Title Page
-
Client
-
Site Name
-
Asset Number
-
CSR Number
-
Conducted on
-
Prepared by
-
Location
ROOF TOP INSPECTION
-
Visually inspected PV array
-
Visually inspected hardware is still secure
-
Visually inspected wiring supports
-
Visually inspected the integrity of the earthing system
-
Visually inspected DC isolators for correct operation
-
Visually inspected all connectors are engaged correctly
-
Visually inspected labelling is still legible and correct
GROUND LEVEL INSPECTION
-
Inverter Operational
-
Monitoring Online
-
Solar Analytics Installed
-
Inverter screen is still legible
-
Visually inspected electrical wiring supports are still secure and intact
-
Visually inspected operation of DC isolators
-
Visually inspected connectors are engaged properly
WORKS COMPLETED
-
Work completed on this CSR
-
Photos of associated equipment
REPORT ANALYSIS
-
Supporting Documents Upload (CSR, PV Log Book, Battery Log Book)
-
Repairs urgently needed
-
Repairs suggested
-
Overall comments on system service
-
Technician signature