Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • 1. Application Data

  • Summer Production Charge ($ / kW): __________

  • Summer Distribution Charge ($ / kW): __________

  • Number of Months at Summer Rate: __________

  • Summer Controllable Load (kW): __________

  • Winter Production Charge ($ / kW):

  • Winter Distribution Charge ($ / kW):

  • Number of Months at Winter Rate: __________

  • Winter Controllable Load (kW): __________

  • 2. Summer Demand Savings

  • Summer Demand Charge ($ / kW) ✖️ Summer Controllable Load (kW) ✖️ Load Factor ✖️ Number of Months at Summer Rate = __________ Summer Demand Savings ($)

  • 3. Winter Demand Savings

  • Winter Demand Charge ($ / KW) ✖️ Winter Controllable Load (kW) ✖️ Load Factor ✖️ Number of Months at Winter Rate = __________ Winter Demand Savings ($)

  • 4. Total Demand Savings

  • Summer Demand Savings ($) ➕ Winter Demand Savings ($) = __________ Total Demand Savings ($)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.