Information
-
Customer and Site Name
-
Conducted on
-
Technician Name
-
Store Location.
PFC Inspection
-
PFCW Part Number
-
PFCW Serial Number
-
PRO Number
-
PFC Pictures, door closed & open, before and after.
-
Visual inspect, any overheating presence?
-
Has the new Fuse Bracket been successfully installed?
-
Images of Bracket Installed
-
Contactors Replaced? ( contactors need only to be replaced if they are heat damaged).
-
What are they?
-
Picture of replaced items.
-
Fuse base replaced? ( Fuse base, need only to be replaced if they are heat damaged).
-
What are they?
-
Pictures of replaced fuses.
-
Site inspection notes.
-
Inspection results satisfactory?
-
Name and signature of Site contact.