1. System Parameters
-
Summer peak demand rate ($ / kW) : __________
-
Summer energy use rate ($ / kWh) : __________
-
Winter peak demand rate ($ / kW) : __________
-
Winter energy use rate ($ / kWh) : __________
-
# of months at the summer rates : __________
-
# of months at the winter rate: __________
-
Generator loading (kW): __________
-
Hours of operation per month: __________
-
Generator burn rate (gal / hr): __________
-
Generator run cost ($ / kWh): __________
-
2. Demand Charge Savings
-
[Summer Demand Rate ✖️ Generator Loading (kW) ✖️ # of Summer Months] ➕ [Winter Demand Rate ✖️ Generator Loading (kW) ✖️ # of Winter Months] = __________ Demand Savings ($)
-
3.Energy Use Savings
-
Generator Loading (kW) ✖️ Hours of Operation per Month ✖️ [Summer Use Rate ($ / kWh) ✖️# of Summer Months ➕ Winter Use Rate ($ / kWh) ✖️ # of Winter Months = __________ Energy Use Savings ($)
-
4. Fuel Cost
-
Generator Burn Rate ✖️ Hours of Operation per Month ✖️ Fuel Cost ✖️ 12 = __________ Fuel Cost ($ / yr)
-
5. Maintenance Cost
-
Generator Run Cost ($ / kWh) ✖️ Generator Loading (kW) ✖️Hours of Operation per Month ✖️ 12 = __________ Annual Maintenance Cost ($)
-
6. Annual Savings
-
Demand Savings ($) ➕ Energy Use Savings ($) ➖ Fuel Cost ($) ➖ Annual Maintenance Cost ($) = __________ Annual Savings ($)