Information
-
Gym location
-
Gym number
-
Conducted on
-
Prepared by
Gym areas
Gym floor
-
Gym running off WIFI not 3G
-
Access doors working
-
Fire alarm tested and sending signal to kings (detail if stand alone or linked)
-
Defib in cabinet on wall and has security tag in place
-
Fire extinguishers in place and labelled up
-
Fire exit directional signage present
-
Vending machines stocked, correct planogram, correct price and card readers working
-
Signage up and in correct positions
-
Call points tested and working
-
Panic alarms tested and working
-
Digi door locks all set to specific codes
-
Lifts working and connect to kings (detail PG or landlords responsibility)
-
All mag locks set and working
-
Evac chair in place if applicable
-
Isolation points tagged (gas, water, electricity)
-
Plant room free from combustibles
-
Gym is clean and tidy
Office
-
CIP, loss of comms with managers details on
-
Fire procedure - evac procedure, fire panel testing flow chart and procedure to include serial and PG number
-
Complaints procedure
-
Diamond procedure
-
Pure safety system all folders set up and complete with relevant sheets, to include certificates in compliance folder
-
CCTV working on loaded on managers PCs - managers shown how to use
-
All keys labelled up and in key cabinet <br>
-
Tannoy working - internal and external
Staff room
-
CIP, loss of comms with managers details on
-
Fire procedure - evac procedure, fire exit plan
-
First aid station in staff room and stocked
-
Health and safety poster up in staff room with contact details on<br>
-
Certificates on wall in staff room, blue fin, barbican - all in date <br>
-
Ellis Whittam - certificate in date
-
Gym floor checks, O&C, cleaning rota, matrix maintenance, accident/incident/theft, contractor sign in sheets all set up
-
Pagers working and set up
Cleaning cupboard
-
CIP, loss of comms with managers details on and loss of comms patrol sheet
-
Fire procedure - evac procedure
-
Emprise liability insurance certificate - in date
-
Daily check sheets and sign in book
Studio
-
Head mics working for studios
-
Class timetable displayed
PT assessment room
-
Fitness testing equipment set up
-
Health assessment posters on board
Sales and marketing
-
Current gym challenge and RAF
-
GM/AGM/PT profiles in position
Openings manager - non specific to RM/SGM
-
Fire exit plans sent to Kasumi and added to website?
-
Club added to contact list with CCTV team
-
Cleaners - has the GM requested the Gantner bands for the cleaners?
Other
-
Additional issue
issue
-
Issue
-
Assigned to
-
Photo of issue
Gym floor photos
-
Add media
Sign off
-
Regional Manager / SGM
-
New Openings Manager