Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Valve Type: Gate
-
Task: Cycle through operating range
-
Frequency (Months): 6
-
Task: Inspect for leaks.
-
Frequency (Months): 6
-
Task: Lubricate stem packing.
-
Frequency (Months): 6
-
Task: Check/Replace valve packing.
-
Frequency (Months): 6
-
Task: Check stem alignment.
-
Frequency (Months): 6
-
Valve Type: Globe and Angle
-
Task: Cycle through operating range.
-
Frequency (Months): 3
-
Task: Inspect for leaks.
-
Frequency (Months): 3
-
Task: Adjust packing nut.
-
Frequency (Months): 6
-
Task: Test for tight shut-off.
-
Frequency (Months): 6
-
Valve Type: Butterfly
-
Task: Cycle through operating range.
-
Frequency (Months): 6
-
Task: Inspect stem for leaks.
-
Frequency (Months): 6
-
Task: Test for tight shut-off.
-
Frequency (Months): 6
-
Valve Type: Plug
-
Task: Cycle through operating range.
-
Frequency (Months): 3
-
Task: Inspect for leaks.
-
Frequency (Months): 3
-
Task: Lubricate.
-
Frequency (Months): 3
-
Valve Type: Ball
-
Task: Cycle through operating range.
-
Frequency (Months): 3
-
Task: Inspect for leaks.
-
Frequency (Months): 3
-
Task: Lubricate packing gland.
-
Frequency (Months): 3
-
Valve Type: Diaphragm
-
Task: Cycle through operating range.
-
Frequency (Months): 6
-
Task: Inspect valve stem.
-
Frequency (Months): 6
-
Task: Test for tight shut-off.
-
Frequency (Months): 6
-
Valve Type: Pinch
-
Task: Cycle through operating range.
-
Frequency (Months): 6
-
Task: Inspect valve stem.
-
Frequency (Months): 6
-
Task: Test for tight shut-off.
-
Frequency (Months): 6
-
Valve Type: Swing and Lift Check
-
Task: Disassemble and inspect.
-
Frequency (Months): 24
-
Task: Clean.
-
Frequency (Months): 24