Title Page
-
NIL-QA-ITR-066
-
Site conducted
-
Document Number :
-
Conducted on
-
Prepared by
-
Location
Block #
-
Combiner Box #
-
PV Row #
-
Row Type / Orientation
Inspection Details
-
ITR-065 Completed
-
ITR-065 Date Completed
-
All work compliant to PV Cable to PV Loom Connection Modification Methodology.
Post Installation - Visual Inspections
-
Cable polarity is correct
-
Adequate slack on cable assesed whilst tracker is at full tilt.
-
Length of split corrugated conduit is installed in accordance with install methodology.
-
Cable tie tension correct with cable tie buckle/joiner sitting on flat surface of torque beam not on corrugated conduit
-
PV Cable bending radius does not exceed manufactures specifications.
-
PV Loom extension installed?
-
PV Loom Dressing - N/S
-
PV Loom Dressing - E/W
-
Comments :
-
Inspected By :
-
Company :
- Nilsen
- SQE Solutions
- Signal Energy Australia
- Gentari
- OX2
- Other
-
Company Name :
-
Date :
-
Witnessed ?
-
Witnessed By :
-
Company :
- Nilsen
- SQE Solutions
- Signal Energy Australia
- Gentari
- OX2
- Other
-
Company Name :
-
Date :