Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Set Up
-
Statutory notices displayed
-
Site signage displayed
-
Gates kept closed
-
Designated, secure and safe material storage area
General
-
All personnel trained to carry out the works
-
All personnel inducted, signed onto method statement
Welfare
-
Toilets, wash basin with warm water, soap & towels
-
Drinking water, accommodation for making warm drinks and preparing food provided & clean
-
Facilities for drying clothing available
-
Adequate First Aid facilities &trained First Aider on site
Access Ways
-
Roads, gangways, stairs & scaffolds properly lit
-
Obstruction free,openings properly guarded
-
Where possible, pedestrian/plant segregation
Ladders
-
Good condition, properly angled
-
Firm, level,unobstructed base
-
Secured, adequate hand- hold at landing place
Scaffolds/Towers/Podiums/Hop-Ups
-
Erected/altered by a competent person
-
Working platforms clear of debris and hazards
-
Toe boards, guard rails and brick guards fitted
-
Not overloaded/loads evenly distributed
-
Inspected as required, results recorded
-
Signage available for incomplete scaffolds/towers/podiums and hop ups
Work at height
-
Edge fall protection in place to protect personnel
-
Areas below cordoned off with signage displayed
-
Holes/openings a covered with suitable and fit for purpose material/ medium
-
Materials/ tools secure and kept to a minimum
Excavations
-
Position of all services identified and marked
-
Sides supported, battered or stepped
-
Edge protection in place
-
Spoil stacked at least depth of excavation away
Plant
-
Maintained in good repair with inspections recorded
-
Operated safely, beacons on, properly loaded and operators certified/ licences available
-
PAT testing up to date
Electricity
-
Apparatus, cables,transformers & connections all sound
-
Overhead electric lines or underground cables identified and specified controls in place i.e. goal posts in place
-
All tools used on site are 110volt or battery operated.
Manual Handling
-
Manual handling replaced with mechanical aids where possible e.g. Pallet trucks
-
Loads handled and listed correctly, gloves used.
-
Can all heavy materials/tools that have to be manually handled be done so safely
PPE
-
Required PPE being worn & adequate stock on site
-
Are Neville Tucker Operatives following NTH glove policy
-
Is the correct branded PPE being worn by all
Fire
-
Suitable fire extinguishers available
-
Procedure for evacuation established
-
Precautions taken for storing flammable substances
-
Combustible materials cleared
-
Fires/heaters checked at he end of each working day
-
Hot works permits in place as required
Noise/Vibration
-
Ear protection supplied and worn where required
-
Noise processes eliminated/reduced/minimalised.
-
Plant vibration exposure levels known and recorded
Environmental
-
Hazardous substances stored correctly with spill kits
-
Emissions kept to a minimum e.g. Dust, noise
-
Waste materials controlled - skips available
Housekeeping
-
Are all areas kept clean and free from obstruction created by poor housekeeping
-
Are trailing leads kept to a minimum and sited at high level where possible
-
Are localised waste bins/skips available
MEWPS
-
MEWPS do they have correct test certificate
-
Operators fully trained
-
Harnesses checked and recorded before use
-
Exclusion zone established and monitored
Comments/issues to action
-
Action by /date
-
Add signature