Information
-
Client / Site
-
Conducted on
-
Prepared by
Pool service checklist
-
Select date
Water Tests
-
Salt reading (between 3500 & 5500)
-
Water temperature
-
Free chlorine reading PPM
-
Total Chlorine reading PPM (3-5PPM)
-
Ph reading (7.2 - 7.6)
-
Total Alkalinity reading (90 - 150)
-
Calcium hardness reading (10 - 280)
-
Cyanuric acid (Stabiliser) reading (35 - 70)
-
List of chemicals used to balance water chemistry
-
From a visual inspection, is the pool clear of any algae such as black spot?
Checklist of On-site Duties
-
Pool Vacuumed
-
Cleaned out skimmer(s)
-
Cleaned out pump basket(s)
-
Cleaned or back washed filter
-
Chlorinator cell acid washed
-
Time clock set to correct time and left on "Auto"
-
Chlorinator cell left switched "on"
-
Waterline clean and free of scum
-
Water level checked and topped up if required
-
After inspection the pool pump(s) is in good working order, running quietly and the seal for the wet end appears leak free.
-
CPR sign clearly readable and visible
-
Filter shed and pool surrounds clean and rubbish free
-
Pool gate(s) in working order and left closed
-
Client Onsite at time Service?
-
Signature