Information
-
Community and lot #
-
Conducted on
-
Prepared by
INSPECTIONS
HOME READY FOR QA PER SCHEDULE
-
Is home ready for QA , starts up done , water on ?
-
QA date
-
Final Orientation date
COMMUNITY APPEARANCE
-
Was overall appearance up to Mungo Homes standards? <br>Marketing?<br>Clean streets?
-
Add media
EXTERIOR PHOTO OF PROPERTY
-
Attach photo.
EXTERIOR ITEMS (FRONT - SIDES - REAR)
-
Water meter level, no defects?<br>
-
Concrete driveway, clean and no defects?
-
Concrete control joints installed<br>
-
Lead walk installed, clean , no defects
-
Gutters installed with no defects?
-
Shutters installed<br>
-
Yard graded - no signs of erosion issues
-
Seed/Sod installed - yard free of debris
-
Cleanouts exposed, cut to grade
-
A/C pad level and free of defects
-
A/C lines sealed
-
Condensation line exposed
-
Roof shingles clean, no defects
-
Vents installed and sealed
-
All visible flashing painted
-
Water heater vent installed with block ( secure and sealed )
-
Stoop and porches installed, clean no defects<br>
-
Patio/Step pad clean no defects
-
Siding straight, no defects
-
Soffit level no defects
-
Window frames free of paint or damages, no defects
-
Screens installed, free of defects
-
Foundation parged, full coverage, no defects
-
Gas lines installed
-
Pediments flashed and caulked
-
Gable vents free of defects
-
Garage header flashed
-
Columns painted, free of defects
-
Exterior trim caulked, all painting complete, no defects, all nails and screws puttied
-
Handrails secured, no defects
-
All exposed nails removed
-
Exterior entry light installed and operational, no defects
-
Doorbell operational
-
Entry door handle and deadbolt latch proper function, clean and adjusted , no missing screws in hinges
-
Entry door painted 6 sides
-
Entry deadbolt latch proper function, clean and adjusted
-
Weather-strip, tight, clean, installed
-
Toe kick installed, painted, no defects
-
Threshold clean, no defects
BRICK/STONE
-
Veneer clean, no excess mortar
-
Weep holes open
-
Lintels, angle iron primed, painted, no bleed through
-
Step flashing installed and sealed
-
All caulking clean bead, painted and in place
SCREEN PORCH
-
Screening complete, no tears
-
All caulking clean bead, painted and in place
-
Screen door operable
-
Screen porch sealed to house
DECK AREA
-
Deck boards installed and cleaned, no stamps or tags
-
No chips or voids in the handrails
-
All pickets straight
-
All pickets free of defects
-
All nails/screws properly set
CRAWL AREA
-
Crawl space clean fee of debris, smooth
-
Positive drain checked
-
Vapor barrier installed no rips or tears
-
Crawl space door installed, painted and latched
-
Foundation vents installed
-
Foundation vents properly sealed, clear of any mortar and functional
GARAGE AREA
-
Electric panel and breakers labeled , SOS sticker
-
Water heater vented
-
Water heater installed, platform clean/working
-
Drywall clean, no footprints or writing
-
Drywall gaps filled
-
Overhead door installed and operational
-
Opener installed & plugged in or pre-wire trim
-
Garage door remotes
-
Floor clean, pressure washed/ no defects
-
Control joints installed in slab
-
Deadbolt assembly installed and functional no missing screws on hinges
-
Fire door to home installed and functional , painted 6 sides
-
Door knob clean, no defects
-
Side personnel door completed, operational, no defects
-
No nails, protruding to the interior
-
Garage door w/ glass clean, no defects
UTILITY/LAUNDRY ROOM 1ST FLOOR
-
Baseboard / Shoe installed / painted
-
Door stop installed
-
Doors operable, no defects, paint all sides
-
Drywall and paint t/u completed
-
Washer drain box installed correctly
-
Flooring clean, no defects, seam sealed/grouted, walls square
-
Shelving installed and level
-
Clean out cover installed
-
Light fixture installed, operable
-
A/C register straight, clear of debris, no defects
-
Dryer vent installed
FOYER
-
Drywall and paint touch up completed
-
Entry floor clean, complete, no defects, walls squared
-
Switch plate straight
-
Entry light installed, clean, operable, no defects
-
Window frame(s) and glass clean, no defects
-
Window locks operable, no defects
-
Entry closet completed, door operable, stop installed, no defects
-
Entry trim complete , no defects
-
Check for floor squeaks
PANTRY
-
Baseboard / casing completed, no defects
-
Drywall and paint touch up completed
-
Shoe moldings puttied, painted, no defects, walls square
-
Flooring installed, cleaned, seam sealed or grouted, no defects
-
Shelving installed, level, no defects
-
Light fixture installed, level, no defects
-
Door operable, no defects, all sides painted
-
Door knob clean, no defects
-
Door stop installed
FIREPLACE
-
Switch installed and functioning properly
-
Manual and start up package left for homeowner
-
Gas logs installed and operable
-
Mantel and moldings painted, no defects
-
Surround installed, clean, no defects
-
Face / Grill clean, no defects or dents
DINING ROOM - LIVING ROOM - STUDY
-
Drywall and paint touch up completed
-
Carpet clean / vacuumed
-
Floors clean, no defects, splits, chips, scratches
-
Switch plates / outlets straight, no defects or gaps
-
A/C vents level, clear of debris, operable
-
Window frames and glass clean, no defects
-
Windows and locks operable, no defects
-
Baseboards / casing secure, no defects, walls square
-
Door handles installed, clean, no defects
-
Light fixtures installed, operable, clean, no defects
-
Check for floor squeaks
-
Shoe molding installed, no defects
KITCHEN / NOOK
-
Drywall and paint touch up completed
-
Hardwoods / LVP clean, no defects, splits, chips, scratches
-
Tile / Vinyl - clean, seams sealed or grouted, no defects, walls square
-
Baseboards / casing secure, no defects, walls square
-
Light fixtures installed, operable, clean, no defects
-
Switch plates / outlets straight, no defects or gaps
-
Island receptacles installed , GFCI stickers
-
Window frames and glass clean, no defects
-
Windows and locks operable, no defects
-
Door handles installed, clean, no defects
-
Check for floor squeaks
-
Countertops secured to wall, caulked, no defects
-
Island countertop installed, puttied, no defects
-
Cabinets trimmed, no defects, operable, shelves installed, supported, door bumpers installed
-
Cabinets clean
-
Toe kicks and shoe molding installed, puttied, no defects
-
Appliances installed, cleaned, set up, hooked up, operable, no scratches, dents or defects
-
Anti-tip device installed
-
Sink clean, no dents, no defects
-
Sink faucet operable, Hot and Cold correctly set up
-
Disposal installed and separate switch, operable, no defects, labeled
-
GFCI installed and labeled
-
Light fixtures installed, operable, clean, no defects
-
Backdoor handle set installed, clean, no defects, buttons installed in glass, door painted all sides
-
Backdoor weatherstrip installed, clean, no defects , no missing screws on hinges
-
Backdoor toe, kick installed, painted, no defects
-
Check for floor squeaks
BATHROOM - HALL FIRST
-
Drywall and paint touch up completed
-
Floors clean, no defects, splits, chips, or scratches
-
Baseboard/casing completed, no defects
-
Door knobs clean, no defects
-
Door stops installed
-
Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed
-
Bath accessories installed, level and secured, no defects
-
Pedestal sink, clean, no defects
-
Vanity faucet operable, no defect or leaks
-
Mirror clean, level, no scratches or defects
-
All scussion plates installed
-
Surrounds installed, no defects
-
Shower enclosure square, Shower door, operable, no leaks, no defects
-
Tub/Shower complete, buffed, no defects or chips
-
Tub/Shower drains are clear and operable
-
Tub overflow operable
-
Toilet flushes, no defects, operable, shut off operable
-
Light fixtures/Exhaust fan operable, no defects
-
GFI installed
-
Check switches for correct order
HALLWAY
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Carpet cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Thermostat installed, clean, level, no defects
-
Return air filters installed
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
STAIRS
-
Drywall and paint touch up completed
-
Pickets installed at handrails, no stringer defects, no exposed nails
-
Check for floor squeaks
-
Handrails installed, puttied, returns installed at stringer, correct color hardware?
-
Knee wall secure
2ND STORY HALLWAY
-
Drywall and paint touch up completed
-
Check for floor squeaks
PRIMARY BEDROOM
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Carpet cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Return air filters installed
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
BATHROOM-PRIMARY
-
Drywall and paint touch up completed
-
Floor clean, no defects, splits, chips, scratches
-
Baseboard/casing completed, no defects
-
Door knobs clean, no defects
-
Door stops installed
-
Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed
-
Bath accessories installed, level and secured, no defects
-
Vanity faucet operable, no defect or leaks
-
Mirror clean, level, no scratches or defects
-
All scussion plates installed
-
Surrounds installed, no defects
-
Shower enclosure square, Shower door, operable, no leaks, no defects
-
Tub/Shower complete, buffed, no defects or chips
-
Tub/Shower drains are clear and operable
-
Tub overflow operable
-
Toilet flushes, no defects, operable, shut off operable
-
Light fixtures/Exhaust fan operable, no defects
-
GFI installed
-
Check switches for correct order
UTILITY/LAUNDRY ROOM 2ND FLOOR
-
Drywall and paint t/u completed
-
Baseboard / Shoe installed / painted
-
Doors operable, no defects, paint all sides
-
Door stop installed
-
Washer drain box installed correctly
-
Flooring clean, no defects, seam sealed/grouted, walls square
-
Shelving installed and level
-
Clean out cover installed
-
Light fixture installed, operable
-
A/C register straight, clear of debris, no defects
-
Dryer vent installed
BONUS
-
Description of the location of this room.
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Carpet cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Return air filters installed
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
SECONDARY BEDROOMS (#1)
-
Description of the location of this room.
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Flooring cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
SECONDARY BEDROOMS (#2)
-
Description of the location of this room.
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Flooring cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
SECONDARY BEDROOMS (#3)
-
Description of the location of this room.
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Flooring cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
SECONDARY BEDROOMS (#4)
-
Description of the location of this room.
-
Smoke detectors operational
-
Drywall and paint touch up completed
-
Baseboards/casing completed, no defects
-
Door stops installed
-
Interior doors clean, no defects, operable
-
Door knobs clean, no defects
-
Window frame and glass screen
-
Windows and locks operable
-
Closet door operable
-
Closet interior complete
-
Closet shelving, installed, level, no defects
-
Flooring cleaned, vacuumed
-
Carpet seams tight
-
Carpet tacked down in all areas
-
Switches and outlet plate straight
-
A/C vents straight, no defects
-
Check for floor squeaks
-
Light fixtures installed, operable, no defects
BATHROOMS - HALL SECOND
-
Drywall and paint touch up completed
-
Floor clean, no defects, splits, chips, scratches
-
Baseboard/casing completed, no defects
-
Door knobs clean, no defects
-
Door stops installed
-
Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed
-
Bath accessories installed, level and secured, no defects
-
Vanity faucet operable, no defect or leaks
-
Mirror clean, level, no scratches or defects
-
All scussion plates installed
-
Surrounds installed, no defects
-
Shower enclosure square, Shower door, operable, no leaks, no defects
-
Tub/Shower complete, buffed, no defects or chips
-
Tub/Shower drains are clear and operable
-
Tub overflow operable
-
Toilet flushes, no defects, operable, shut off operable
-
Light fixtures/Exhaust fan operable, no defects
-
GFI installed
-
Check switches for correct order
ATTIC / STORAGE ROOM
-
Clean
-
Free of any defects.
-
Float switch connected
BASEMENT
-
Free of any defects./ notes for all bathrooms and bedrooms
MISC.
-
Chris Spence contacted if items will not be ready for QA
-
Items that will not be completed for QA and Reason
-
Paint touch up kit on site
-
All warranties and manuals left in kitchen drawer
-
Water main shut-of located