Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Building Modification: ____________________

  • 1. Existing Construction

  • [Annual Heating Energy Use (million Btu) ✖️ Heating Energy Unit Cost ($ / million Btu)] ➕ [Annual Cooling Energy Use (million Btu) ✖️ Cooling Energy Unit Cost ($ / million Btu)] = __________ Annual a Cost ($)

  • 2. Modified Construction

  • [Annual Heating Energy Use (million Btu) ✖️ Heating Energy Unit Cost ($ / million Btu)] ➕ [Annual Cooling Energy Use (million Btu) ✖️ Cooling Energy Unit Cost ($ / million Btu) = __________ Annual Cost ($)

  • 3. Cost Savings

  • Existing Annual Cost ($) ➖ Modified Annual Cost ($) = __________ Annual Cost Savings ($)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.