Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Have trench inspections been carried out before work commences?
-
Has the trench been inspected within 5 hours of sunrise?
-
Are the trenches being inspected by a Rehabilitation Permit holder?
-
Is the trench being inspected from closest to where works are commencing?
-
Is adequate fauna handling equipment being carried during trench inspections?
-
Confirm no fauna spotter catcher is entering the trench to rescue fauna
-
Where required are "Hot Spot" inspections being conducted?
-
Is the fauna register being updated for trench interactions?
-
Have earth plugs been installed with slopes less than 45 degrees at 1km intervals?
-
Are there fauna shelters located at 500m intervals?
-
Between KP 609.5 and KP622, has hessian material been draped through the trench to allow Carpentarian antechinus to escape? (intervals 50m in rocky habitat and 100m in intervening habitat)
-
Are vehicle weed and seed certificates current?
-
Are hazardous materials being used and stored in accordance with SDS regulations?
-
Does the crew have a spillkit?
-
Is trench spoil being stored separately from topsoil?