Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
1. System Data
-
Chiller Full-Load Capacity (tons):
-
Chiller Full-Load Rating (kW/ton, or 1,000 lb/ton):
-
Equivalent Full-Load Operating Hours (hr):
-
Energy Cost Rate ($/kWh or $/1,000 lb):
-
2. Annual Energy Savings
-
Chiller Capacity (tons)✖️Chiller Rating (kW/ton) or (1,000 lb/ton)✖️Equivalent Full-Load Hours (hr)✖️Energy Rate ($/kWh) or ($/1,000 lb)✖Efficiency Increase✖️Condenser Water Reset Factor = __________ Annual Energy Savings ($)
-
3. Condenser Water Reset Factor
-
Operating Hours Per Day Multiplication Factor 8 0.25 16 0.40 20 0.55 24 0.70