (12) Tub (if any mark needs more than buffing=0)

  • 12(a) tub caulked

  • 12(b) free of damage

  • 12(c) filled & drained

  • 12(d) hot water on the left

  • (13) Tissue holder, towel bar & rings straight & secure

  • (14) Mirrors installed, free of defects, & scratches

  • (15) Toilet level, caulked, operable, fill stopper working properly

  • (16) Exhaust fans function

  • (17) Fittings

  • 17(a) are tight with no leaks

  • 17(b) penetrations under sinks are sealed

  • 17(c) escutcheons completely cover holes

  • (18) Tile

  • 18(a) tile work has no voids

  • 18(b) excessive grout removed

  • (19) Cabinets (more than 3 t/u = 0)

  • 19(a) free of damage

  • 19(b) doors/drawers aligned/adjusted

  • 19(c) operable w/door bumps

  • 19(d) All shelf supports in place

  • 19(e) Cabinet 1/4 round installed

19(f) ALL nail holes filled

  • 19(g) ends are returned

  • 19(h) joints are caulked

Bathroom 2 (continued)

  • (20) Windows

  • 20(a) windows operable

  • 20(b) free of defects/damage

  • 20(c) caulked & cleaned with no pencil marks

  • (21) Blinds level & free of defects/damage

Bathroom 3

  • (1) Bathroom Doors

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Lights, mirrors, and faucets are aligned

  • (6) Drywall (more than 3 minor areas)

  • 6(a) meets Builder Standard

  • 6(b) returns at windows level/square/consistent reveal

  • (7) Paint

  • 7(a) overall coverage, surface smooth, or thin

  • 7(b) clean lines at cut in, trim caulked, trim finish

  • 7(c) No surface marks or scuffs

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Sink

  • 10(a) filled & drained

  • 10(b) caulked

  • 10(c) free of leaks & damage

  • (11) Faucets

  • 11(a) lift rods free of leaks & damage

  • 11(b) hot water on left

  • (12) Tub (if any mark needs more than buffing=0)

  • 12(a) tub caulked

  • 12(b) free of damage

  • 12(c) filled & drained

  • 12(d) hot water on the left

  • (13) Tissue holder, towel bar & rings straight & secure

  • (14) Mirrors installed, free of defects, & scratches

  • (15) Toilet level, caulked, operable, fill stopper working properly

Bathroom 3 (continued)

  • (16) Exhaust fans function

  • (17) Fittings

  • 17(a) are tight with no leaks

  • 17(b) penetrations under sinks are sealed

  • 17(c) escutcheons completely cover holes

  • (18) Tile

  • 18(a) tile work has no voids

  • 18(b) excessive grout removed

  • (19) Cabinets (more than 3 t/u = 0)

  • 19(a) free of damage

  • 19(b) doors/drawers aligned/adjusted

  • 19(c) operable w/door bumps

  • 19(d) All shelf supports in place

  • 19(e) Cabinet 1/4 round installed

19(f) ALL nail holes filled

  • 19(g) ends are returned

  • 19(h) joints are caulked

  • (20) Windows

  • 20(a) Windows operable

  • 20(b) Free of defects/damage

  • 20(c) Caulked & cleaned with no pencil marks

  • (21) Blinds level & free of defects/damage

Bathroom 4

  • (1) Bathroom Doors

  • 1(a) painted (six sides)

  • 1(b) adjusted

  • 1(c) free of damage

  • 1(d) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Lights, mirrors, and faucets are aligned

  • (6) Drywall (more than 3 minor areas)

  • 6(a) meets Builder Standard

  • 6(b) returns at windows level/square/consistent reveal

  • (7) Paint

  • 7(a) overall coverage, surface smooth, or thin

  • 7(b) clean lines at cut in, trim caulked, trim finish

  • 7(c) No surface marks or scuffs

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

Bathroom 4 (continued)

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Sink

  • 10(a) filled & drained

  • 10(b) caulked

  • 10(c) free of leaks & damage

  • (11) Faucets

  • 11(a) lift rods free of leaks & damage

  • 11(b) hot water on left

  • (12) Tub (if any mark needs more than buffing=0)

  • 12(a) tub caulked

  • 12(b) free of damage

  • 12(c) filled & drained

  • 12(d) hot water on the left

  • (13) Tissue holder, towel bar & rings straight & secure

  • (14) Mirrors installed, free of defects, & scratches

  • (15) Toilet level, caulked, operable, fill stopper working properly

  • (16) Exhaust fans function

  • (17) Fittings

  • 17(a) are tight with no leaks

  • 17(b) penetrations under sinks are sealed

  • 17(c) escutcheons completely cover holes

  • (18) Tile

  • 18(a) tile work has no voids

  • 18(b) excessive grout removed

  • (19) Cabinets (more than 3 t/u = 0)

  • 19(a) free of damage

  • 19(b) doors/drawers aligned/adjusted

  • 19(c) operable w/door bumps

  • 19(d) all shelf supports in place

  • 19(e) cabinet 1/4 round installed

19(f) ALL nail holes filled

  • 19(g) ends are returned

  • 19(h) joints are caulked

  • (20) Windows

  • 20(a) windows operable

  • 20(b) free of defects/damage

  • 20(c) caulked & cleaned with no pencil marks

  • (21) Blinds level & free of defects/damage

Loft/Bonus Room

  • (1) Door

  • 1(a) painted (six sides)

  • 1(b) adjusted & free of damage

  • 1(c) door bump installed

  • (2) Light fixtures (any bulb missing or not working = 0 )

  • 2(a) located per plan

Loft/Bonus Room (continued)

  • 2(b) complete & operable

  • (3) Light switches located & installed per plan

  • (4) Electrical plates straight & clean

  • (5) Lights, mirrors, and faucets are aligned

  • (6) Drywall (more than 3 minor areas)

  • 6(a) meets Builder Standard

  • 6(b) returns at windows level/square/consistent reveal

  • (7) Paint

  • 7(a) overall coverage, surface smooth, or thin

  • 7(b) clean lines at cut in, trim caulked, trim finish

  • 7(c) No surface marks or scuffs

  • (8) Trim

  • 8(a) trim work level

  • 8(b) free of damage with no tool marks

  • 8(c) joints caulked

  • (9) Floors (more than 3 touch ups = 0 )

  • 9(a) are level

  • 9(b) clean with no blemishes/damage

  • 9(c) no squeaks

  • (10) Windows

  • 10(a) windows operable

  • 10(b) free of defects/damage

  • 10(c) caulked & cleaned with no pencil marks

  • (11) Closet Door

  • 11(a) painted (six sides)

  • 11(b) adjusted & free of damage

  • 11(c) door bump installed

  • (12) Shelves are secure, straight, and free of damage

  • (13) Closet is clean and void of extra flooring, tile, etc

  • (14) Blinds level & free of defects/damage

Attic

  • (1) Light fixtures (any bulb missing or not working = 0 )

  • 1(a) operable & accessible from attic entrance

  • (2) Pull down steps

  • 2(a) proper length, nailed properly

  • 2(b) free of defects

  • 2(c) insulated & weather stripped

  • (3) Air handler drain pan

  • 3(a) clean & free of debris

  • 3(b) shut off switch is installed

  • 3(c) overflow piped properly

  • (4) Blown insulation in place with no voids, depth gauge installed

  • (5) Ridge vent/soffit free of obstruction

  • (6) Wall access door insulated, weather stripped, and latches tightly

  • (7) No visible discoloration / mildew on framing members

  • (8) Attic clean & swept

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.