Title Page

  • Site

  • Site Diary Ref No:

  • NR ASPRO Representative

  • Network Rail ASPRO construction manager

  • NR APSIM

  • Project/ Remit Number:

  • Outside Party or Third Party Site Representative

  • Date and Time of site Attendance

  • Location
  • What3Words location

  • Weather Conditions:

  • ELR / Mileage

  • Brief Description of Works:

  • Plant & Equipment in Use:

  • TBS / WPP or Method statement Ref:

Track access arrangements and details

  • Track Access details and timings

  • WON Item No

  • Access Type

  • Stand Alone or Signing in with others

  • Time Access planned to be taken

  • Time Access Actually Taken

  • Time Signed in With E/S or PC

  • Reason for any Delay to access being taken

  • Time Access Planned to be Cancelled

  • Time Signed out with E/S or PC

  • Time Access Actually Cancelled

  • Reason for any Early Cancellation (for Example Signaller asked for earlier handback PC and or E/S asked for early handback, Client Finished early etc.)

Isolation Details and Timings

  • Isolation Required

  • Type of Isolation

  • Isolation Supplied by

  • Time Isolation Taken

  • Time Form C (Permit to Work Issued by Nom) and any reason for delay

  • Any reason for any delay to taking of Isolation

  • Time Isolation requested to be Cancelled by nominated Person

  • Time Form C (Permit to Work Cancelled) and any reason for early return

  • Time Isolation Cancelled

Site Report Details

Hourly Reporting Entry

  • Observation 1

  • Observation 2

  • Observation 3

  • Observation 4

  • Observation 5

  • Observation 6

  • Observation 7

  • Observation 8

  • Observation 9

  • Observation 10

  • Observation 11

  • Observation 12

  • Additional Observations 13-30 if required

  • Observation 13

  • Observation 14

  • Observation 15

  • Observation 16

  • Observation 17

  • Observation 18

  • Observation 19

  • Observation 20

  • Observation 21

  • Observation 22

  • Observation 23

  • Observation 24

  • Observation 25

  • Observation 26

  • Observation 27

  • Observation 28

  • Observation 29

  • Observation 30

  • Additional Observations List Below

  • PGI carried out

  • 1. General Documentation

  • 1.2 Accident records available and on site

  • 1.3 Construction H & S Plan approved & on site

  • 1.4 Work Package Plan/Task Briefing/Method Statements (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)

  • 1.5 Risk Assessments (PPE, COSHH)

  • 1.6 Access Permits

  • 1.7 F10 Form, HASAWA Notice, H&S Policy, First Aid

  • 1.8 Contractors Safety Inspections

  • 1.9 Statutory Inspections (Lifting equipment, scaffolding etc.)

  • 1.10 Briefing Records (Site Induction, Tool Box Talks)

  • 1.11 Insurance Certificate displayed & in date

  • 1.12 Lifting Equipment

  • 1.13 Plant Operators competency certs (CSCS)

  • 2. Construction Safety

  • 2.1 Scaffold, Access Equip, Ladders

  • 2.2 Protection from falling materials

  • 2.3 Working at Height

  • 2.4 Excavations, Services

  • 2.5 Cat & Genny

  • 2.6 Manual Handling

  • 2.7 Plant & Equipment including cranes

  • 2.8 Site vehicles

  • 2.9 Traffic Management

  • 2.10 Health Hazards

  • 2.11 Permits to Work

  • 2.12 Other (from H&S Plan/WPP/Method Statement) (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)

  • 3. General - Sites / Offices

  • 3.1 Welfare-Toilets/washing/drying facilities

  • 3.2 Emergency arrangements (displayed)

  • 3.3 Fire (extinguishers, arrangements tested, displayed)

  • 3.4 Housekeeping/ Tidiness

  • 3.5 Lighting/Heating/ Working Environment

  • 3.6 Access & Boundaries

  • 3.7 Security, Construction Safety Signage

  • 3.8 First Aiders Identified and First Aid Equipment in Place

  • 3.9 Storage of fuel/detonators/Flammables

  • 3.10 General storage

  • 3.11 Work activities as per WPP/TBS/MS (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)

  • 4. Contractors Staff

  • 4.1 Awareness Safety/WPP/TBS/ Method Statement Brief (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)

  • 4.2 Hazard Awareness

  • 4.3 Compliance with Risk Assessment

  • 4.4 Correct Manual Handling Activities

  • 4.5 I.D / Access Permits

  • 4.6 Wearing of and condition of PPE

  • 4.7 Management of sub-contractors

  • 5. Railway & Public Safety

  • 5.1 No issues to Public Safety

  • 5.2 Infrastructure fully protected

  • 5.3 Access gates and arrangements for Walking to Site

  • 5.4 Other (from H&S Plan/WPP/Method Statement) (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)

  • 6. Track Access including Isolations

  • 6.1 Safe Work Pack issued Correct and fit for purpose and signed by all parties

  • 6.2 Correct type and no of Safety Critical Staff in place and all Certification correct and in date

  • 6.4 COSS Briefing undertaken / understood

  • 6.5 Communication Arrangements suitable and tested

  • 6.6 WON Details and Track Diagrams supplied and correct

  • 6.7 Possession Pack issued and correct if required

  • 6.8 AC or DC Arrangements in place limits briefed and RoLE in place as required

  • 6.9 Test before touch Carried out

  • 6.10 Fenced Protection (Fencing adequate and suitable for location and Line Speed

  • 6.11 Separated Protection distance from Nearest Running Line suitable and Site Wardens appointed as Required

  • 7. Environment

  • 7.1 Environmental Plan & Policy displayed

  • 7.2 Waste management arrangements incLicensing

  • 7.3 Noise and vibration (assessments, Section 61 notices)

  • 7.4 Fumes, Dust

  • 7.5 Water Pollution

  • 7.6 Pests (Wasps, Rats, etc.)

  • 7.7 Graffiti/Vandalism

  • 7.8 Litter /fly tipping

  • 7.9 Spillages/Spill Kits on site

  • 7.10 Vegetation Issues

  • 7.11 Awareness of Protected Species and SSSIs

  • End of Shift Text Message sent

  • Time and date end of shift / clear of site

  • General Impression of Site

Additional Site Photos

  • Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.