Title Page

  • Pub Code

  • Pub Name

  • Conducted on

BOH Installation

  • Check box if there is a PC to be installed on site

  • PC and monitor installed

  • Printer installed and set to default printer on PC

  • Router (and switch if needed) installed

  • Is the router online?

  • Attach images of the PC and equipment installed in the back office

  • Additional notes if necessary

FOH Installation

  • How many tills does site have?

  • Till Checks - Add tills as necessary

  • Till
  • Till and Cash Drawer installed

  • Till turns on and touch screen is responsive to touch

  • EPOS software loads correctly

  • Cash drawer fires

  • PDQ loads correctly

  • Receipt printer working

  • Take a picture of a print out from the receipt printer

  • Cables are tied and neat

  • Please attach a photo of the till once installed in its location

  • If a kitchen printer is required, tick if installed and printing correctly.

  • Please attach an image of the kitchen printer once installed

  • Additional notes if necessary

Sign Off

  • Please sign off the installation work that has been completed today.

  • Engineer Signature

  • Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.