Title Page
-
Conducted on
-
Enter Work Order Number
-
Prepared by
-
Location
General
-
Enter description of procedure, task or worksite being assessed
Hazards, Risks and Controls
-
Click Add Hazard (+) after you have observed and identified a task and associated hazard
Hazard
Hazard
-
Activity
-
Description of hazards identified
-
Photo of hazard (optional)
-
Persons at risk
Initial risk rating
-
Initial consequence
-
Initial likelihood
-
Initial risk rating
Controls
-
Select control measures
- Elimination
- Substitution
- Engineering Controls
- Administrative Controls
- PPE
- Other
-
Enter other control measures
-
Enter description of control measures
Residual risk rating
-
Residual consequence
-
Residual likelihood
-
Residual risk rating
References
-
Risk Matrix Reference
-
Risk Assessment Process ( Includes Hierarchy of Control )
-
Risk Assessment Procedure
Completion
-
Recommendations
-
Signature