Title Page
-
North Farm Lane Depot - Tap Flushing
-
Hot tap to reach 50 degrees or above within 1 minute / Cold tap to reach 20 degrees or lower within 2 minutes
Ground Floor
G2 : Site Managers Office
-
Sink
G9 : Vehicle Workshop
-
Lower sink No.1
-
Lower sink No.2
-
Mezzanine level sink
G11 : External WC
-
Toilet
-
Sink
G12 : Boat Workshop
-
Sink
First Floor Waste Partner
F6 : Waste Partner Staff Room
-
Waste Partner Staff Room Sink
F7 : Waste Partner Female
-
Toilet
-
Sink
-
Shower
F8 : Waste Partner Male
F8 : Urinals
-
Urinal 1
-
Urinal 2
-
Urinal 3
-
Urinal 4
-
Urinal 5
-
Urinal 6
F8 : Toilets
-
Toilet 1
-
Toilet 2
-
Toilet 3
F8 : Showers
-
Shower 1
-
Shower 2
-
Shower 3
-
Shower 4
First Floor Parks Partner
F9 : Parks Partner Office
-
Sink
F10 : Parks Partner Kitchen
-
Sink
First Floor TWBC
F14 : TWBC Male WC
-
Toilet
-
Sink
F15 : TWBC Female WC
-
Toilet
-
Sink
F16 : TWBC Disabled WC & Shower
-
Toilet
-
Sink
-
Shower