Title Page
-
Document No.
Electrical Inspection Report
-
Date and Time
Part 1 - General Information
-
Facility and Room Number
-
Listing Status
-
Equipment Name and Information
-
Property Number
Part 2 - External Inspection
-
Equipment Status
- New
- Modified
- Not Previously Approved
- In Use
- Void
- Retired
-
Enclosure
-
Operator not exposed to any hazard:
-
Not damaged:
-
Appropriate material:
-
Protects contents from operating environment:
-
Will contain any arcs, sparks, electrical explosions:
-
Power Source - Cord and Plug
-
Proper voltage, frequency, phasing, and ampacity rating for the plug and cord:
-
Not frayed or damaged:
-
Proper wiring of plug:
-
Installation according to NEC:
-
Proper loading and over current protection and/or equipment branch circuit:
-
Power Source - Direct Wired into Facility
-
Proper voltage, frequency, phasing, and ampacity rating for the plug and cord:
-
Installation according to NEC:
-
Proper loading and over current protection and/or equipment branch circuit:
-
Grounding:
-
All non-current carrying exposed metal is properly bonded and grounded (ground continuity test: less than 1 ohm to ground pin/conductor):
-
Ground conductor included if required:
-
External auxiliary ground (termination adequate):
-
Equipment ground is run with circuit conductors:
Approval Section
-
Result
-
Notice of Non-Compliance Issues
-
Issues
-
PLEASE CALL FOR RE-INSPECTION WHEN CORRECTIONS HAVE BEEN COMPLETED. APPROVAL IS REQUIRED.
-
NOTE: Approved equipment will be installed and used in accordance with the instructions provided by the designer/builder and ESO.
-
Attachments
-
Sketch
-
Pictures
-
Inspector
-
This inspection has been performed in accordance with the National Electrical Code , NFPA 70E, and the NREL LLP for Electrical Safety. This inspection is only for immediate danger issues and is not to replace a full NRTL inspection as per the NREL LLP.
-
National Renewable Energy Laboratory
15013 Denver West Parkway - Golden, CO 80401