Information
-
Monthly Safety Audit
-
Finishing Dept
-
Conducted on
-
Prepared by
-
Personnel
-
Emergency telephone numbers posted?
-
Emergency evacuation map displayed? Re.1.7
-
Electrical panels blocked?
-
Electrical Control Panel Door locked with key (Sheeter-1)?
-
Eyewash stations available and operational? (6-months)
Walk Areas
-
Floors and surfaces clean and free of debris?
-
Aisles marked?
-
Work surfaces dry to prevent slipping?
Fire Prevention
-
External exits signs illuminated?
-
Exit doors accessible?
-
Access to extinguishers?
Rolls/Pallet Storage Area
-
Rolls stacked straight?
-
Rolls within 2 inches?
-
Pallets stacked straight?
-
Aisles clear?
-
All storage at least 18" from sprinkler heads?
Sheeter #1
-
Machine guarding in place and operational?
-
Any oils spills or leaks on floor?
-
Necessary protective equipment being properly used?
New Sheeter
-
Machine guarding in place and operational?
-
Any oil spills or leaks on floor?
-
Necessary protective equipment being properly used?
-
Power-Truck Operator Daily Safety Checklist completed?