Information
-
Document No.
-
Store Name.
-
Conducted on
-
Technician Name
-
Store Location.
PFC Inspection
-
PFC Part Number/ Serial Number.
-
Reactor Cables<br><br>Check Tight (By Hand)<br>Check Crimps (Visual)<br><br>Satisfactory?
-
Torque Contactor Terminals<br><br>Setting 5nm - (set 12 on 12v drill/set 6 on 15.6v drill)<br><br>Completed?
-
Cables between Fuses + Contactors<br> - Random Crimp Inspection for adequate Copper in Lug<br><br>Satisfactory?
-
Check PFC Commissioned?<br><br>CT Ratio Set?
-
PFC Pictures, door closed & open.
-
Inspection results satisfactory?
-
Site inspection notes.
-
Name of Store Manager