Title Page

  • Conducted on

External

  • External Areas (Separate Audit)

  • External Doors (Separate Audit)

Lighting

  • G1-G9 Perimeter lighting (5x on posts)

  • G1-G9 Pedestrian Lights x5

  • G1-G9 Emergency lighting x10

  • G11-G18 Perimeter lighting (5x on posts)

  • G11-G18 Pedestrian Lights x4

  • G11-G18 Emergency lighting x10

  • Car park lighting (x3)

Safety & Security

  • Perimeter Fencing

  • G1-G9 Safety bollards x31

  • G11-G18 Safety bollards x22

  • Car parking & vehicle / pedestrian segregation

  • G1-G9 Fire extinguisher containers x3

  • G11-G18 Fire extinguisher containers x3

External Mechanical / Plant

  • Are the vehicle wash gully troughs clear

  • Is the air source heating plant secure & leak free

Other

  • Parks contractor gates open freely

  • Highways gates open freely

  • Cycle store safe

  • Salt bins free from defects

  • Any other issues

Internal

Lifts

  • Main entrance

  • TWBC entrance

  • Tap Flushing (Separate Audit)

Confirmation

  • Select date

  • Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.