Title Page

NIL-QA-ITR-065

  • Document Number :

  • Location
  • Site conducted

  • Block / PCU #
  • Combiner Box #

Test Equipment

  • Polarity Tester

  • Insulation Resistance Tester

  • Combiner Box - Exterior

Inspection Details

  • Please make sure that the correct row count in entered. If changed once report is started all row data will be lost and need to be re-entered, including photos.

  • PV Rows connected to Combiner Box :

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 7 Status

Row # 7 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 7 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 7 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 7 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 7 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 7 Status

Row # 7 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 7 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 7 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 7 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 7 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 8 Status

Row # 8 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 8 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 8 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 8 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 8 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 7 Status

Row # 7 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 7 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 7 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 7 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 7 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 8 Status

Row # 8 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 8 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 8 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 8 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 8 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 9 Status

Row # 9 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 9 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 9 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 9 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 9 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 7 Status

Row # 7 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 7 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 7 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 7 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 7 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 8 Status

Row # 8 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 8 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 8 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 8 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 8 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 9 Status

Row # 9 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 9 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 9 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 9 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 9 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 10 Status

Row # 10 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 10 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 10 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 10 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 10 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 7 Status

Row # 7 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 7 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 7 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 7 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 7 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 8 Status

Row # 8 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 8 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 8 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 8 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 8 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 9 Status

Row # 9 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 9 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 9 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 9 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 9 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 10 Status

Row # 10 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 10 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 10 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 10 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 10 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 11 Status

Row # 11 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 11 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 11 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 11 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 11 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 1 Status

Row # 1 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 1 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 1 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 1 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 1 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 2 Status

Row # 2 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 2 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 2 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 2 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 2 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 3 Status

Row # 3 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 3 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 3 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 3 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 3 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 4 Status

Row # 4 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 4 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 4 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 4 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 4 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row #5 Status

Row # 5 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 5 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 5 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 5 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 5 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 6 Status

Row # 6 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 6 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 6 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 6 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 6 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 7 Status

Row # 7 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 7 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 7 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 7 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 7 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 8 Status

Row # 8 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 8 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 8 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 8 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 8 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 9 Status

Row # 9 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 9 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 9 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 9 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 9 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 10 Status

Row # 10 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 10 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 10 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 10 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 10 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 11 Status

Row # 11 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 11 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 11 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 11 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 11 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

  • Row # 12 Status

Row # 12 - NIL-QA-ITR-061 - Modification Installation Works

  • Modification Installation Works Completed & NIL-QA-ITR-061 completed by installer.

  • PV Connection Modification Completion Date:

  • Row Orientation

  • Row Type

Row # 12 - PV Modification Works Commissioning Checks

  • Modification works complete and Installers are clear for safe commissioning activities to commence?

  • Commissioning Date

Row # 12 - Row Commissioning Checks - Visual

  • Polarity Correct

  • Cable and conduit dressed in accordance with section 2.9 of NIL-QA-ITP-009

  • Correct conduit used and lengths correct

  • Correct SS cable ties used and secured

  • No tension on cable or joints with tracker at full tilt

  • Cable dressed so that there will be no snags throughout the complete movement of the tracker

Row # 12 - Row Commissioning Checks - Electrical Test

  • Polarity - Continuity test from 1st string to combiner box

  • Insulation Resistance Test - Array Wiring to Earth ( > 1Meg Ohm)

  • Commisioning Comments

Row # 12 - Row Commissioning Checks - Photos

  • Loom extension installed?

  • PV Extension Crimp Joints (pile)

  • PV to Loom Crimp Joints (torque beam)

  • Overall Modification - completed works

ITR Sign Off Section

  • All rows QA checks complete, no faults observed and deemed safe to return to production.

  • Comments:

  • Nilsen Signature:

  • Dated (Nilsen):

  • Witnessed by Client or Authorised Client Representative?

  • Witness Signature:

  • Witness Signatory Company:

  • Witness Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.