Title Page
-
Project Address:
-
Customer Name/Address:
-
Inspection Date:
-
Prepared by
Mains Extension
-
Mains Extension Required?
-
Installed how?
- Open Cut
- Direction Drill
- Thrust
-
Length of Mains Extension (m):
-
Photo of Mains Extension Alignment:
Submain
-
Is Submain Required?
-
Installed how?
- Open Cut
- Directional Drill
- Thrust
- Open Trench
-
Length of Submain (m):
-
Photo of Submain Alignment:
Service
-
Number of Services:
-
Installed how?
- Open Cut
- Directional Drill
- Thrust
- Open Trench
-
Service Size:
- 15mm
- 15mm Inserted 32mm
- 25mm
- 25mm Inserted in 50
- 32mm
- 50mm
-
Service Length (m):
-
Meter Position Photo:
Traffic Management
-
TM Required:
- All Works Inside Boundary
- Footpath Diversion
- Footpath Closure
- Shoulder Closure
- Contra Flow
- Stop Go
Additional Information
-
Reinstatement Required?
- None
- Temporary Cold Mix
- Asphalt Footpath
- Asphalt Road
- Concrete Footpath
- Concrete Vehicle Crossing/ROW
- Concrete Road
- Kerb & Channel
- Cobblestone
-
Enter Size Required (m2)
-
Digger Required?
-
Boundary Kit/Backing Board?
Notes:
-
Notes/Obstacles:
-
Further Investigation/Plans Required?
-
Is an RO required?
-
Is an NRO required?
-
GIS Screenshot: