Information
-
Job Number
-
Job Type
-
Tech Code
-
Location
-
Conducted on
-
Prepared by
-
Location
-
Engineers signature
-
Completed by
Customer Service
-
1. Did the customer receive an agreed ETA
-
2. First impressions, Uniform / ID and vehicle
-
3. Did the engineer walk the customer through the install
-
4. Did the customer receive a demonstration
-
5. Was the customer left with full viewing
Homesafe
-
1. Did the engineer complete a full risk assessment
-
2. Was there evidence of working at height equipment used at the appropriate time
-
3. Was the installation of the dish / cabling installed taking consideration of the future
-
4. Was the customer aware of the emergency card for lone working
-
5. Was the site free of potential hazards following our visit
Process's and Procedures
-
1. Did the engineer use his device in real time
-
2. Did the engineer allocate the correct stock in line with the job type
-
3. Was the device used correctly to activate the viewing
-
4. Was the customers signature captured on job completion
-
5. Did the engineer take pictures when prompted at the appropriate times
Quality
-
1. Is the dish installed using the correct fixings and in the optimum position
-
2. Cable runs internal and external neat, tidy and secured correctly
-
3. All holes sealed using silicone / wall plates and grommets with no brick dust evident
-
4. Any visible damage caused during the visit
-
5. Do you feel that the engineer, treated your property appropriately
Photo evidence
-
Picture 1
-
Picture 2
-
Picture 3
-
Picture 4