Title Page
NIL-QA-ITR-065
-
Document Number :
-
Location
-
Site conducted
Block / PCU #
-
Combiner Box #
Test Equipment
-
Polarity Tester
-
Insulation Resistance Tester
-
Combiner Box - Exterior
Inspection Details
-
Please make sure that the correct row count in entered. If changed once report is started all row data will be lost and need to be re-entered, including photos.
-
PV Rows connected to Combiner Box :
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 7 Status
Row # 7 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 7 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 7 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 7 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 7 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 7 Status
Row # 7 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 7 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 7 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 7 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 7 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 8 Status
Row # 8 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 8 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 8 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 8 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 8 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 7 Status
Row # 7 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 7 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 7 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 7 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 7 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 8 Status
Row # 8 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 8 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 8 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 8 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 8 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 9 Status
Row # 9 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 9 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 9 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 9 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 9 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 7 Status
Row # 7 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 7 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 7 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 7 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 7 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 8 Status
Row # 8 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 8 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 8 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 8 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 8 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 9 Status
Row # 9 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 9 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 9 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 9 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 9 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 10 Status
Row # 10 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 10 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 10 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 10 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 10 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 7 Status
Row # 7 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 7 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 7 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 7 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 7 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 8 Status
Row # 8 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 8 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 8 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 8 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 8 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 9 Status
Row # 9 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 9 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 9 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 9 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 9 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 10 Status
Row # 10 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 10 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 10 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 10 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 10 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 11 Status
Row # 11 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 11 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 11 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 11 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 11 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 1 Status
Row # 1 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 1 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 1 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 1 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 1 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 2 Status
Row # 2 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 2 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 2 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 2 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 2 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 3 Status
Row # 3 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 3 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 3 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 3 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 3 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 4 Status
Row # 4 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 4 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 4 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 4 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 4 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row #5 Status
Row # 5 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 5 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 5 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 5 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 5 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 6 Status
Row # 6 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 6 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 6 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 6 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 6 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 7 Status
Row # 7 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 7 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 7 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 7 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 7 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 8 Status
Row # 8 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 8 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 8 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 8 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 8 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 9 Status
Row # 9 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 9 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 9 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 9 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 9 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 10 Status
Row # 10 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 10 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 10 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 10 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 10 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 11 Status
Row # 11 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 11 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 11 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 11 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 11 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
-
Row # 12 Status
Row # 12 - NIL-QA-ITR-061 - Modification Installation Works
-
Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.
-
PV Connection Modification Completion Date:
-
Row Orientation
-
Row Type
Row # 12 - PV Modification Works Commissioning Checks
-
Modification works complete and Installers are clear for safe commissioning activities to commence?
-
Commissioning Date
Row # 12 - Row Commissioning Checks - Visual
-
Polarity Correct
-
Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009
-
Correct conduit used and lengths correct
-
Correct SS cable ties used and secured
-
No tension on cable or joints with tracker at full tilt
-
Cable dressed so that there will be no snags throughout the complete movement of the tracker
Row # 12 - Row Commissioning Checks - Electrical Test
-
Polarity - Continuity test from 1st string to combiner box
-
Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)
-
Commisioning Comments
Row # 12 - Row Commissioning Checks - Photos
-
Loom extension installed?
-
PV Extension Crimp Joints (pile)
-
PV to Loom Crimp Joints (torque beam)
-
Overall Modification - completed works
ITR Sign Off Section
-
All rows QA checks complete, no faults observed and deemed safe to return to production.
-
Comments:
-
Nilsen Signature:
-
Dated (Nilsen):
-
Witnessed by Client or Authorised Client Representative?
-
Witness Signature:
-
Witness Signatory Company:
-
Witness Date: