Title Page
-
Carried out by:
-
Add location
-
Which yard?
-
Date of Insp / Obs:
-
Foreman
-
Weather Conditions
Inspection Report
Section 1 - Communication
-
Safety Instructions/Incident Learning’s
-
PDO Second Alerts/ HSE Flash
-
Work Stoppages
-
Super Wednesday
-
Work Instruction/Toolbox Talks/Reflective Learning’s
-
10 Q’s for Safe lift
-
Supervisor driver communication, ensure PPE compliance, safe standing area identified
-
Lift plans m/s available approved
Section 2 - Welfare
-
Toilets and wash facilities, working condition, soap available, hand drying available, cleanliness
-
Refreshment/Rest area, drinking water and cups available, cleanliness, shaded area etc
-
Housekeeping, all work areas clear of debris e.g. dunnage etc
-
Summer time working is managed and temperatures are monitored
-
AC or shade available in rest areas
-
Designated safe walking areas, safe and level ground
Section 3 - Equipment & Machinery
-
Crane and forklift daily defect reports completed by operator
-
Crane and forklift daily defect reports checked by the supervisor
-
7 day crane functionality tests completed
-
Crane and Forklift lifting certification in date
-
Lifting equipment in good condition, certified correct colour coded
-
Working at height Management Platforms, ladders and safety harness available and certified as required
Section 4 - PPE & Safety Equipment
-
Correct type of Gloves for operation (Impact/Normal)
-
Hard Hats Supervisor red, crew white, new hand green
-
Eye Protection
-
Coveralls
-
Safety Footwear
-
Hi Viz Vest
Section 5 - Operations
-
Condition of load checked before loading/offloading operation
-
Foreman/supervisor is in control of operation
-
Foreman/supervisor is providing clear hand signals to operators
-
Tag lines available and used and in good condition
-
Hands off tools – Push pull
-
Are all personnel standing out the line of fire? e.g. driver standing in safe location
-
Safety harnesses used as required during unloading loading operations
-
Correct number of crew as required in procedures
-
Banksman are available and identifed
-
Wind speed acceptable for lifting operations – anemometer used
-
Wheel chocks available and used
-
Truck engine switched off during operation
-
All employees have the correct training. i.e. slots. R N B and plant licences
Section 6 - Load Security
-
Condition and availability of load security items as per load requirements
-
Dunnage and chocks used
-
Load security checked prior to departure by supervisor – 1.5 metre max overhang, correct load restraints used
-
Driver aware of load checks required during journey
Section 7 - Stack Control
-
Stacks below 1.8 metres and aligned
-
Stacks have dunnage and chocks
-
Stack stanchions in place and upright