Title Page
-
Project Address:
-
Customer Name/Address:
-
Inspection Date:
-
Prepared by
Standard New Connection (Thrust)
-
Standard New Connection (Thrust) Job?
-
Number of Service(s)?
-
Installed how?
- Open Cut
- Thrust
-
Length of Service(s) (m):
-
Meter Position Photo:
Standard New Connection (PIT/Open Trench)
-
Standard New Connection (PIT/Open Trench) Job?
-
Number of Service(s)?
-
Length of Service(s) (m):
-
Meter Position Photo:
Relocation
-
Relocation?
-
Relocation Length (m)?
-
Relight required?
-
Existing Meter Location:
-
New Meter Location:
Traffic Management
-
TM Required:
- All Works Inside Boundary
- Footpath Diversion
- Footpath Closure
- Shoulder Closure
- Contra Flow
- Stop Go
Additional Information
-
Reinstatement Required?
- None
- Temporary Cold Mix
- Asphalt Footpath
- Asphalt Road
- Concrete Footpath
- Concrete Vehicle Crossing/ROW
- Concrete Road
- Kerb & Channel
- Cobblestone
-
Enter Size Required (m2)
-
Digger Required?
-
Boundary Kit/Backing Board?
Notes:
-
Enter Notes:
-
GIS Screenshot: