Did the candidate complete the following tasks correctly?
-
Prepare test equipment for use? <br>Performance criteria: 1.2, 2.1
-
Check that calibration date was current prior to proceeding?<br>Performance criteria: 2.1
-
Undertake self check of unit & earth reel? <br>Performance criteria 2.1
-
Fit low voltage insulated gloves & rigger gloves prior to attaching AVDD or bridging conductors to service line?
-
Push earth steak into ground at least 1.5m away from line?<br>Performance criteria 1.5
-
Connect elephant clip to test point ensuring good contact<br>performance criteria: 1.1, 3.1
-
Check AVDD for presence of an alarm<br>performance criteria: 1.1, 2.2, 3.2
-
Ask candidate what they should do if an alarm sounds. Is response correct?
-
Ensure unit & earth cable are placed in best position to prevent trip hazard
If service is safe to work on, proceed with the following
-
Wearing protective gloves, proceed to attach bridging conductor either side of service line being worked on.
Upon completion of works
-
Removal of bridging conductor (gloves on)
-
Removal of AVDD (gloves on)