Does the supporting structure adequate to support the scaffold loads and integrity
-
Are sole boards in good condition and fully supported by the foundation
-
Have needles and ties been installed to the scaffold design.
-
Is the scaffold square and plumb?
-
There are gaps on the scaffold that exceed the AS1576 and SCOP 2009 limit of 225mm.
-
Has the scaffold been built with the correct components as per scaffold plan > 4m, inclusive of facade and end bracing, kickboards, containment (mesh or Brickguards) with containment mesh sufficient ties installed to Australian standards. No more than 2m of containment past your last tie.
-
Is there safe access and egress to all scaffolds and working platforms.<br>
-
Have all tie anchors been tested at every handover to 50kn. <br>These tie tests must be documented at time of handover on the tie checklist.
-
Is the scaffold suitable for the load rating required.
-
Are all penetrations handrailed off or covered and secured with AS1576 and SCOP2009 approved materials.
-
Are all lap boards in good order and are secured correctly
-
Are all full height face bracing fitted to end of scaffolds and at least to every third bay or as required per scaffold plan.
-
Are incomplete scaffolds blocked off and appropriate signage applied.
-
The scaffold that has been Erected or Adapted by NJS is fully compliant and meets the requirements of AS1576, AS4576 and SCOP 2009.
-