Information
-
Title
-
Document No.
-
Job No/Site
-
Conducted on
-
Prepared by
General Information
-
General Information
-
Visit
-
Site Supervisor
-
Include DB quantity and/or details?
-
Estimated no DB's
-
Estimated No of Circuits
-
Emergency Lighting Certificate Required?
-
Fire Alarm Certificate Required?
-
Electrical Installation Certificate Required?
-
Job to be Part P Registered?
-
Program
-
Project Programmed Completion Date
-
Next Visit Date agreed
-
Programmed Testing Start Date
-
Programmed Testing End Date
-
Testing carried out by?
-
Dead Testing
-
Final Testing
-
Certification
-
Progress Notes:
-
Site Issues
-
Details:
-
Progress Notes
-
Details
-
Retained Circuits/Equipment?
-
Circuits
-
Number of Retained Circuits
-
Distribution Boards
-
Number od DB's
-
Switchgear
-
Number and Details of the Switchgear
-
Current ECR Avilable?
-
ECR No
-
ECR Date
-
Kept by:
-
Winters Instructed to complete ECR?
-
Details:
Site Survey - H&S
-
H&S Survey carried out?
Health & Safety File
-
Winters Induction signed?
-
Toolbox talks carried out and schedule up to date & signed?
-
Winters sign in register up to date and signed?
-
Please list names of all Winters operatives at the time of the visit
-
Safe Isolation Procedure included in Site H&S File?
-
Carry out toolbox talk about Safe Isolation Procedure
-
Is the Safe Isolation Procedure followed on site?
-
Carry out toolbox talk about Safe Isolation Procedure
-
Details:
-
RAMS included in the file and signed by operatives?
Site Survey
-
Winters PPE used?
-
Is there any new live circuits?
-
'Dead' test results available and kept in H&S File on site?
Site Survey - Equipment, Plant & Tools
-
Equipment
-
Equipment Register up to date
-
Comments
-
Equipment used on site
- Steps
- Podiums
- Mobile Towers
- Chop Saw
- Test Equipment
- Power tools
-
Number of Steps used
-
Number of Power Tools used on site
-
Number of Podiums used on site
-
Number of Test Equipment used on site
-
Test Equipment
Item
-
Model
-
Serial Number
-
Calibration Date
-
Calibration Certificate Number
-
Next Calibration due date
-
Tested against 'Check Box'
-
Details:
-
Number of Mobile Towers used on site
-
Number of Chop Saws used on site
-
Resources Condition
-
Ladders used on site satisfactory condition and adequately used
-
Details:
-
Photo:
-
Podiums used on site satisfactory condition and adequately used ?
-
Details:
-
Photo:
-
Scaff Tag present and up to date?
-
PLEASE UPDATE SCAFF TAG
-
Towers used on site satisfactory condition and adequately used?
-
Details:
-
Photo:
-
Scaff Tag present and up to date?
-
PLEASE UPDATE SCAFF TAG
-
Details:
-
Photo:
-
Power Tools in good working order and adequately used?
-
Details:
-
Photo:
-
Test Equipment in good working order and adequately used ?
-
Details
-
Photo
Quality & Snagging - Previous Visit
-
Is this first visit?
-
Go to next section...
-
Remedial actions completed from previous visit?
-
Items not completed
- Cabling
- Containment
- Back Boxes
- Earthing & Bonding
- Distribution Boards
- Face. plates
-
Cable supports
-
Segregation of conductors
-
Cables installation method
-
Cable routing
-
Mechanical protection
-
Other
-
Fixings
-
Edge protection against abrasion
-
Bonding
-
Trunking lid
-
Other
-
Fixings
-
Cable entry holes
-
Fly leads
-
Other
-
Installation method
-
Size
-
Labels
-
Other
-
Fixings
-
Cable entry holes
-
Circuit Protective Devices
-
Cable terminations
-
Sleeving
-
Cable identification (ferrules)
-
Labelling
-
Phase sequencing
-
Other
-
Fixing method
-
Sleeving
-
Cable termination
-
Labels
-
Other
-
Date of the previous visit
Quality Snagging - Current Visit
-
Scope of Works
-
Cable type used?
- T&E
- Singles
- SWA
- FP
- Other
-
Cabling
-
Cable supports correct?
-
Segregation of circuits correct?
-
Cables installed & clipped correctly?<br>
-
Cable routing correct?
-
Mechanical protection installed?
-
Other?
-
Containment
-
Fixings adequate?
-
Edges protected?
-
Bonded?
-
Trunking lid fitted & secured?
-
Other?
-
Back Boxes
-
Fixing adequate?
-
Cable entry holes protected agains abrasion?
-
Fly leads installed?
-
Other?
-
Earthing & Bonding
-
Correctly Installed?
-
Adequately Sized?
-
Correctly Labelled?
-
Other?
-
Distribution Boards
-
Fixing Adequate?
-
Cable entry holes protected against abrasion?
-
Circuit Protective Devices (CPD's) correct?
-
Cables correctly terminated? (i.e.: copper not showing on termination)
-
Cables sleeved?
-
Cable circuit identification in place?
-
Required DB labelling in place?
-
Phase sequencing correct?
-
Other?
-
Face Plates
-
Secure and level?
-
Cables sleeved?
-
Fixings adequate?
-
No copper showing on terminations?
-
Labelled?
-
Other?
-
Any Repair/Remedial Work Required?
-
Any deviations from Specification
Recommendations
-
Recommendations
-
Access Equipment
-
Details:
-
Plant on Hire
-
Details:
-
Training
-
Details:
-
Test Equipment
-
Details:
-
Power Tools
-
Details:
-
Other
-
Recommendation
Item
-
Details:
Sign Off
-
Sign Off
-
Sign Off
-
Engineer Comments:
-
By signing I agree all the above is correct
-
Sign off by auditor