Building Modification: ____________________
-
1. Existing Construction
-
[Annual Heating Energy Use (million Btu) ✖️ Heating Energy Unit Cost ($ / million Btu)] ➕ [Annual Cooling Energy Use (million Btu) ✖️ Cooling Energy Unit Cost ($ / million Btu)] = __________ Annual a Cost ($)
-
2. Modified Construction
-
[Annual Heating Energy Use (million Btu) ✖️ Heating Energy Unit Cost ($ / million Btu)] ➕ [Annual Cooling Energy Use (million Btu) ✖️ Cooling Energy Unit Cost ($ / million Btu) = __________ Annual Cost ($)
-
3. Cost Savings
-
Existing Annual Cost ($) ➖ Modified Annual Cost ($) = __________ Annual Cost Savings ($)