General Site Management

Planning

  • Have all personnel on site attended an environmental induction? <br>

  • Have inductions been recorded in a site register?<br>

  • Are all personnel aware of, and have adhered to, the<br>CEMP?<br>

  • Is the CEMP kept in the site office and its whereabouts<br>known by all personnel?<br>

  • Are all personnel aware of the Cultural Heritage<br>Management Plan<br>

  • Have all personnel been inducted by a qualified<br>archaeologist or RAP?<br>

  • Have all culturally sensitive areas/items been<br>identified and appropriately protected?<br>

  • Have photo-monitoring points been established?<br>

Access

  • Has the project area and construction support zone<br>boundaries been delineated on all drawings to define<br>the extent of the authorised works area?<br>

  • Has the project area and construction support zone<br>boundaries been delineated in the field to define the<br>extent of the authorised works area?<br>

  • Has the project area and construction support zone<br>been appropriately protected to restrict uncontrolled<br>access?<br>

  • Has any above- and below-ground third-party<br>infrastructure been identified on line lists and in the<br>field?<br>

  • Are all construction personnel maintaining appropriate<br>hygiene practices to minimise the transfer of<br>weeds/diseases via clothing or equipment?<br>

  • Are temporary gateways being maintained in a stock<br>proof condition?<br>

  • Are property entry and exit gates kept closed to<br>prevent stock escaping?<br>

  • Is road, track and driveway access being maintained?<br>

Vehicle and Equipment Management

  • Were all vehicles and construct ion equipment cleaned by the contractor prior to arrival at the construction ROW?

  • Are vehicles being kept clean of excess mud etc?

  • Is a Log book or Vehicle Wash down Register available for vehicle washes?

  • Are all vehicles keeping to authorised access tracks?

  • Are all vehicles parking in designated parking areas?

  • Are vehicles adopting a safe speed limit within the ROW?

  • Are all vehicle and equipment movement s remaining within the designated ROW?

  • Are vehicles parked and/ or being kept away from remnant vegetation?

  • Are fire extinguishers available in vehicles?<br>

Air and Noise Management

  • Are fire extinguishers available in vehicles?

  • Is t he ROW being managed appropriately to minimise excessive dust generation? <br>

  • Are applicable noise regulations being followed (level, work hours etc)? <br>

  • "Have local resident s received adequate notice of<br>potential noise incursions prior to the commencement of activities?" <br>

  • "Is all construct ion equipment / vehicles well maintained so that there are no signs of leaks, excessive exhaust<br>fumes or noise et c?" <br>

Storage and Handling of Hazardous Materials

  • Are all storage areas and handling areas appropriately sealed and/ or bunded? <br>

  • Are appropriate hazardous material signs installed near<br>the storage area?<br>

  • Are all chemical and fuel containers securely covered? <br>

  • Is access to the hazardous material area clean? <br>

  • Is appropriate spill response and clean-up equipment<br>available on site?<br>

  • Are spill mats or containment kits at refuelling site?<br>

  • Is a register of MSDS readily available?<br>

  • Are all materials stored away from native vegetation<br>and scattered trees?<br>

  • Are all storage areas away from erodible surfaces or<br>areas where surface water runs?<br>

Spill & Incident Management

  • Is all land clean and showing no evidence of spills or<br>leakages from construction equipment?<br>

  • Is appropriate spill response equipment available on<br>site for all operations (including any refuelling<br>operations)?<br>

  • Is there an Incident log book?<br>

Waste Management

  • Is the site free of uncontrolled litter?<br>

  • Is the land adjacent to the ROW free from wastes that<br>may be attributed to construction?<br>

  • Are public roads adjacent or near to the ROW clear of<br>mud from construction works (i.e. no sign that mud is<br>being tracked onto roadways)?<br>

  • Are waste materials being stored temporarily on the<br>ROW away from native vegetation or other protected<br>areas?<br>

  • Are wastes being collected for appropriate disposal?<br>

  • Where applicable, has all appropriate documentation<br>been obtained for any waste identified for disposal<br>(e.g. EPA Waste Transport documentation)?<br>

Reporting and Compliance

  • Have daily inspections been documented by the<br>contractor and reported to APA?<br>

  • Have environmental audits been undertaken at key<br>milestone events?<br>

  • Have weekly inspection reports been electronically<br>forwarded to DEDJTR<br>

  • Have any non-conformance requests on environmental<br>issues identified during field audits been issued?<br>

  • Have any non-conformance requests on environmental<br>issues identified during field audits been issued?<br>

TEMPORARY GATEWAYS & FENCING

General

  • Have fences to be cut been marked by the surveyors?<br>

  • Have temporary strainer assemblies and gateways been<br>installed in accordance with the specification?<br>

  • Has temporary parallel fencing been installed in<br>agreement with the landowner’s requirements and in<br>accordance with the specification?<br>

CLEAR AND GRADE

Flora and Fauna

  • Have all relevant permits been obtained?<br>

  • Have all sensitive areas/items been identified and<br>appropriately protected?<br>

  • Have all scattered trees and Large Old Trees (LOTs)<br>identified for removal/retention been appropriately<br>marked prior to commencement of clear and grade<br>operations?<br>

  • Have Tree Protection Zones (TPZs) been established<br>where required and/or tree protection measures been<br>implemented in accordance with Arborist Report?<br>

  • Where limbs or canopies impede works, are they tied<br>back to avoid damage?<br>

Vegetation Clearance

  • Has vegetation clearance been restricted to the ROW?<br>

  • Have LOT’s to be cleared been inspected for fauna<br>prior to clearing?<br>

  • Has all vegetation clearance/trimming been limited to<br>vegetation identified for clearance/trimming?<br>

  • Is roadside vegetation clearing in accordance with<br>specifications?<br>

  • Is machinery and equipment free from excess soil and<br>plant material?<br>

  • Has cleared vegetation been stockpiled separately from<br>excavated trench material?<br>

  • Has excess vegetation been cleared from the<br>construction ROW?<br>

Weed and Disease Management

  • Are disease infected properties identified and have<br>appropriate measures implemented?<br>

  • Are personnel maintaining personal weed and disease<br>control hygiene practices (removing seeds and mud<br>from clothing and footwear)?<br>

  • Is weed material and weed contaminated material<br>being disposed of in a manner that does not increase<br>the risk of weed spread?<br>

  • Are designated wash down bays being used by vehicles?<br>

  • Have all clean downs or wash downs been recorded?<br>

  • Are all wash down bays being appropriately managed?<br>

Topsoil Stripping

  • Has topsoil been stripped in accordance with the<br>specification?<br>

  • Has topsoil been stripped and stored separately from<br>vegetation?<br>

  • Has any concrete or bitumen been broken up and<br>stockpiled separately?<br>

  • Has topsoil stripping been restricted to the ROW?<br>

  • Has striped topsoil stayed within property boundaries<br>(i.e. not graded across property boundaries)?<br>

  • Have gaps been left where land owners have requested<br>them?<br>

  • Have appropriate erosion and sediment controls been<br>installed around stockpiles?<br>

  • Are erosion and sediment control measures inspected<br>and maintained following rain events?<br>

  • Have stock and vehicle crossings been installed in the<br>stockpiled topsoil?<br>

  • If applicable, has any soil with unusual odours or<br>staining been assessed and managed appropriately?<br>

Cultural Heritage

  • In all culturally sensitive areas identified has the clear<br>and grade soil been fenced off with signage stating "Do<br>Not Enter"?<br>

  • Has geotextile been laid across the stripped area?<br>

  • Is the geotextile in good condition?<br>

  • Has crushed rock been laid down for the pathway of<br>vehicles and machinery?<br>

  • Is the crushed rock in good condition?<br>

  • Has the appropriate fenced off culturally significant<br>trench spoil been returned to the trench back from<br>where it came from?<br>

  • Has culturally significant topsoil been kept separate<br>from trench spoil and been placed back on the ROW<br>where it was originally located?<br>

TRENCHING & EXCAVATION WORKS

Trenching

  • Has trench spoil been excavated and stockpiled<br>separately from stockpiled topsoil where topsoil exists?<br>

  • Is both topsoil and subsoil stockpiled away from native<br>vegetation areas?<br>

  • Does the trench have the appropriate number of trench<br>plugs or ramps to minimise erosion and allow fauna<br>exit?<br>

  • Has the trench been inspected for fauna prior to<br>commencement of works each day?<br>

  • In the event that fauna has been found within pits, has<br>it been removed by a licensed wildlife handler and<br>relocated to suitable habitat in accordance with DELWP<br>protocols?<br>

  • Have all excavation works been restricted to the<br>worksite?<br>

  • Have stock and vehicle crossings been installed and do<br>they coincide with the gaps in the stockpiled topsoil?<br>

Dewatering

  • Has any dewatering of the trench been undertaken in<br>accordance with the requirements of the CEMP?<br>

  • Are there appropriate records of any water disposal?<br>

Soil and Erosion Management

  • Are stockpiles in the designated areas of the ROW?<br>

  • Have all stockpiles been placed so that they do not<br>impede drainage or flow lines?<br>

  • Is all surface and storm water drainage in the vicinity<br>of the ROW appropriately protected from potential<br>sediment input?<br>

  • Are erosion and sediment control measures inspected<br>and maintained on a regular basis for the duration of<br>construction?<br>

  • Is land adjacent to the ROW free of any signs of<br>sediment run off due to construction activities?<br>

Contaminated Soil and Acid Sulfate Soil

  • Does all subsoil appear to be free of signs of<br>contamination (staining, foreign material, odour etc)?<br>

  • Does all subsoil appear to be free of the typical<br>indicators of acid sulfate soil (odour, colour etc)?<br>

  • Does the ROW appear to be free of significant signs of<br>erosion?<br>

WATERCOURSE CROSSINGS

Site Management

  • Have all necessary approvals been obtained from the<br>asset manager prior to construction (permits, site<br>inspection by relevant authority)?<br>

  • Is the width of the construction ROW in accordance<br>with specifications?<br>

  • Have appropriate measures been put in place to ensure<br>the flow of the watercourse is maintained?<br>

  • Is all topsoil and spoil stockpiles stored at least 10m<br>away from the top of the channel?<br>

  • Where sedimentation of water courses may occur, have<br>erosion and sediment control measures been<br>implemented?<br>

  • Where required, have appropriate in-stream sediment<br>control structures been put in place?<br>

  • Is all equipment required for the crossing in good<br>working order, clean and being monitored for any<br>potential leaks?<br>

  • Are spill or containment kits available on site?<br>

  • Is all chemical or hazardous waste being stored and<br>handled in areas away from watercourses?<br>

  • Have all sensitive areas/items been identified and<br>appropriately protected?<br>

  • Are all refuelling operations and equipment<br>maintenance activities occurring at least 100m away<br>from the watercourse?<br>

Flora and Fauna

  • Have all relevant permits been obtained?<br>

  • Are all stockpiles near the crossing appropriately<br>protected with silt fences or containment berms?<br>

HORIZONTAL DIRECTIONAL DRILLING

Fluid Management

  • Is the HDD Management Plan being adhered to?<br>

  • Are potential frac out zones pegged, bunded or silt<br>fenced?<br>

  • Are earth bunds and drainage channels placed around<br>the upper edges of the drill site and work area, to<br>divert natural runoff around and away from the site so<br>that it doesn’t mix with drilling compound runoff?<br>

  • Are all facilities utilised in the surface mud handling<br>(mixing, cleaning & pumping) bunded?<br>

  • Is appropriate monitoring for potential frac-outs being<br>undertaken?<br>

  • Is a Volumetric Drilling Fluid Tracking Procedure in<br>operation to track fluid?<br>

  • Is appropriate spill response and clean-up equipment<br>available on site?<br>

PIPE STRINGING & WELDING

General

  • Has a permit valid for use during the declared Fire<br>Danger Period been obtained?<br><br>

  • Where required, has a permit valid for days of Total<br>Fire ban been obtained?<br>

  • Have appropriate gaps been left in the pipe string for<br>vehicle and wildlife movement?<br>

  • Do pipe strings have end-caps?<br>

  • Are appropriate fire mitigation measures in place to<br>protect any nearby remnant vegetation?<br>

  • Have appropriate fire mitigation measures been<br>employed (particularly during TFB days)?<br>

  • Are fire extinguishers available at welding sites?<br>

PIPE LAYING

Bedding & Padding Sand

  • For sand brought on site, has certification for weed and<br>pathogen free material been obtained?<br>

  • Has sand imported for use around the pipe been stored<br>in areas free of remnant vegetation?<br>

  • If sand is being stockpiled near watercourses, is it<br>appropriately protected with sediment fences?<br>

BACKFILLING

Site Management

  • For any fill material brought on-site for backfilling of<br>the trench, has a letter been obtained from the<br>supplier that the material is certified fill material?<br>

  • Has subsoil and topsoil been kept appropriately<br>separated during backfilling operations?<br>

  • Has subsoil and topsoil been returned to the trench in<br>the appropriate order during backfilling operations (i.e.<br>to avoid soil inversion)?<br>

  • Has appropriate compaction of backfill been<br>undertaken to minimise the potential for subsidence?<br>

  • Have contours been re-established following backfill<br>and compaction of the trench?<br>

  • Is the ground even without surface rocks or stone<br>aggregate exposed or sitting on the surface after<br>backfilling?<br>

  • Has surplus spoil material, bitumen and road base<br>material been removed from site and disposed in<br>accordance with regulatory requirements?<br>

PIPELINE HYDROTESTING & COMMISSIONING

General

  • Has all pigging waste (weld debris, dust and surface<br>scale) been collected and disposed of appropriately?<br>

  • Has all water for hydrostatic testing been sourced from<br>the approved source (town water supply or an<br>appropriate recycled source)?<br>

  • Is the hydro test water free of all environmentally<br>harmful chemical additives?<br>

  • Has appropriate notification been given to landholders<br>of the hydrostatic testing?<br>

  • Are applicable noise regulations being followed (level,<br>work hours etc)?<br>

  • Following completion of testing, has water used for<br>hydrostatic testing been disposed in accordance with<br>relevant regulatory requirements and approvals?<br>

  • Has comment and/or approvals on the discharge plan,<br>been sought from authorities and/or landowners prior<br>to disposal, been obtained?<br>

  • Have records of water sourcing, testing and disposal<br>been kept?<br>

CLEAN UP AND RESTORATION/REHABILITATION

Restoration

  • Have compacted areas been ripped prior to spreading<br>topsoil to relieve compaction?<br>

  • Has topsoil been kept separate from trench spoil and<br>been re spread over the cleared ROW?<br>

  • Have all the stripped areas requiring temporary or<br>permanent stabilisation been reinstated properly?<br>

  • Does the reinstated area conform to or blend into the<br>surrounding land?<br>

  • Have the banks of watercourses been restored to their<br>original profile in accordance with the EMP approved by<br>the asset manager?<br>

  • e drainage patterns been re-instated to their original condition?<br>

  • Have road reservations been reinstated in accordance<br>with the requirements of the appropriate authority<br>(Council, VicRoads)?<br>

  • Have all the temporary sediment control fences & traps<br>been removed and such areas been stabilised?<br>

  • Have disturbed areas been reinstated or rehabilitated<br>in accordance with the requirements of the land<br>owner/manager and in accordance with the<br>specification and CEMP?<br>

  • Have appropriate controls required to reduce the<br>occurrence and extent of soil erosion during the<br>rehabilitation phase been implemented?<br>

  • Has the construction ROW been re-planted or sown with<br>vegetation appropriate to the ongoing adjacent land<br>use?<br>

  • Is weed management undertaken by certified weed<br>control contractors?<br>

  • Are chemical sprays being kept away from<br>watercourses?<br>

  • Are chemical sprays being kept away from<br>watercourses?<br>

Other

  • Notes

  • Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.