Information
-
Site ID
-
Site Name
-
Conducted on
-
PICOW Name
-
Location
-
Names and company names of all parties on site
ADMINISTRATION
-
RAMS on site
-
Have RAMS been viewed, completed, signed and match the works that are to be carried out onsite?
-
Has a dynamic risk assessment been filled out and signed by all onsite?
-
Does contractor have appropriate certificates or licensing to carry out works onsite?
-
Does mobile plant or equipment operator have all relevant documentation such as Service history, operators manual, risk assessment & SWMS, daily checklist and certificate or licensing. If yes, plant & equipment checklist must be completed.
WELFARE
-
Has vehicle parking locations been identified or explained?
-
Has first aid kit locations and first aiders been identified?
-
Have toilet locations been identified?
SITE H&S
-
Is TM/PM set up as per TM plan and suitable for works?
-
Has nearest hospital and medical centre locations been identified?
-
Has emergency assembly point location been identified?
-
Has site specific hazards been identified and detailed in the dynamic risk assessment?
SIGN OFF
-
Is the scaffolding built as per design and suitable for the proposed works?
-
Has all works been completed?
-
What works are outstanding?
-
PICOW to ensure completion pictures are taken before leaving site
-
Person conducting Site Induction