Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
1. Installation Data
-
Conventional Chiller Full-Load Capacity (tons):
-
Conventional Chiller Full-Load Rating (kW/ton):
-
Ice Storage System Chiller Full-Load Rating (kW/ton):
-
Equivalent Full-Load Operating Hours (hr):
-
Summer On-Peak Energy Charge ($/kWh):
-
Summer Off-Peak Energy Charge ($/kWh):
-
Summer On-Peak Demand Charge ($/kW):
-
2. Conventional Chiller System Energy Costs
-
Chiller Capacity (tons)✖️Chiller Rating (kW/ton)✖️Equivalent Full-Load Hours (hr)✖️0.75 (Daytime Load Factor)✖️Summer On-Peak Energy Charge ($/kWh) = __________ Conventional System Annual Energy Cost ($)
-
3. Conventional Chiller System Demand Charges
-
Chiller Capacity (tons)✖️Chiller Rating (kW/ton)✖️Summer On-Peak Energy Charge ($/kWh)✖️Number of Months Peak Demand Rate in Effect = __________ Conventional System Annual Demand Cost ($)
-
4. Ice Storage System Energy Costs
-
Chiller Capacity (tons)✖️Chiller Rating (kW/ton)✖️Equivalent Full-Load Hours (hr)✖️0.75 (Daytime Load Factor)✖️Summer Off-Peak Energy Charge ($/kWh) = __________ Ice Storage System Annual Energy Cost ($)
-
5. Ice System Savings
-
Conventional System Annual Energy Cost ($)➕Conventional System Annual Demand Cost ($)➖Ice Storage System Annual Energy Cost ($) = __________ Ice System Savings ($)