Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • 1. System Parameters

  • Summer peak demand rate ($ / kW) : __________

  • Summer energy use rate ($ / kWh) : __________

  • Winter peak demand rate ($ / kW) : __________

  • Winter energy use rate ($ / kWh) : __________

  • # of months at the summer rates : __________

  • # of months at the winter rate: __________

  • Generator loading (kW): __________

  • Hours of operation per month: __________

  • Generator burn rate (gal / hr): __________

  • Generator run cost ($ / kWh): __________

  • 2. Demand Charge Savings

  • [Summer Demand Rate ✖️ Generator Loading (kW) ✖️ # of Summer Months] ➕ [Winter Demand Rate ✖️ Generator Loading (kW) ✖️ # of Winter Months] = __________ Demand Savings ($)

  • 3.Energy Use Savings

  • Generator Loading (kW) ✖️ Hours of Operation per Month ✖️ [Summer Use Rate ($ / kWh) ✖️# of Summer Months ➕ Winter Use Rate ($ / kWh) ✖️ # of Winter Months = __________ Energy Use Savings ($)

  • 4. Fuel Cost

  • Generator Burn Rate ✖️ Hours of Operation per Month ✖️ Fuel Cost ✖️ 12 = __________ Fuel Cost ($ / yr)

  • 5. Maintenance Cost

  • Generator Run Cost ($ / kWh) ✖️ Generator Loading (kW) ✖️Hours of Operation per Month ✖️ 12 = __________ Annual Maintenance Cost ($)

  • 6. Annual Savings

  • Demand Savings ($) ➕ Energy Use Savings ($) ➖ Fuel Cost ($) ➖ Annual Maintenance Cost ($) = __________ Annual Savings ($)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.