Information

  • Site ID

  • Site Name

  • Conducted on

  • PICOW Name

  • Location
  • Names and company names of all parties on site

ADMINISTRATION

  • RAMS on site

  • Have RAMS been viewed, completed, signed and match the works that are to be carried out onsite?

  • Has a dynamic risk assessment been filled out and signed by all onsite?

  • Does contractor have appropriate certificates or licensing to carry out works onsite?

  • Does mobile plant or equipment operator have all relevant documentation such as Service history, operators manual, risk assessment & SWMS, daily checklist and certificate or licensing. If yes, plant & equipment checklist must be completed.

WELFARE

  • Has vehicle parking locations been identified or explained?

  • Has first aid kit locations and first aiders been identified?

  • Have toilet locations been identified?

SITE H&S

  • Is TM/PM set up as per TM plan and suitable for works?

  • Has nearest hospital and medical centre locations been identified?

  • Has emergency assembly point location been identified?

  • Has site specific hazards been identified and detailed in the dynamic risk assessment?

SIGN OFF

  • Is the scaffolding built as per design and suitable for the proposed works?

  • Has all works been completed?

  • What works are outstanding?

  • PICOW to ensure completion pictures are taken before leaving site

  • Person conducting Site Induction

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.