Information
-
S/O number
-
Add location
-
Commit date
-
Prepared by: Gert Smit.
Civil Required
Consents Required
Health, Safety and Environmental Issues
-
Add labelled photos using the 'inote HD' apps
-
Underfloor access?
-
Ceiling access?
-
In front off house.
-
Gas detector required?
-
Dogs on site?
-
Right of way?
-
Multi dwelling unit?
-
Heritage site or Building?
Network
-
50mm drop off correctly installed? Yes
-
Water in chambers?
-
Tapes in place?
-
Tapes moving?
-
Tapes connected to correct FAT?
-
FAT location?
-
Cabinet location?
-
Distance from FAT (Fixed) or Cabinet (ABF) to boundary?
Internal information
-
WYAH materials?
-
Preferred location of ONT?
-
Preferred location of RGW?
Additional notes
-
Notes
Ultra-Fast Broadband Installation Consent
-
If you are not the person who ordered service (the customer), please confirm that you are authorised to represent the customer.
-
We will carry out the work in accordance with Chorus' End User Terms (available at www.chorus.co.nz/ufb-terms).
Outside property consent
-
Hole excavation and trenching?
-
Removal of concrete/tiling/pavement?
-
Installation of conduit(s)?
-
Removal of existing copper line to the house?
-
Others?
-
Clean up: We will leave the property in a clean and tidy state on competition. This does not include reinstatement to the same condition.
Inside property consent
-
Drilling small holes?
-
Cutting holes in walls?
-
Exposed surface wiring?
-
Removal of ceiling tiles?
-
Surface mounted installation and hardware?
-
Others?
Signed consent
-
I confirm that:
- I have seen, read and understood this information and the end user terms and accept those terms; and
- If I am not the owner of the property, I have obtained the consent of the owner for the installation works; and
- I understand that there may be an impact on the operation of burglar and medical alarms, particularly monitored alarms. [Note: check with your alarm provider or telecommunications service provider] -
End user signature:
-
Authorised Chorus technician: